Ulma MK Structure User Manual

Page 1
Construcción
User’s Guide
MK STRUCTURE
MK STRUCTUREMK STRUCTURE
MK STRUCTURE
E03FFN
Page 2
Construcción
ConstrucciónConstrucción
Construcción
IMPORTANT
:
Any safety provisions as directed by the appropriate governing agencies must be observed when using our products.
The pictures in this document are snapshots of situations at different stages of assembly, and therefore are not complete images. For the purpose of safety, they should not be deemed as definitive.
All of the indications regarding safety and operations contained in this documents, and the data on stress and loads should be respected. ULMA Construcción’s Technical Department must be consulted anytime that field changes alter our equipment installation drawings.
The loads featured in this document, related to the basic elements of the product, are approximate.
Our equipment is designed to work with accessories and items produced by our company only. Combining such equipment with other brands is not only dangerous without having made all corresponding verifications, it also voids any or all our warranties.
The company reserves the right to introduce any modifications deemed necessary for the technical
development of the
product.
““““
Original document”
Original document” Original document”
Original document”
produced and
produced andproduced and
produced and
approved by ULMA Construcción.
approved by ULMA Construcción.approved by ULMA Construcción.
approved by ULMA Construcción.
All rights reserved.
Neither all nor part of this document may be reproduced or transmitted in any way by any electronic or mechanical procedure, including photocopy, magnetic recording or any other form of information storage or retrieval system without the permission of ULMA
ULMA ULMA
ULMA
Construcción.
Construcción.Construcción.
Construcción.
© Copyright by ULMA C y E, S. Coop
Information note
Information noteInformation note
Information note
Safety
Safety Safety
Safety
note
notenote
note
Warning note
Warning noteWarning note
Warning note
Control note
Control noteControl note
Control note
Page 3
Construcción
ConstrucciónConstrucción
Construcción
3
INDEX
INDEXINDEX
INDEX
1. PRODUCT DESCRIPTI
1. PRODUCT DESCRIPTI1. PRODUCT DESCRIPTI
1. PRODUCT DESCRIPTION
ONON
ON ................................
................................................................
.....................................
..........
..... 4444
1.1. MK TRUSS ....................................................... 5
1.2. MK FORM CARRIERS ........................................ 7
2. SYSTEM COMPONENTS
2. SYSTEM COMPONENTS2. SYSTEM COMPONENTS
2. SYSTEM COMPONENTS AND ACCESSORIES
AND ACCESSORIESAND ACCESSORIES
AND ACCESSORIES ......
............
...... 13
1313
13
2.1. GRAPHIC DESCRIPTION ................................... 13
2.2. ITEMS DESCRIPTION ....................................... 17
3. ASSEMBLY, USE AND
3. ASSEMBLY, USE AND3. ASSEMBLY, USE AND
3. ASSEMBLY, USE AND DISMANTLING
DISMANTLINGDISMANTLING
DISMANTLING .................
..................................
................. 25
2525
25
3.1. TECHNICHAL ASSEMBLY INSTRUCTIONS.
GENERAL ASSEMBLY .............................................. 25
4. SOLUTIONS
4. SOLUTIONS4. SOLUTIONS
4. SOLUTIONS ................................
................................................................
......................................................
............................................
...................... 29
2929
29
4.1. STRUCTURE TYPES .......................................... 32
4.2. STRUCTURE LAYOUTS ..................................... 34
4.3. BRACING BETWEEN STRUCTURES .................... 38
4.4. STRUCTURE CONNECTION WITH SHORING
SYSTEM .................................................................. 39
4.5. STRUCTURE LEVELLING .................................... 40
4.6. FORWARD-MOVING OF STRUCTURES: ROLLING
SYSTEM .................................................................. 41
4.7. SAFETY AND ACCESS PLATFORMS ................... 42
5. SYSTEM PROPERTIES
5. SYSTEM PROPERTIES5. SYSTEM PROPERTIES
5. SYSTEM PROPERTIES ................................
................................................................
