Vailant ecoTEC plus 415, ecoTEC plus 418, ecoTEC plus 424, ecoTEC plus 430, ecoTEC plus 435 Installation Manual

...
For the competent person
Installation manual
Air/flue gas systems
ecoTEC plus, HOME REGULAR, HOME COMBI, HOME SYSTEM, ecoFIT sustain, ecoFIT pure
GB, IE
Installation manual
Berghauser Str. 40 D-42859 Remscheid Tel. +49 21 91 18‑0 Fax +49 21 91 18‑2810 info@vaillant.de www.vaillant.de
Contents
2 Installation manual 0020200969_04
Contents
1 Safety .................................................................... 3
1.1 Action-related warnings ......................................... 3
1.2 Intended use.......................................................... 3
1.3 General safety information .................................... 3
1.4 CE certification....................................................... 5
1.5 Regulations (directives, laws, standards) .............. 5
2 Notes on the documentation .............................. 6
2.1 Observing other applicable documents ................. 6
2.2 Storing documents................................................. 6
2.3 Applicability of the instructions .............................. 6
3 Certified air/flue gas systems and
components ......................................................... 7
3.1 System overview, 60/100 mm diameter ................ 7
3.2 System overview, 80/125 mm diameter ................ 8
4 System conditions............................................... 9
4.1 Route of the air/flue pipe in buildings .................... 9
4.2 Location of the opening ......................................... 9
4.3 Disposing of condensate ....................................... 9
4.4 Maximum pipe lengths........................................... 9
5 Installation.......................................................... 13
5.1 Installing the connection piece for the
80/125 mm diameter air/flue pipe ........................ 13
5.2 Installing horizontal wall/roof ducts...................... 13
5.3 Installing the direct, rear, telescopic wall duct –
article number 0020228140................................. 16
5.4 Installing terminal kits for 60/100 mm diameter
air/flue gas systems............................................. 17
5.5 Installing the vertical roof duct ............................. 22
5.6 Installing the concentric connection, 60/100 mm diameter, to the air/flue gas
system for negative pressure .............................. 26
5.7 Installing the sliding sleeve, elbows and
extensions............................................................ 27
6 Customer service............................................... 38
Index ...................................................................................39
Safety 1
0020200969_04 Installation manual 3
1 Safety
1.1 Action-related warnings
Classification of action-related warnings
The action-related warnings are classified in accordance with the severity of the possible danger using the following warning signs and signal words:
Warning symbols and signal words
Danger!
Imminent danger to life or risk of severe personal injury
Danger!
Risk of death from electric shock
Warning.
Risk of minor personal injury
Caution.
Risk of material or environmental damage
1.2 Intended use
The air/flue pipes described here are con­structed using state-of-the-art technology in accordance with the recognised safety rules and regulations. Nevertheless, there is still a risk of injury or death to the system operator or others or of damage to the products and other property in the event of improper use or use for which the products are not intended.
The air/flue pipes mentioned in these instruc­tions must only be used in conjunction with the product types mentioned in these instruc­tions.
Any other use that is not specified in these instructions, or use beyond that specified in this document, shall be considered improper use.
Intended use includes the following:
– observance of accompanying operating,
installation and servicing instructions for all system components
– installing and fitting the product in accord-
ance with the product and system approval
– compliance with all inspection and main-
tenance conditions listed in the instruc­tions.
1.3 General safety information
1.3.1 Risk caused by inadequate qualifications
The following work must only be carried out by competent persons who are sufficiently qualified to do so:
InstallationDisassemblyInstallationStart-upMaintenanceRepairDecommissioning
Observe all instructions that are included
with the product.
Proceed in accordance with the current
state of technology.
Observe all applicable directives, stand-
ards, laws and other regulations.
1.3.2 Risk of poisoning due to escaping flue gas
Improperly installed flue gas pipes may cause flue gas to escape.
Before starting up the product, check that
the whole air/flue pipe is securely fastened and leak-tight.
