CONTENTS (Continued)
Section Page
10. BURNER AND SUPPLY PIPE INSTALLATION 29
10.1 Burner and supply pipe installation. 29
10.2 Preliminary burner checks. 29
10.3 Inlet pressure check. 30
11. CERAMIC WALLS INSTALLATION 30
12. FASCIA AND CONTROL LINKAGE 31
13. FITTING THE CERAMIC FUEL EFFECT 35
14. FIREFRONT / BOTTOM COVER INSTALLATION 35
15. FULL OPERATING CHECKS 36
15.1 Checking the control settings. 36
15.2 Check for spillage. 37
15.3 Flame supervision and spillage monitoring system. 38
16. FINAL REVIEW 39
17. SERVICING & PARTS REPLACEMENT 40
17.1 Checking the aeration setting of the burner. 41
17.2 To remove the ignition microswitch. 41
17.3 To remove the gas shut-off microswitch. 41
17.4 To remove the fascia. 42
17.5 To replace the control slide unit. 42
17.6 To replace the slider control knob. 43
17.7 To remove the complete burner unit. 44
17.8 To remove the electronic ignition generator. 44
17.9 To remove the thermocouple interrupter block. 44
17.10 To remove the pilot unit. 45
17.11 To remove the shut-off tap. 45
17.12 To remove the gas flow rate controller. 46
17.13 To replace the burner. 47
17.14 To remove the main burner injector. 47
17.15 To remove the appliance from the fireplace. 47
© GDC Group Ltd. 2011
Page 6
INSTALLER GUIDE