.......................................
..............
....... 43
4343
43
5.1. MAIN ITEM PROPERTIES ................................... 43
5.2. LIMITS FOR STANDARD STRUCTURES ................ 50
6. TERMS AND CONDITI
6. TERMS AND CONDITI6. TERMS AND CONDITI
6. TERMS AND CONDITIONS OF USE
ONS OF USEONS OF USE
ONS OF USE ....................
........................................
.................... 55
5555
55
6.1. SAFE OPERATING GUIDELINES .......................... 55
6.2. TRANSPORT, HANDLING AND STORAGE ........... 58
6.3. INSPECTION AND MAINTENANCE ..................... 59
7. LEGAL REFERENCES
7. LEGAL REFERENCES7. LEGAL REFERENCES
7. LEGAL REFERENCES ................................
................................................................
.........................................
..................
......... 61
6161
61
Page 4
Construcción
ConstrucciónConstrucción
Construcción
4
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
1.
1.1.
1. PRODUCT DESCRIPTION
PRODUCT DESCRIPTIONPRODUCT DESCRIPTION
PRODUCT DESCRIPTION
The MK System is a product designed for heavy-duty structures of high load-bearing capacity mainly used in civil engineering.
Its main feature is its versatility to configure all types of structures such as gantry structures, formwork carriers and tunnel structures, shoring structures, horizontal and vertical formwork, other structures for formwork support, climbing brackets, slab perimeter protection structures and other applications.
The core item for all these solutions is the Waler MK. Its elaborated design and the combination with various accessories, both unique of the MK system as well as shared with other ULMA products, enable to adapt it to all those above mentioned applications.
With the MK Structure system, two or more load-bearing structures are formed in one direction, the so-called main axis. These structures are braced to each other giving the required stability to the whole as well as absorbing wind loads acting on the structure in perpendicular direction to the main axis.
Depending on their field of application, mainly two structure types are distinguished:
MK Truss Structure
MK Truss StructureMK Truss Structure
MK Truss Structure
MK Form Carrier Structure
MK Form Carrier StructureMK Form Carrier Structure
MK Form Carrier Structure
In the following, the two structure types are described in detail.
Page 5
Construcción
ConstrucciónConstrucción
Construcción
5
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
1.1. MK TRUSS
MK TRUSSMK TRUSS
MK TRUSS
A truss structure, bi- or multi-supported, supports the formwork and absorbs the loads acting on the formwork. The formwork systems commonly used with the MK Truss Structure are Enkoform VMK or Enkoform H-120.
The typical truss form of the structure is achieved with equilateral triangles consisting of Walers MK and Nodes MK assembled in the same plane. These structures are braced to each other with joints and tubes. Depending on the required load-bearing capacity of the truss, the main axis can be reinforced with push-pull props and tubes.
The Waler MK range allows assembling trusses of different load-bearing capacities. The most optimum load­bearing capacity-weight ratio is the one given by a distance of 3 m between nodes axes and 2.6 m between waler axes.
Page 6
Construcción
ConstrucciónConstrucción
Construcción
6
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
If the span of the upper boom (or element that works at compression) is sought to be reduced or the bending capacity to be increased, a vertical tube is used to make the structure bear higher loads.
The spans possible to cover with the MK Truss Structure change depending on the waler length used. Moreover, the permissible working load changes depending on the layout of the truss structure.
The combination of the MK Truss Structure system with the MK Shoring system offers an even wider range of solutions as shown in the following figures.