The flue gas pipe may become damaged by unforeseeable external influences.
As part of the annual maintenance, inspect
the flue gas installation in terms of: – external faults such as brittleness and
damage
– safe pipe connections and secure
fastenings
1.3.3 Risk of death from escaping flue gas
Ensure that all inspection and measure-
ment openings in the air/flue pipe that are within the building and can be opened are always closed for start-up and during oper­ation.
Flue gas may escape from leaking pipes or damaged seals. Mineral-oil-based greases can damage the seals.
1 Safety
4 Installation manual 0020200969_04
When installing the flue gas installation,
use only flue gas pipes that are made from the same material.
Do not install any damaged pipes.File off sharp burrs and chamfer the ends
of the pipes before installing them, and dispose of the shavings.
Never use mineral-oil-based grease for the
installation.
To facilitate the installation, use only wa-
ter, standard commercial soft soap or, if required, the supplied lubricant.
Mortar residues, shavings, etc., in the flue gas route may prevent the flue gas from flow­ing outdoors as intended, and this flue gas may escape into the dwelling instead.
After installation, remove all mortar
residues, shavings, etc., from the air/flue pipe.
1.3.4 Risk of death from leaks in the flue gas route
Extensions that are not fixed to the wall or ceiling may become disengaged due to sag­ging or thermal expansion.
Ensure that every extension is fixed to the
wall or ceiling by means of a pipe clamp. The distance between two pipe clamps must not be greater than the length of the extension, and must not exceed 2 m.
Condensate that collects inside the flue in certain areas can damage the flue gas pipe seals.
Install the horizontal flue pipe to the
product with a downward gradient. – Downward gradient to the product: 3°
Note
3° corresponds to a downward gradient of approx. 50 mm per metre of pipe length.
1.3.5 Risk of fire and damage to electronics caused by lightning
If the building is equipped with a lightning
protection system, incorporate the air/flue pipe into the lightning protection.
If the flue gas pipe (parts of the air/flue
pipe situated outside the building) contains
metal materials, incorporate it into the po­tential equalisation system.
1.3.6 Risk of injury from ice formation
Where air/flue pipes penetrate the roof, the water vapour contained in flue gas may pre­cipitate as ice on the roof or the roof struc­tures.
Ensure that this ice formation does not
slide from the roof.
1.3.7 Risk of damage to the structure of the building due to moisture
As a result of improper installation, water may penetrate the building and cause material damage.
Observe the definitions in the directives for
the planning and implementation of roofs with seals.
1.3.8 Product damage caused by adjacent channel vents
1 m
1 m
3 m
H › 0
Extremely damp exhaust air escapes from the channel vents. This may condense in the air pipe and cause damage to the product.
Observe the requirements for minimum
clearances in accordance with the illustra­tion.
1.3.9 Requirements for the air/flue pipe opening
As a result of improper installation, water may penetrate the building and cause material damage.
Safety 1
0020200969_04 Installation manual 5
Observe the requirements for the air/flue
pipe opening in the boiler's installation instructions.
1.3.10 Risk of material damage caused by using an unsuitable tool
Use the correct tool to tighten or loosen
screw connections.
1.4 CE certification
The heat generators are certified as gas con­sumption appliances with attached flue gas installation in accordance with the EU gas ap­pliances directive 2009/142/EC. This Install­ation Manual is a component of the certifica­tion and is cited in the type testing certificate. In compliance with the regulatory statutes of this installation manual, the proof of usabil­ity of the elements identified by Vaillant article numbers that are designed for the flue pipe is provided. If you do not use certified elements for the Vaillant air/flue gas pipe when in­stalling the heat generators, this voids the CE conformity of the heat generator. We there­fore strongly recommend that you fit Vaillant air/flue gas systems.
1.5 Regulations (directives, laws,
standards)
Observe the national regulations, stand-
ards, guidelines and laws.
2 Notes on the documentation
6 Installation manual 0020200969_04
2 Notes on the documentation
2.1 Observing other applicable documents
You must always observe the installation instructions for
the installed heat generator.
