USG Topo Ceiling System User Manual

Installation Instructions
Topo™Ceiling System
Page 1 of 12
Before beginning installation of the TOPO™Ceiling System, check the enclosed bill of materials to ensure that all parts are present and undamaged. Read all installation instructions and familiarize yourself with the system’s components. This is extremely important because parts will become permanently damaged if they are installed incorrectly! To help with identification, all parts are poly-bagged and labeled.
Parts and Installation videotape Bill of Materials (BOM) 8Main Tee Components
May include some or all of the following
4Cross Tee (Up) 4Cross Tee (Down) Cross Tee for Utility Circle Cross Tee for Utility Circle
PART LIST
A B C D E F
A
F
B
E
D
C
2Cross Tee
at Low Point at High Point
Utility Circle Main Tee Splice Plate Edge Trim Splice Cover
Corner Cover Panel Hold-Down Clip Infill Panel Infill Panel with
Utility Circle Corner
Infill Panel with Utility Circle Formed in Center
TOPO Ceiling System Installation Instructions
Page 2 of 12
Step 1: Preparation
A.
Begin the installation process by cleaning an area large enough to lay out all components of the T 3-Dimensional System.
OPO
B. C.
Review the parts list and 3-D and 2-D drawings. Take inventory of all components, using the parts list as your master reference.
D. E. F.
The 2-D plan view lists all components and shows where each part will be installed in the assembly.
The 3-D isometric drawing shows locations and elevations for the Main Tees and hanger wires.
G. H. I.
TOPO Ceiling System Installation Instructions
Page 3 of 12
Step 2: Main Tee Installation
A. B. C.
Find a starting point based on a corner location specified on the architect’s plans or by scaling from a working drawing.
D. F.
Mark the hanger wire locations on the Main Tees as they are shown on the drawing plan.
Mark the hanger wire locations… …and lay out the Main Tees as shown
E.
Main Tees are hung from the high points, on 4-foot centers. They are usually spaced 4 feet apart and are hung at the same elevation.
G. H. I.
on the 2-D plan, aligning them with the hanger wire locations.
24"
48"
In cases when a Main Tee is required 2 feet from an adjacent Main Tee, it will be hung at a different elevation. Refer to the 3-D drawing for the proper height.
Establish the location of the highest point of the assembly as specified by the archi­tect. Be sure to have at least 2 inches of clearance above this point to prevent inter­ference with installation of the Edge Trim.
Once the vertical placement is determined, install and bend the hanger wires as indicated on the 3-D drawing. Then, hang the first Main Tee.
Main Tees are connected with Main Tee Splice Clips.
TOPO Ceiling System Installation Instructions
Page 4 of 12
Step 2: Main Tee Installation
J.
To join two Main Tees, insert one tab on the Splice Clip through the slot at the end of one Main Tee.
K.
Then, insert the second tab on the Splice Clip through the slot at the end of the other Main Tee.
M. N. O
Then, bend down the Splice Clip tabs for a tight connection.
When you’re finished hanging the first row, examine the completed row from the side to ensure that the hanger wires are plumb.
L.
Next, butt the Main Tees together snugly.
Wires should hang straight and plumb within 1 in 6, about 10 degrees. If hangers need to be relocated, move them now.
P.
Examine each completed row of Main Tees from one end. It should be straight with no waves.
If you need to install additional hanger wires, install them now.
TOPO Ceiling System Installation Instructions
Page 5 of 12
Step 3: Cross Tee Installation
A.
Before installing the Cross Tees, review the 2-D ceiling plan to determine the location of any Utility Circles that will be installed at Cross Tee intersections.
B. C.
Utility Circles and their intersecting Cross Tees are assembled separately and will be addressed in the next section.
D. E.
Continue installing Cross Tees … … until reaching a location where a
Utility Circle will be placed.
For now, we’ll focus on standard Cross Tees. Begin with a 4-ft. Cross Tee. Insert the end of the Cross Tee into the appropriate slot in each Main Tee.
F.
Then, go back to the first 4-foot Cross Tee and begin installing the perpendicular 2-foot Cross Tee.
G.
Insert the end of the 2-foot Cross Tee into the slot in the middle of each 4-foot Cross Tee.
H.
Double-check the location of any Utility Circles to be installed at intersections.
I.
For now, skip past these sections and install the remaining 4-foot Cross Tees first …
TOPO Ceiling System Installation Instructions
Page 6 of 12
Step 3: Cross Tee Installation
J.
…then the remaining 2-foot Cross Tees.
K.
Tightly wrap the ends of all hanger wires to prevent them from being seen from the side after installation is complete.
TOPO Ceiling System Installation Instructions
Page 7 of 12
Step 4: Utility Circle Installation
A. B. C.
In the previous step, we installed all standard Main Tees and Cross Tees, working around a section where a Utility Circle is specified. This is the open section in the grid assembly shown here.