Solution combining the MK Truss Structure and MK Shoring system
Solution combining the MK Truss Structure and MK Shoring systemSolution combining the MK Truss Structure and MK Shoring system
Solution combining the MK Truss Structure and MK Shoring system
Solution combining the MK Truss and MK Form Carrier Structure
Solution combining the MK Truss and MK Form Carrier Structure Solution combining the MK Truss and MK Form Carrier Structure
Solution combining the MK Truss and MK Form Carrier Structure
MK - 2625 MK - 2625MK - 2625 MK - 2625
MK - 2625
M
K
­2
6 2 5
MK - 2625
M K
­2 6 2
5
M K
­2 6 2
5
M K
­2 6 2
5
M
K
-
2
6
2
5
M
K
-
2
6
2
5
M
K
-
2
6
2
5
M
K
-
2
6
2
5
MK -4625
MK -4625
MK - 2625
MK - 2625
MK - 1125
MK - 1125
MK - 2625
MK - 1125
MK - 1125
MK - 2625
MK - 2625
M K
­2 6 2
5
M
K
-
2
6
2
5
MK - 2625
MK - 2625
M K
­2 6 2
5
M
K
-
2
6
2
5
MK - 2625
MK -4625
MK -4625
MK - 2625
MK - 2625
MK - 1125
MK - 1125
MK - 2625
MK - 1125
MK - 1125
MK - 1250
MK - 1250
MK - 1250
MK - 1250
MK - 1250
MK - 1250
MK - 1250
MK - 1250
MK - 1250
MK - 1250
MK - 1250
MK - 1250
MK - 2625
M K
­2 6
2 5
M
K
-
2
6
2
5
MK - 2625
M K
­2 6 2
5
M
K
-
2
6
2
5
MK - 2625
MK - 2625
M K
­2 6 2
5
M
K
-
2
6
2
5
MK -4625
MK -4625
MK - 1125
MK - 1125
MK - 1125
MK - 1125
MK -5625
MK -5625
MK -5625
MK - 2625
Page 7
Construcción
ConstrucciónConstrucción
Construcción
7
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
1.2. MK FORM CARRIERS
MK FORM CARRIERSMK FORM CARRIERS
MK FORM CARRIERS
The following types of form carriers can be erected with the MK system:
Deck flange form carrier
Parapet form carrier
Vertical formwork carrier
Cut-and-cover tunnel form carrier
1.2.1. DECK FLANGE FORM CARRIER
DECK FLANGE FORM CARRIERDECK FLANGE FORM CARRIER
DECK FLANGE FORM CARRIER
In the case of metallic bridges which are made up of pre-cast components or of a pre-cast centre part, it is common to build the wings in a subsequent stage. This can be done with deck flange form carriers. These are heavy-duty form carriers as the jacks are able to withstand a maximum load of approximately 360 kN. Due to the load borne by the structure, the forward-moving of the form carrier is achieved by means of pull or push auxiliary devices.
A deck flange form carrier with these properties usually consists of the following parts:
o Main structure: structure bearing the concrete load. o Forward-moving structure: secondary structure which effects the movement and bears the forces
during such.
o Bracing: components that withstand wind effects and transverse movements. o Formwork: part in touch with the concrete shaping it, allowing its adjustment and opening if this is
required for the movement of the structure.
o Rolling and levelling system: components that enable the rolling of the truss and its levelling at a
specific place, as well as its stripping.
o Safety items and access: walkway platforms, handrails etc., depending on the requirements of each
project.
Page 8
Construcción
ConstrucciónConstrucción
Construcción
8
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
There are two types of deck flange form carriers:
Those where the rolling system is part of the form carrier (i.e. integrated in the secondary structure) or
Those where the rolling system is not part of the form carrier.
A further distinction may be the requirement to cast both wings at the same time or one after the other.
In the first case, the rolling system rests on a guide rail to move the formwork to subsequent casting positions. It can be applied in those cases where there is a solid base (pre-fabricated or pre-cast) to support the guide rail and the levelling jacks on.
Deck flange form carrier for a bridge with a pre
Deck flange form carrier for a bridge with a preDeck flange form carrier for a bridge with a pre
Deck flange form carrier for a bridge with a pre----cast core
cast corecast core
cast core
In the second case, it is the other way around. The bogie forms part of the secondary structure and the rolling system is fixed to the bridge. This is rather common where there is no pre-cast structure (e.g. metallic bridges).
