![](/html/99/99f8/99f8d5b12d39259c6df8cf24d7aaae67407101b42b5ef9296aadf924471aa518/bg1.png)
VENCO Havalandırma ve Makina San. ve Tic. A.Ş.
2004. Cad. No:5 45400 OSB Turgutlu – MANISA / TURKIYE
Tel: +90 (236) 332 5070 Fax: +90 (236) 332 5030
www.venco.com.tr
venco@venco.com.tr
DOWNLOAD INSTALLATION – OPERATION & MAINTENANCE INSTRUCTION
AND READ BEFORE START-UP THE UNIT
AND KEEP IT WITHIN EASY REACH OF SERVICE TECHNICIAN.
QUICK START GUIDE
HEAT RECOVERY UNITS VHR MODELS
FROM www.venco.com.tr
![](/html/99/99f8/99f8d5b12d39259c6df8cf24d7aaae67407101b42b5ef9296aadf924471aa518/bg2.png)
1. INSTALLATION
Download Installation – Operation and Maintenance Instructions forum www.venco.com.tr .Read before
start-up the unit and keep it.
During Installation; EN 60204-1 rules should be implemented during the final assembly. Before the
installing of heat recovery units, customers should control whether weight and dimensions of the stations are
suitable for the places from where stations will pass through and assembly will be carried out. There should
be sufficient amount of place around the unit to be able to give service and for piping connections. Heat
recovery units should be assembled onto a hard and flat base.
2013.07 1 / 3
Figure 1.1. Connection Schematic