2.2 Storing documents
Pass these instructions and all other applicable docu-
ments on to the system operator.
2.3 Applicability of the instructions
These instructions apply only for the heat generators named in the other applicable documents, hereinafter referred to as the "product".
Certified air/flue gas systems and components 3
0020200969_04 Installation manual 7
3 Certified air/flue gas systems and components
3.1 System overview, 60/100 mm diameter
Art. no. Air/flue gas systems, concentric
0020223472 Vertical roof duct (black, RAL 9005), with collar
303982 Vertical ridge roof duct
0020228140 Direct, rear-side, telescopic flue gas pipe
0020219517 Horizontal wall duct, 0.7 m
0020219518 Horizontal telescopic wall duct (only available in black)
0020219519 Horizontal wall duct, 1.7 m
3.1.1 Components
The following table lists the air/flue gas systems that are permitted as part of the system certification, along with their certified components.
Optional connection accessories Art. no. 0020223472 303982 0020228140 0020219517
0020219519
0020219518
Extension (PP), concentric, 470 mm, 60/100 mm diameter
303902 X X X X
Extension (PP), concentric, 970 mm, 60/100 mm diameter
303903 X X X X
Extension (PP), concentric, 1970 mm, 60/100 mm diameter
303905 X X X X
Extension (PP), concentric, 3960 mm,
60/100 mm diameter
1)
0020138174 X X X X
45° elbow (2 x), concentric 303911 X X X X
87° elbow, concentric 303910 X X X X
Pipe clamps (5 x), 100 mm diameter 303821 X X X X
Adjustable pipe clamps (3 x), 100 mm diameter
303935 X X X X
Sliding sleeve 303915 X X X X
Pitched roof tile 009076
(black)
X
Universal pitched roof tile 303980 X
Flat roof penetration collar 009056 X
Telescopic extension, 440-690 mm, 60/100 mm diameter
303906 X X
Telescopic offset piece 303919 X X
Black terminal kit for horizontal air/flue pipe
0020219537 X X
Variable terminal kit (VTK), black
2)
0020219529 X X X
Variable terminal kit (VTK), white
2)
0020219530 X
Extension for variable terminal kit (VTK),
60 mm diameter, 1 m, black
2)
0020219539 X X X
Extension for variable terminal kit (VTK),
60 mm diameter, 1 m, white
2)
0020219540 X
87° elbow for variable terminal kit (VTK),
black
2)
0020219543 X X X
87° elbow for variable terminal kit (VTK),
white
2)
0020219544 X
45° elbow (2 x) for variable terminal kit (VTK), black
0020219551 X X X
1) To reduce the pipe connections that need to be inspected, 4 m extensions are offered on request. (Special delivery with minimum purchasing quantity and with no right of return). The required downward gradient is also 3°. A height of 200 mm is therefore required for the 4 m extension. Take the height into consideration when selecting the installation site.
2) Delivery with pipe clamps
3 Certified air/flue gas systems and components
8 Installation manual 0020200969_04
Optional connection accessories Art. no. 0020223472 303982 0020228140 0020219517
0020219519
0020219518
45° elbow (2 x) for variable terminal kit (VTK), white
0020219552 X
Deflector set, DN 60, PP, black 0020219533 X X X
Deflector set, DN 60, PP, white 0020219534 X
1) To reduce the pipe connections that need to be inspected, 4 m extensions are offered on request. (Special delivery with minimum purchasing quantity and with no right of return). The required downward gradient is also 3°. A height of 200 mm is therefore required for the 4 m extension. Take the height into consideration when selecting the installation site.
2) Delivery with pipe clamps
3.2 System overview, 80/125 mm diameter
Art. no. Air/flue gas systems, concentric
303209 Horizontal roof duct
303200 Vertical roof duct
3.2.1 Components
The following table lists the air/flue gas systems that are permitted as part of the system certification, along with their certified components.