Deck flange form carrier for a metallic bridge
Deck flange form carrier for a metallic bridgeDeck flange form carrier for a metallic bridge
Deck flange form carrier for a metallic bridge
TF - 0121
TF - 0121
TF - 0121
Page 9
Construcción
ConstrucciónConstrucción
Construcción
9
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
1.2.2. PARAPET FORM CARRIER
PARAPET FORM CARRIERPARAPET FORM CARRIER
PARAPET FORM CARRIER
This form carrier is a lighter version of the previous one. It is used for applications with lower load-bearing and forward-moving capacities. Unlike the one mentioned beforehand, the parapet form carrier can be moved manually and requires a solid base where the guide rail rests on. The jacks of this form carrier type are able to withstand a maximum load of approximately 150 kN.
The most common applications for parapet form carriers are the construction of protection parapets for bridges or solutions that do not require high load-bearing capacity, mainly projects with formwork tables.
Form carrier for bridge parapets
Form carrier for bridge parapetsForm carrier for bridge parapets
Form carrier for bridge parapets
A parapet form carrier usually consists of the following parts:
o Main structure: structure bearing the concrete load. o Bracing: components that withstand wind effects and transverse movements. o Formwork: part in touch with the concrete shaping it, allowing its adjustment and opening if this is
required for the movement of the structure.
o Rolling and levelling system: components that enable the rolling of the truss and its levelling at a
specific place, as well as its stripping.
o Safety items and access: walkway platforms, handrails etc., depending on the requirements of each
project.
Page 10
Construcción
ConstrucciónConstrucción
Construcción
10
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
1.2.3. VERTICAL FORMWORK CARRIER
VERTICAL FORMWORK CARRIERVERTICAL FORMWORK CARRIER
VERTICAL FORMWORK CARRIER
The main feature that distinguishes the vertical formwork carrier from others is that the vertical loads acting on the structure are exclusively caused by the self-weight of the structure. Its load-bearing and forward-moving capacities are still lower than the ones of the above mentioned form carriers. The jacks of this form carrier type are able to withstand a maximum load of approximately 60 kN.
As the parapet form carrier, the vertical formwork carrier can be moved manually and requires a solid base where the guide rail rests on. It is mainly used in the construction of single-sided or double-sided concrete walls. In the case of single-sided walls, there are considerable horizontal loads which must be taken into account when using the vertical formwork carrier.
Vertical formwork carrier for double
Vertical formwork carrier for doubleVertical formwork carrier for double
Vertical formwork carrier for double----sided walls
sided wallssided walls
sided walls
Vertical formwork carrier for single
Vertical formwork carrier for singleVertical formwork carrier for single
Vertical formwork carrier for single----sided walls
sided wallssided walls
sided walls
Page 11
Construcción
ConstrucciónConstrucción
Construcción
11
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
1.2.4. CUT
CUTCUT
CUT----AND
ANDAND
AND----COVER TUNNEL FORM CARRIER
COVER TUNNEL FORM CARRIERCOVER TUNNEL FORM CARRIER
COVER TUNNEL FORM CARRIER
The solution with the MK system for cut-and-cover tunnels can be regarded another type of form carrier adapted to the particular requirements of tunnel construction where the structure must adapt to the vault shape of the tunnel. This form carrier type also applies to applications where walls and slabs are cast at once as it is the case of rectangular section tunnels.
Vaulted tunnels are usually not cast at once but in stages: first the gables then the top part of the vault. Cut-and­cover tunnel form carriers are complemented with swivel parts to facilitate the stripping and forward-moving of the structure.
