Unicont SPb CH-105 Technical Documentation Manual

Unicont SPb Ltd
Automatic Battery Charger
CH-105
Technical Documentation
St. Petersburg
2011
Unicont SPb Ltd Technical Documentation CH-105
Page 2
Table of Contents
1. PURPOSE ..........................................................................................................................3
2. DELIVERY SET ...............................................................................................................3
3. TECHNICAL CHARACTERISTICS ............................................................................3
4. PRINCIPLE OF OPERATION OF BATTERY CHARGER ......................................4
5. INSTALLATION AND CONNECTION OF BATTERY CHARGER .......................5
6. ABC PROTECTION ......................................................................................................11
7. CONNECTION OF EXTERNAL ALARM UNIT ...............................................................12
8. ABC ALARMS AND SIGNALLING ...........................................................................12
9. CONTROLS AND INDICATION ................................................................................13
10. MENU STRUCTURE AND ADJUSTMENT OF ABC ..............................................14
11. ABC FUNCTION OF BATTERY PROTECTION FROM DEEP DISCHARGE ...15
12. RECOMMENDATIONS ON SETTING OF CHARGING CURRENT ...................16
13. RECOMMENDATIONS ON SETTING OF CHARGING VOLTAGE ...................16
14. TRANSPORTATION AND STORAGE ......................................................................17
15. WARRANTY ..................................................................................................................18
16. DATE OF PACKING .....................................................................................................19
17. ACCEPTANCE DETAILS ............................................................................................19
18. DATE OF COMMISSIONING .....................................................................................19
Unicont SPb Ltd Technical Documentation CH-105
Page 3
The present Operating Manual (OM) is applicable to automatic battery charger of CH-
105 model (hereinafter referred to as ABC).
The Operating Manual is to be used for study of design, principles of operation and operating rules of ABC while operating it as per its intended use and during maintenance. The Operating Manual can also be used for obtaining information on battery chargers for developing the appropriate sections of operating documentation for the equipment in which ABC can be used as a component.
1. Purpose
The automatic battery charger CH-105 is to be used on marine and river vessels in dry service spaces of bridge, superstructures or lower decks and it charges accumulator batteries of various ship equipment (electronic cartography devices, automatic system, radio communication devices, etc.), as well as other industrial, transport equipment and communication system equipment.
2. Delivery Set
1. Battery charger CH-105 1 piece
2. Operation manual 1 piece
3. Technical characteristics
Table 1 List of modifications of ABC CH-105.
Parameter
CH-105
CH-105-24
CH-105-2412A
CH-105­110VDC
CH-105­220VDC
Input voltage:
110/220 V AC,
50/60 Hz
24 V DC (19 to 72 V)
110 V DC(
72114)
220VDC (190-
300)
Maximum output power:
600 W
500 W
350 W
350 W
500 W
Charging voltage:
9 to 30 V DC
(for charging the batteries with operating voltage 12 V or 24 V)
Charging current:
1–20 А
1–16 А
1–12 A
1–16 A
1–14 A
Type of battery charger:
Automatic
Standard capacity of charged batteries:
40–200 A×h
40–160 A×h
40–120 A×h
40–160 A×h
400–140 A×h
AB charging time at
10 hours max. up to 80 %
Unicont SPb Ltd Technical Documentation CH-105
Page 4
maximum output:
Controls:
Keypad (4 keys).
Power on/off switch
Indicators:
Digital light-emitting diode indicators (for display of present current value and
charging voltage) – 2 pcs
Light-emitting diodes displaying operation mode of ABC (charging, normal, failure) –
3 pcs.
Accuracy of measured values
current – 0.2 А voltage – 0.1 V
Number of digits in displayed values
current 0.1 A (format ХХ.Х)
voltage 0.1 V (format ХХ.Х)
Signalling
loss of ship network supply voltage start of AB with reverse polarity start of ABC with disconnected AB (breakage of AB circuit) excessive voltage in power supply circuit overload or short-circuit in AB circuit charging current or voltage exceed the preset limits
Types of alarm signals
Built-in: relay contacts, sound signal, red light-emitting diode
External (connected): Alarm unit AU-106
In-built protection:
excessive voltage of supply network. connection of power supply with reverse polarity stability to power supply loss excessive current in AB circuit (overload / short-circuit) connection of AB with reverse polarity protection of battery from deep discharge (connected function) protection of battery from overheating (with use of thermal sensor)
Protection class
IP 22
Operating temperature range:
-20..+55 °С
Overall dimensions:
345 × 265 × 140 mm
Weight:
7 kg, max.
4. Principle of operation of battery charger
Battery charger CH-105 allows to charge automatically the accumulator batteries connected to it (maximum charging current and voltage are set by the user). The battery is charged by combined method (operation in current stabilization mode in the phase of main charge with switching to voltage stabilization mode in terminal phase). The example of charging current and voltage curves of ABC is given on the graphs below (refer to Figure 1):
Unicont SPb Ltd Technical Documentation CH-105
Page 5
I
t
Main charging
phase
Terminal charging phase
U
t
Charging
voltage
AB low
voltage level
Main charging
phase
Terminal charging phase
Figure 1 ABC charging current and voltage curves
5. Installation and connection of battery charger
5.1 Installation
ABC is installed in the following sequence:
1. Select and prepare the place for installation of the device so as to ensure free access,
input of cables and termination of their ends. Vertical bulkhead inside the vessel is a convenient place for installation.
CAUTION! When selecting the place for installation of the device ensure safe distance to the port-hole so that the water splashes do not penetrate the device when the port-hole is opened.
ABC shall be installed at a distance at least 1 m away from magnetic compass.
Unicont SPb Ltd Technical Documentation CH-105
Page 6
When ABC is installed in the panel or utility room, take into account the requirements of Para 7.
2. Properly secure the case of battery charger on the vertical bulkhead with the help of bolts or self-tapping screws. By the effort of hand check for reliability of its fastening. The information on installation and overall dimensions of ABC are specified in installation diagram of this OM (refer to
Figure 2);
3. Bring the cables of connected devices to ABC. Use the cable of КМПВ (Э) brand or its substitutes with the appropriate cross-section of cores. When selecting the cable use information on diameters of cable leads (Table 2) and maximum dimensions of cross-sections of ABC terminals (Table
3).
CAUTION! Before laying and connecting the cables to ABC decide if there is a
requirement to use ABC function on protection of AB from deep discharge and select the appropriate method of load connection to accumulator battery (refer to Para 5.2.4).
Figure 2 Overall dimensions and installation diagram of ABC
grounding
Gland MG16
Gland MG25
Gland MG32
Gland MG20
M5