Description USG Compositions™ are decorative ceiling clouds offered in convenient, ready-to-assemble kits. Compositions allow you
Each Kit Contains: – Suspension system and tee brace components pre cut – Hanger wire, no. 12-gauge galvanized, soft-annealed, mild steel wire, cut to 6' length, in the amount required for the installation – Attachment clips to connect the trim to the suspension system components
NOTE: Pop-rivets, screws and hardware required for attachment to the structure are not included. Compositions kits contain all of the components required to construct and hang a complete cloud except for the screws or pop rivets needed to attach the clips to the grid members and the hardware needed for attachment to the structure. Hanger wire needed for extended distances to the structure is not included.
Ceiling panels are ordered separately.
Many building codes require non-structural building components to be restrained. USG recommends restraint in accordance with all local building code requirements. Please consult with the Authority Having Jurisdiction over the project to determine appropriate restraint requirements for the installation of
Placement of pattern, or possibly delay the activation of the fire sprinkler or fire detection system. USG recommends consulting a fire protection engineer, NFPA 13, and the local code authority for guidance on the proper installation techniques where fire detection or suppression systems are present.
CAUTION: Ceiling panels used in scale load tests were conducted to ensure performance with a variety of infill panels and loading conditions. Use of panels weighing more than this stated limit could result in failure of suspension system components. Solid wood panels are not recommended.
1 Follow good safety/industrial hygiene practices during installation. Wear appropriate personal protective equipment. Read literature before specification and installation.
Compässo™ Elite Extruded Perimeter Trim, factory curved and cut to form a cloud to the required size and shape
Compässo Elite extruded perimeter trim splice plates
Compositions. Restraints are not included in the kit.
Compositions may obstruct or distort the existing or planned fire sprinkler water distribution
Compositions shall not exceed 4lbs. (1.81kg.). Thorough component and full
2 Determine the location of the hanger wires: For any type of cloud system this depends on the size and
3 Determine finished ceiling height.
4 Install the main tees on the hanger wires. Level, but do not tie the hanger wires. The added weight of the
cross tees and trim will change the hanger wire position slightly so it is good practice to tie the hanger wire after all the trim and grid is installed.
configuration. In order to ensure proper hanger wire location refer to or included isometric with hanger points noted.
1 Compositions™ Decorative Clouds
Compositions Systems Guide IS267,
Compositions Decorative Clouds
Installation
5 Install all cross tees except perimeter cross tees.
6 Install the perimeter tees followed by the tee brace. Be sure the system is level while installing the tee braces.
NOTE: It is important to install the cross tees first and then install the tee brace by fitting it onto the web
of the tee and then positioning it on the top surface of the tee. Fasten the tee brace with 1/8" pop rivets or 7/16" pan head screws through the four holes provided. Some systems require an additional tee brace on the tee intersection located at the center of the ceiling system.
2 Compositions™ Decorative Clouds
Compositions
Decorative Clouds
Installation
7 Install the attachment clips onto the Compässo™ Trim.
NOTE: USG recommends leaving the installed trim attachment clips unlocked in the trim channels until
the system is ready to receive the ceiling tiles. This allows the installer to position the tees as needed during installation.
8 Prior to installing the perimeter trim snip off the cross tee clips by cutting them through the middle of the hour-glassed shaped hole.
cut line
3 Compositions™ Decorative Clouds
Compositions
Decorative Clouds
Installation
9 Install the trim onto the suspension system by starting with an end cap.
10 For cross tees, once the proper location of the attachment clips has been determined, fasten the
clip with two pop rivets installed through the cross tee clip holes.
4 Compositions™ Decorative Clouds
Compositions
Decorative Clouds
Installation
11 For main tees, adjust the attachment clips to the proper location by aligning them against the override feature and temporarily clamping it. Use a hole punch to create rivet holes through the tee aligned with the two top holes through the attachment clip.
12 Once the holes are punched, fasten the attachment clip to the tee with two pop rivets.
5 Compositions™ Decorative Clouds
Compositions
Decorative Clouds
Installation
13 Prior to installing the straight trim pieces be sure to first slide the splice plates in the integral trim channels flush with the edge of the trim so they do not extend beyond the end of the trim.
14 Install the straight sides next and position in place. Extend the splice plates to connect the trim pieces with the splice plates installed slightly offset of the center of the connection.
6 Compositions™ Decorative Clouds
Compositions
Decorative Clouds
Installation
15 Install the remaining end caps and check the system for squareness. At this point the attachment clips may be locked into place. The attachment clips are locked by inserting a flat-blade or straight screwdriver into the vertical slot in the clip and twisting clockwise keying the clip into the trim. Be sure all hanger wires are securely wrapped.
16 Install ceiling panels after checking for system squareness.
Physical Data/ Footnotes
Product Information
See usg.com for the most up-to-date product information.
Installation
Must be installed in compliance with ASTM C636, ASTM E580, CISCA and standard industry practices, within all applicable code requirements. Alternative assemblies and installation methods may be utilized when approved by the Authority Having Jurisdiction. USG recommends checking with the Authority Having Jurisdiction prior to designing and installing a suspended ceiling system.
Manufactured by USG Interiors, LLC 550 West Adams Street Chicago, IL 60661
Code compliance
The information presented is correct to the best of our knowledge at the date of issuance. Because codes continue to evolve, check with a local official prior to designing and installing a ceiling system. Other restrictions and exemptions may apply. This is only intended as a quick installation reference.
Restraint / Seismic Bracing
If restraint or seismic bracing is required please refer to Seismic Technical Guide - Specialty Decorative Ceilings, SC2494, for more information and examples of seismically tested bracing methods. Prior to installation
The following are trademarks of USG interiors, LLC or a related company:
UsG, UsG in stylized letters.
Compässo, Compositio ns, DX, DXL, Donn,
please consult with a licensed architect or engineer in the particular locale of the installation to assure compliance with all legal requirements.
ICC Evaluation Service, Inc., Report Compliance
Suspension systems manufactured by USG Interiors, LLC, have been reviewed and are approved by listing in ICC-Evaluation Service Report ESR-1222. Evaluation Reports are subject to reexamination, revision and possible cancellation. Please refer to usgdesignstudio.com or usg.com for current reports.
L.A. Research Report Compliance
Donn® brand suspension systems manufactured by USG Interiors, LLC, have been reviewed and are approved by listing in the following L.A. Research Report number: 25764.
Notice
We shall not be liable for incidental and consequential damages, directly or indirectly sustained, nor for any loss caused by application of these goods not in accordance with current printed instructions or for other than the intended use. Our liability is expressly limited to replacement of defective goods. Any claim shall be deemed waived unless made in writing to us within thirty (30) days from date it was or reasonably should have been discovered.
usg.com seismicceilings.com sustainableceilings.com usgdesignstudio.com
Safety First!
Follow good safety/industrial hygiene practices during installation. Wear appropriate personal protective equipment. Read MSDS and literature before specification and installation.
IS266/12-12 © 2012 USG Interiors, LLC Printed in U.S.A.
Loading...