An all-round solution for cut-and-cover tunnels combines the MK Structure system for the top part of the vault with the MK Shoring system. A cut-and-cover tunnel form carrier usually consists of the following parts:
o Main structure: structure bearing the concrete load, both the vertical as well as the horizontal loads. o Forward-moving structure: secondary structure which effects the movement and bears the forces
during such.
o Bracing: components that withstand wind effects and transverse movements. o Formwork: part in touch with the concrete shaping it, allowing its adjustment and opening if this is
required for the movement of the structure.
o Rolling and levelling system: components that enable the rolling of the truss and its levelling at a
specific place, as well as its stripping.
o Safety items and access: walkway platforms, handrails etc., depending on the requirements of each
project.
Page 12
Construcción
ConstrucciónConstrucción
Construcción
12
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
Cut-and-cover tunnel from carriers vary depending on aspects such as the load-bearing capacity and the area where it is supported on and moved forward. Two types of cut-and-cover tunnel form carriers are distinguished regarding a restricted or free support area. In all cases, the rolling system forms part of the form carrier, i.e. it is integrated in the bogie.
Cut
CutCut
Cut----and
andand
and----cover tunnel form carrier with free support area
cover tunnel form carrier with free support areacover tunnel form carrier with free support area
cover tunnel form carrier with free support area
Cut
CutCut
Cut----and
andand
and----cover tunnel form carrier with restricted su
cover tunnel form carrier with restricted sucover tunnel form carrier with restricted su
cover tunnel form carrier with restricted support area
pport areapport area
pport area
Form carrier for slab and wall in rectangular section tunnel
Form carrier for slab and wall in rectangular section tunnelForm carrier for slab and wall in rectangular section tunnel
Form carrier for slab and wall in rectangular section tunnel
C onstrucción
Constr
ucc
ión
C onstru
cci
ón
Page 13
Construcción
ConstrucciónConstrucción
Construcción
13
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
2.
2.2.
2. SYSTEM COMPONENTS AND ACCESSORIES
SYSTEM COMPONENTS AND ACCESSORIESSYSTEM COMPONENTS AND ACCESSORIES
SYSTEM COMPONENTS AND ACCESSORIES
2.1.
2.1.2.1.
2.1. GRAPHIC DESCRIPTION
GRAPHIC DESCRIPTIONGRAPHIC DESCRIPTION
GRAPHIC DESCRIPTION
Item no.
Item no.Item no.
Item no.
Weight
Weight Weight
Weight
(kg)
(kg)(kg)
(kg)
Item name
Item nameItem name
Item name
WALERS AND
WALERS AND WALERS AND
WALERS AND PROFILES MK
PROFILES MKPROFILES MK
PROFILES MK----120
120120
120
1990104
1990105 1990106 1990107 1990163
6
7.5
9.1
10.7
97.6
PROFILE MK
-
120 / 0.5
PROFILE MK-120 / 0.625 PROFILE MK-120 / 0.75 PROFILE MK-120 / 0.875 PROFILE MK-120 / 7.875
1990209
1990211 1990213 1990215 1990217 1990219 1990221 1990225 1990229 1990233 1990237 1990239 1990245
29.4
35.4
41.9
48.3
54.3
60.5
68.6
80.9
93.4
107.6
120.1
126.3
146.7
WALER MK
-
120 / 1.125
WALER MK-120 / 1.375 WALER MK-120 / 1.625 WALER MK-120 / 1.875 WALER MK-120 / 2.125 WALER MK-120 / 2.375 WALER MK-120 / 2.625 WALER MK-120 / 3.125 WALER MK-120 / 3.625 WALER MK-120 / 4.125 WALER MK-120 / 4.625 WALER MK-120 / 4.875 WALER MK-120 / 5.625
1990200
0.46
SPACER TUBE MK
-
120 / 52
0241690
0.17
BOLT M16x90 DIN
-
931-8.8
0241600
0.03
NUT M16 DIN
-
934-8
Item no.
Item no.Item no.
Item no.
