8
3 Installation
3. 1 Unpacking Inspection
1. Open the packing box of UPS and take it out, visually examine the unit for
transit damage.
2. Check against the accessory lists that the accessories of the UPS are present.
(Refer to Table 9-1).
3. Make sure the model is what you wanted from the nameplate on the rear
panel
4. If the UPS arrives damaged, or there is any missing accessory or other
question above, please contact the distributor immediately.
3. 2 Installation Notes
1. When locating the UPS, make sure there is no hazardous objects such as
water, inflammable gas, corrosive agents and so on around the UPS, and that
the installation environment meets the specifications.
2. The UPS should not be placed on a side. The air inlet port at the front panel
and the outlet port on the rear panel and two side panels should not be
blocked so as to ensure good ventilation.
3. In case if the UPS is unpacked, installed and used at very low temperatures,
condensations of water drops may appear. It is necessary to wait until the
UPS fully dried inside out before proceeding to installation and use.
Otherwise, they may be a risk of electric shock.
4. Place the UPS near the utility power source outlet which supplies power to
the UPS. In any emergency, switch off the main input socket, cut off the
battery voltage input. All power sockets must be connected with ground
protection.