Optional connection accessories Art. no. 303200 303209
Connection piece (screw holes, 4 x) 303926 X X
Connection piece with bayonet connection 0020147469 X X
Extension (PP), concentric, 470 mm, 80/125 mm diameter 303202 X X
Extension (PP), concentric, 970 mm, 80/125 mm diameter 303203 X X
Extension (PP), concentric, 1970 mm, 80/125 mm diameter 303205 X X
45° elbow (2 x), concentric, 80/125 mm diameter 303211 X X
87° elbow, concentric, 80/125 mm diameter 303210 X X
Pipe clamps (5 x), 125 mm diameter 303616 X X
Sliding sleeve, 80/125 mm diameter 303215 X X
Pitched roof tile 009076 (black) X
Universal pitched roof tile 303980 X
Flat roof penetration collar 009056 X
System conditions 4
0020200969_04 Installation manual 9
4 System conditions
4.1 Route of the air/flue pipe in buildings
The air/flue system should be as short as possible and run as straight as possible.
Do not arrange several elbows or inspection elements
immediately after each other.
As a result of standards relating to the hygiene of drinking water, water pipes must be protected against impermissible heating.
Lay the air/flue pipe separately from the drinking water
pipes.
It must be possible to check and, if required, clean the entire length of the flue gas route.
It must be possible to remove the air/flue pipe again with minimal effort (no time-consuming structural or cementing work in the living area, but screwed-in casing instead). If they are arranged in shafts, they are usually easy to remove.
4.2 Location of the opening
The location of the flue gas installation opening must comply with the relevant applicable international, national and/or local regulations.
Align the opening of the flue gas installation in such a
way that ensures a secure outward flow and distribution of the flue gases and prevents these gases from re-en­tering the building through openings (windows, air intake openings and balconies).
4.3 Disposing of condensate
Local regulations may stipulate the minimum quality of any condensate that may enter the public waste-water system. If required, a condensate neutraliser must be used.
When disposing of the condensate into the public waste-
water system, observe the local regulations.
Only use corrosion-resistant piping material for removing
condensate.
4.4 Maximum pipe lengths
4.4.1 Maximum pipe length for horizontal wall
duct
A
A Maximum pipe length
4.4.2 Maximum pipe length of the horizontal wall duct with vertical terminal kit (60/100 mm diameter only)
A
B
A Concentric pipe length B Outdoor pipe length
4.4.3 Maximum pipe length for vertical roof duct
A
A Maximum pipe length
4 System conditions
10 Installation manual 0020200969_04
4.4.4 Maximum pipe lengths, 60/100 mm diameter
4.4.4.1 ecoTEC plus, HOME
Air/flue gas system Art. no. ecoTEC plus 412 (VU 126/6-5 OV ecoTEC plus)