Weight
Weight Weight
Weight
(kg)
(kg)(kg)
(kg)
Item name
Item nameItem name
Item name
NODES AND TRUSS ITEMS
NODES AND TRUSS ITEMS NODES AND TRUSS ITEMS
NODES AND TRUSS ITEMS
1990485
30.8 NODE 180 MK
1990480
31.8 NODE 180 D40 MK
1990420
24.0 NODE 120 MK
1990390
18.8 NODE 90 MK
1990360
16.0
NODE 60 F MK
Page 14
Construcción
ConstrucciónConstrucción
Construcción
14
MK
MK MK
MK
STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
Item no.
Item no.Item no.
Item no.
Weight
Weight Weight
Weight
(kg)
(kg)(kg)
(kg)
Item name
Item nameItem name
Item name
1990361
21.4 NODE 60 M MK
1990300
1990301
15.0
23.0
AXIAL NODE M D40
MK
AXIAL NODE 90º M D40 MK
1990665
50.5 NODE 360 MK
1990365
40.2 NODE 60 SUPPORT MK
1990395
1991200
6.5
9.1
ORTHOGONAL
JOINT MK
ORTHOGONAL JOINT MK-180
1990590
1991458
1.5
5.2
AXIAL NODE M D20 MK
AXIAL NODE M 2-D20 MK
Item no.
Item no.Item no.
Item no.
Weight
Weight Weight
Weight
(kg)
(kg)(kg)
(kg)
Item name
Item nameItem name
Item name
1990404
19.5 V BRACING TRUSS MK
1990403
1.3 JOINT PUSH
-
PULL PROP E
-
NODE MK
0242010
0242015
0.30
0.50
BOLT M20x100 DIN
-
931-8.8
BOLT M20x150 DIN-931-8.8
0242000
0.06 NUT M20 DIN
-
934-8
1980120
1.1 PIN D40x85
9023102
0.04
SAFETY
PIN D 7x50
PUSH
PUSHPUSH
PUSH----PULL PROPS E
PULL PROPS EPULL PROPS E
PULL PROPS E
1960210
1960100 1960110 1960115 1960130 1960125 1960410
10.6
14.1
18.8
24.1
33.4
38.1
45.0
PUSH-PULL PROP E 0.51
-
075
PUSH-PULL PROP E 0.75-1.05 PUSH-PULL PROP E 1-1.55 PUSH-PULL PROP E 1.51-2.2 PUSH-PULL PROP E 2.15-2.75 PUSH-PULL PROP E 2.7-3.3 PUSH-PULL PROP E 3.25-4
Page 15
Construcción
ConstrucciónConstrucción
Construcción
15
MK
MK MK
MK
STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
Item no.
Item no.Item no.
Item no.
Weight
Weight Weight
Weight
(kg)
(kg)(kg)
(kg)
Item name
Item nameItem name
Item name
0252070
0.28 PIN E20x70
0250000
0.03 COTTER PIN R/5
JOINTS AND BRACING ITEMS
JOINTS AND BRACING ITEMSJOINTS AND BRACING ITEMS
JOINTS AND BRACING ITEMS
1990521
3.8 U SECONDARY AXIS MK
1990421
2.7 U SECONDARY AXIS END MK
1990605
1990608 1990613 1990618 1990623
1.9
2.7
4.5
6.2
7.9
HORIZ. TUBE MK 0.75/ 550
HORIZ. TUBE MK 1/ 800 HORIZ. TUBE MK 1.5/ 1300 HORIZ. TUBE MK 2/ 1800 HORIZ. TUBE MK 2,5/ 2800
1990614
1990628
1990611 1990612 1990615 1990620
1990619 1990622 1990626 1990630
1990625 1990629 1990633
7.7
19.4
6.1
7.2
8.3
10.5
10.1
12.2
17.9
20.9
17.2
19.7
22.5
DIAGONAL MK 0.75x1.5 / 1396
DIAGONAL MK 0.75x3 / 2845
DIAGONAL MK 1x1 / 1110 DIAGONAL MK 1x1.25 / 1300 DIAGONAL MK 1x1.5 / 1508 DIAGONAL MK 1x2 / 1954
DIAGONAL MK 1.5x1.5 / 1818 DIAGONAL MK 1.5x2 / 2201 DIAGONAL MK 1.5x2.5 / 2624 DIAGONAL MK 1.5x3 / 3071
DIAGONAL MK 2x2 / 2524 DIAGONAL MK 2x2.5 / 1x3 / 2900 DIAGONAL MK 2x3 / 3310
Item no.