D. F.
The Utility Circle is ringed with four clips that connect with the modified Cross Tees. These clips operate just like Main Tee splices.
G.
The Utility Circle assembly consists of one 4-inch Utility Circle and four modified Cross Tees, factory-cut a couple of inches shorter than standard Cross Tees.
E.
Insert the tab through the slot at the end of each Modified Cross Tee…
H.
To begin pre-assembly, lay these components out on a table or other flat surface.
…then butt the components together snugly and bend down the tab for a tight connection.
I.
In this installation the Utility Circle has been specified for a location where the intersect­ing Cross Tees curve down to form a valley. Note: Utility Circles can also be specified for intersections that curve up to form a vault. There are slight differences between valley and vault Utility Circles.
With the Utility Circle and intersecting
Cross Tees connected …
…raise the assembly into place and lock the Cross Tees into position just like stan­dard Cross Tees.
TOPO Ceiling System Installation Instructions
Page 8 of 12
Step 5: Edge Trim Installation
A. B. C.
Lay out all Edge Trim segments according to their placement as shown on the 2-D drawing.
Then, guide each Edge Trim segment into place so that the brackets on the back side slide over the bulb of the perimeter tees.
D. E. F.
Edge Trim Splice Covers are used to cover these gaps.
G. I.
Bend down the bottom lip, which will provide a snug fit around the trim.
H.
Do not butt together adjoining lengths of Edge Trim. Instead, leave a 1/8-inch gap between trim pieces.
Install the Trim Splice Covers as you go: slide the lower lip over the bottom edge of the trim…
… and bend the upper portion over the top of the Edge Trim.
At corners, leave a 3/8-inch gap between the leading edge of the trim and the end of the tee.
Each corner gap will be concealed by a Corner Cover.
TOPO Ceiling System Installation Instructions
Page 9 of 12
Step 5: Edge Trim Installation
J. K. L.
Hold the Corner Cover in place and lower each piece of Edge Trim into position so that it catches the bottom lip of the cover.
M. N. O.
G. H. I.
Secure by bending the upper tab over the top of the Edge Trim.
Use the number 6 or number 7 3/8-inch sheet metal screws provided to secure the trim bracket to the tee.
TOPO Ceiling System Installation Instructions
Page 10 of 12
Step 6: Panel Installation
A. B. C.
To prevent dust from accumulating, be sure to install the T all other construction activity has been completed.
OPO panels only after
After unpacking the T prior to installation, spray and wipe each panel with the provided anti-static spray and lint-free towel.
OPO Panels and
D. E. F.
T
OPO panels are designed to slip over
the tee easily yet have sufficient grip to keep the panel edges in place.
In some cases, Panel Hold-Down Clips may also be necessary to create a tight fit between the panels and the grid. By snapping a Panel Hold-Down Clip over the bulb of the tee between two panels, the clip keeps two adjacent panels pressed tightly to the grid.
G. H.
Install panels surrounding Utility Circles first. These panels have a curved notch in one corner.
Panel Hold-Down Clips should be installed after two adjacent panels have been laid in place.
I.
After all T Utility Circles have been installed…
OPO panels surrounding
…install the remaining panels as indicated on the 2-D drawing.
Note: T
OPO Panels all have the same
shape. During installation, each panel can simply be rotated until properly oriented with the vaults and valleys of the T
OPO Grid.
If your installation includes T with preformed Utility Circles, note their locations on the 2-D drawing and install these accordingly.
OPO panels
Technical Service
800 USG.4YOU
Web Site
www.usg.com
Samples/Literature
888 874.2450
Samples/Literature E-mail
samplit@usg.com
Samples/Literature/Fax
888 874.2348
Customer Service
800 950.3839
Note
All products described here may not be available in all geographic markets and are subject to change without notice. Consult your local sales office or representative for information.
Trademarks
The following are trademarks of USG Interiors, Inc. or a related company: T
Notice
We shall not be liable for incidental or consequential damages, directly or indirectly sustained, nor for any loss caused by application of these goods not in accordance with current printed instruction or for other than intended use. Our liability is expressly limited to replacement of defective goods. Any claim shall be deemed waived unless made in writing to us within thirty (30) days from the date it was or reasonably should have been discovered.
OPO, USG.
Safety First!
Follow good safety and indus­trial hygiene practices during handling and installation of all products and systems. Take necessary precautions and wear appropriate personal protective equipment as needed. Read material safety data sheets and related literature on products before specification and/or installation.
Manufactured by USG Interiors, Inc. 125 South Franklin Street Chicago, IL 60606
IC459/rev. 7-03 © 2003, USG Interiors, Inc. Printed in U.S.A.