ecoTEC plus 415 (VU 156/6-5 OV ecoTEC plus) ecoTEC plus 418 (VU 186/6-5 OV ecoTEC plus) ecoTEC plus 424 (VU 246/6-5 OV ecoTEC plus) ecoTEC plus 430 (VU 306/6-5 OV ecoTEC plus)
VU 126/6-5 OVZ (H-GB) ecoTEC plus 412 VU 156/6-5 OVZ (H-GB) ecoTEC plus 415 VU 186/6-5 OVZ (H-GB) ecoTEC plus 418 VU 246/6-5 OVZ (H-GB) ecoTEC plus 424 VU 306/6-5 OVZ (H-GB) ecoTEC plus 430 VU 356/6-5 OVZ (H-GB) ecoTEC plus 435
HOME REGULAR 12 -A (H-GB) HOME REGULAR 15 -A (H-GB) HOME REGULAR 18 -A (H-GB) HOME REGULAR 25 -A (H-GB) HOME REGULAR 30 -A (H-GB)
HOME COMBI 25 -A (H-GB) HOME COMBI 30 -A (H-GB)
HOME COMBI 35 -A (H-GB) HOME SYSTEM 12 -A (H-GB) HOME SYSTEM 15 -A (H-GB) HOME SYSTEM 18 -A (H-GB) HOME SYSTEM 25 -A (H-GB)
Max. concentric pipe length
Horizontal wall/roof duct 0020219517
0020219518
0020219519
0020228140
10 m
plus 1 x 87° elbow
The inclusion of additional elbows in the flue gas installation reduces the pipe length as follows:
By 0.5 m for each 45° elbowBy 1.0 m for each 87° elbow
Variable terminal kit 0020219529
0020219530
(with 0020219517 and 0020219518 only)
The maximum concentric pipe length that is specified above is reduced as follows:
By 0.5 m with the variable terminalBy 0.5 m with each metre of VTK pipeBy 0.5 m with each 87° elbowBy 0.5 m for every two 45° elbows
Vertical roof duct 0020223472
303982
10 m
The inclusion of additional elbows in the flue gas installation reduces the pipe length as follows:
By 0.5 m for each 45° elbowBy 1.0 m for each 87° elbow
4.4.4.2 ecoFIT
Air/flue gas system Art. no. VUW 256/6-3 (H-GB) ecoFIT pure 825
VUW 306/6-3 (H-GB) ecoFIT pure 830
VUW 356/6-3 (H-GB) ecoFIT pure 835 VUW 256/6-3 (H-GB) ecoFIT sustain 825 VUW 306/6-3 (H-GB) ecoFIT sustain 830 VUW 356/6-3 (H-GB) ecoFIT sustain 835
VU 126/6-3 (H-GB) ecoFIT pure 612 VU 156/6-3 (H-GB) ecoFIT pure 615 VU 186/6-3 (H-GB) ecoFIT pure 618 VU 256/6-3 (H-GB) ecoFIT pure 625
VU 306/6-3 (H-GB) ecoFIT pure 630 VU 126/6-3 OV (H-GB) ecoFIT pure 412 VU 156/6-3 OV (H-GB) ecoFIT pure 415 VU 186/6-3 OV (H-GB) ecoFIT pure 418 VU 256/6-3 OV (H-GB) ecoFIT pure 425 VU 306/6-3 OV (H-GB) ecoFIT pure 430 VU 356/6-3 OV (H-GB) ecoFIT pure 435
Max. concentric pipe length
Horizontal wall/roof duct 0020219517
0020219518
0020219519
0020228140
10 m
plus 1 x 87° elbow
The inclusion of additional elbows in the flue gas installation reduces the pipe length as follows:
By 0.5 m for each 45° elbowBy 1.0 m for each 87° elbow
System conditions 4
0020200969_04 Installation manual 11
Air/flue gas system Art. no. VUW 256/6-3 (H-GB) ecoFIT pure 825
VUW 306/6-3 (H-GB) ecoFIT pure 830 VUW 356/6-3 (H-GB) ecoFIT pure 835
VUW 256/6-3 (H-GB) ecoFIT sustain 825 VUW 306/6-3 (H-GB) ecoFIT sustain 830 VUW 356/6-3 (H-GB) ecoFIT sustain 835
VU 126/6-3 (H-GB) ecoFIT pure 612 VU 156/6-3 (H-GB) ecoFIT pure 615 VU 186/6-3 (H-GB) ecoFIT pure 618 VU 256/6-3 (H-GB) ecoFIT pure 625