Item no.Item no.
Item no.
Weight
Weight Weight
Weight
(kg)
(kg)(kg)
(kg)
Item name
Item nameItem name
Item name
1990401
3.6 NODE-WALER 90º JOINT MK
1990402
3.7 WALER
-
WALER 90º JOINT MK
LEVELLING
LEVELLING LEVELLING
LEVELLING
AND FORWARD
AND FORWARDAND FORWARD
AND FORWARD
----
MOVING
MOVING MOVING
MOVING
ACCESORIES
ACCESORIESACCESORIES
ACCESORIES
1990550
40.2 JACK 360 MK
1990515
37.7 JACK 150 MK
1990506
7.4 JACK 60 MK
1990530
1990551 1990552 1990553
115.0
161.0
207.0
253.0
JACK WALER MK 0.5 / 1000
JACK WALER MK 1 / 1500 JACK WALER MK 1.5 / 2000 JACK WALER MK 2 / 2500
Page 16
Construcción
ConstrucciónConstrucción
Construcción
16
MK
MK MK
MK
STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
Item no.
Item no.Item no.
Item no.
Weight
Weight Weight
Weight
(kg)
(kg)(kg)
(kg)
Item name
Item nameItem name
Item name
0242460
0.30 BOLT M24x60 DIN
-
931-8.8
0242400
0.11 NUT M24 DIN
-
934-8
1990655
89.0 WHEEL 100 MK
1990660
19.3 WHEEL 15 MK
1990645
93.0 TRIANGULAR BASE
CARRIER
1500 MK
1990504
25.9 HEAD JOINT MK
Item no.
Item no.Item no.
Item no.
Weight
Weight Weight
Weight
(kg)
(kg)(kg)
(kg)
Item name
Item nameItem name
Item name
1990374
25.5 HEAD JOINT 74 MK
1990400
17.0 PLATE NODE HEAD MK
1990405
15.7 HEAD JOINT MK
1990570
0.85 HANDRAIL HEAD MK
PROFILES MK
PROFILES MKPROFILES MK
PROFILES MK----180
180180
180
1990017
1990021 1990025 1990029 1990037 1990045 1990061 1990085
44,10
54,50 64,90 75,40
96,30 117,10 159,00 222,00
PROFILE MK
-
180/2,125
PROFILE MK-180/2,625 PROFILE MK-180/3,125 PROFILE MK-180/3,625 PROFILE MK-180/4,625 PROFILE MK-180/5,625 PROFILE MK-180/7,625 PROFILE MK-180/10,625
Page 17
Construcción
ConstrucciónConstrucción
Construcción
17
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
2.2. ITEMS DESCRIPTION
ITEMS DESCRIPTIONITEMS DESCRIPTION
ITEMS DESCRIPTION
The following connections with bolt and nut will be shortly describes as M16, M20 and M24 in this document, meaning:
- M16: Bolt M16 DIN 931-8.8 + Nut M16 DIN 934-8
- M20: Bolt M20 DIN 931-8.8 + Nut M20 DIN 934-8
- M24. Bolt M24 DIN 931-8.8 + Nut M24 DIN 934-8 + 2 Washers 24 DIN125
2.2.1. WALERS MK-120
The Waler MK is the element all MK applications have in common. Its main feature is the double row of holes it provides for the connection of different parts.
The waler consists of two UPN-120 profiles joined back face-to-face. There are three rows of holes. The
holes of the outer rows have a diameter of ∅17 mm
and the spacing between holes of the same row and towards the other outer row is 62.5 mm.