VU 306/6-3 (H-GB) ecoFIT pure 630 VU 126/6-3 OV (H-GB) ecoFIT pure 412 VU 156/6-3 OV (H-GB) ecoFIT pure 415 VU 186/6-3 OV (H-GB) ecoFIT pure 418 VU 256/6-3 OV (H-GB) ecoFIT pure 425 VU 306/6-3 OV (H-GB) ecoFIT pure 430 VU 356/6-3 OV (H-GB) ecoFIT pure 435
Max. concentric pipe length
Variable terminal kit 0020219529
0020219530
(with 0020219517 and 0020219518 only)
The maximum concentric pipe length that is specified above is reduced as follows:
By 0.5 m with the variable terminalBy 0.5 m with each metre of VTK pipeBy 0.5 m with each 87° elbowBy 0.5 m for every two 45° elbows
Vertical roof duct 0020223472
303982
10 m
The inclusion of additional elbows in the flue gas installation reduces the pipe length as follows:
By 0.5 m for each 45° elbowBy 1.0 m for each 87° elbow
4.4.5 Maximum pipe lengths, 80/125 mm diameter
4.4.5.1 ecoTEC plus, HOME
Air/flue gas system Art. no. ecoTEC plus 412 (VU 126/6-5 OV ecoTEC plus)
ecoTEC plus 415 (VU 156/6-5 OV ecoTEC plus) ecoTEC plus 418 (VU 186/6-5 OV ecoTEC plus) ecoTEC plus 424 (VU 246/6-5 OV ecoTEC plus) ecoTEC plus 430 (VU 306/6-5 OV ecoTEC plus)
VU 126/6-5 OVZ (H-GB) ecoTEC plus 412 VU 156/6-5 OVZ (H-GB) ecoTEC plus 415 VU 186/6-5 OVZ (H-GB) ecoTEC plus 418 VU 246/6-5 OVZ (H-GB) ecoTEC plus 424 VU 306/6-5 OVZ (H-GB) ecoTEC plus 430 VU 356/6-5 OVZ (H-GB) ecoTEC plus 435
HOME REGULAR 12 -A (H-GB) HOME REGULAR 15 -A (H-GB) HOME REGULAR 18 -A (H-GB) HOME REGULAR 25 -A (H-GB) HOME REGULAR 30 -A (H-GB)
HOME COMBI 25 -A (H-GB) HOME COMBI 30 -A (H-GB)
HOME COMBI 35 -A (H-GB) HOME SYSTEM 12 -A (H-GB) HOME SYSTEM 15 -A (H-GB) HOME SYSTEM 18 -A (H-GB) HOME SYSTEM 25 -A (H-GB)
Max. concentric pipe length
1)
Horizontal wall/roof duct 303209 25 m
plus 1 x 87° elbow
Vertical roof duct 303200 25 m
1) The inclusion of additional elbows in the flue gas installation reduces the pipe length as follows:
By 1.0 m for each 45° elbowBy 2.5 m for each 87° elbow
4 System conditions
12 Installation manual 0020200969_04
4.4.5.2 ecoFIT
Air/flue gas system Art. no. VUW 256/6-3 (H-GB) ecoFIT pure 825
VUW 306/6-3 (H-GB) ecoFIT pure 830
VUW 356/6-3 (H-GB) ecoFIT pure 835 VUW 256/6-3 (H-GB) ecoFIT sustain 825 VUW 306/6-3 (H-GB) ecoFIT sustain 830 VUW 356/6-3 (H-GB) ecoFIT sustain 835
VU 126/6-3 (H-GB) ecoFIT pure 612 VU 156/6-3 (H-GB) ecoFIT pure 615 VU 186/6-3 (H-GB) ecoFIT pure 618 VU 256/6-3 (H-GB) ecoFIT pure 625
VU 306/6-3 (H-GB) ecoFIT pure 630 VU 126/6-3 OV (H-GB) ecoFIT pure 412 VU 156/6-3 OV (H-GB) ecoFIT pure 415 VU 186/6-3 OV (H-GB) ecoFIT pure 418 VU 256/6-3 OV (H-GB) ecoFIT pure 425 VU 306/6-3 OV (H-GB) ecoFIT pure 430 VU 356/6-3 OV (H-GB) ecoFIT pure 435
Max. concentric pipe length
1)
Horizontal wall/roof duct 303209 25 m
plus 1 x 87° elbow
Vertical roof duct 303200 25 m
1) The inclusion of additional elbows in the flue gas installation reduces the pipe length as follows:
By 1.0 m for each 45° elbowBy 2.5 m for each 87° elbow