In the centre row, holes and slots alternate, the holes have a diameter of 20 mm, the slots have a length of 45.5 mm. The spacing between the holes in the centre row is 125 mm.
The centre rows always start and end with 20 mm holes.
2.2.2. NODE 180 MK AND NODE 180 D40 MK
The Node 180 MK enables to connect up to 4 walers placed at 60º. That is, two walers are connected lengthwise with a remaining gap of 375 mm between their respective ends, and the other two are placed at 60º to the previous ones. The connections are fastened with 6 bolts M16 inserted into the D17 holes.
The Node 180 D40 MK differs from the previous one with respect to the connection of another (male) item to the node centre in a hinged way pointing downwards. The connection is fastened with pins D40.
In both cases, the D20 holes are mainly used for the connection of secondary components, i.e., bracing items.
2 Tornillos M16
+
2 Tuercas
Autoblocantes
Agujero
Page 18
Construcción
ConstrucciónConstrucción
Construcción
18
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
2.2.3. NODE 120 MK
This node enables to connect up to 3 walers at 60º. The connections are fastened with 6 bolts M16 inserted into the D17 holes.
The D20 holes are mainly used for the connection of secondary components, i.e., bracing items.
Moreover, another (male) item can be connected to the node centre in a hinged way pointing downwards. The connection is fastened with pins D40.
2.2.4. NODE 60 F MK AND NODE 60 M MK
These nodes enable to connect up to 2 walers at 60º. The connections are fastened with 6 bolts M16 inserted into the D17 holes.
The D20 holes are mainly used for the connection of secondary components, i.e., bracing items.
There are two node types: a female (F) and a male (M). Both enable to connect another item (male or female) to the node centre in in a hinged way with pins D40.
2.2.5. AXIAL NODE M D40 MK AND AXIAL NODE 90º M D40 MK
Both nodes enable to connect any waler to an already assembled structure in a hinged way. The connections are fastened with 6 bolts M16 inserted into the D17 holes. These nodes provide high load­bearing capacity.
They are male nodes connected to a female node of the structure with pins D40.
2.2.6. NODE 360 MK
This node enables to connect up to 6 walers. The connections are fastened with 6 bolts M16 inserted into the D17 holes. Two of the six walers are connected lengthwise with a remaining gap of 375 mm between their respective ends.
Page 19
Construcción
ConstrucciónConstrucción
Construcción
19
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
The D20 holes are mainly used for the connection of secondary components, i.e., bracing items.
2.2.7. NODE 90 MK
These nodes enable to connect up to 2 walers at 90º. The connections are fastened with 6 bolts M16 inserted into the D17 holes.
The D20 holes are mainly used for the connection of secondary components, i.e., bracing items.
2.2.8. NODE 60 SUPPORT MK
The Node 60 Support MK is a kind of foot to support the structure on something, mainly on profiles. It works as support of a bi-supported truss.
It enables to connect up to 2 walers at 60º as the Node 60 MK does. The connections are fastened with 6 bolts M16 inserted into the D17 holes.
The support plate provides D25 (25 mm diameter) and D22 holes to connect other items and accessories.
2.2.9. ORTHOGONAL JOINT MK
The Orthogonal Joint MK connects up to 3 walers perpendicular to each other. The connection with the waler is fastened with 4 bolts M16 inserted into the D17 holes.
It can also connect 2 walers lengthwise. In this case, each waler is fastened with 6 bolts M16 inserted into the D17 holes .
This connector has medium load-bearing capacity and is mainly used in light form carriers.
2.2.10. AXIAL NODE M D20 MK
This node enables to connect one waler to another in a hinged way, always in the main plane. The waler and the node are fastened with 2 bolts M16 inserted into the D17 holes. Unlike the Axial Node M D40, this one does not have high load-bearing capacity.
The hinged connection between the waler and the node is fastened with pins E20x70.
Page 20
Construcción
ConstrucciónConstrucción
Construcción
20
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
2.2.11. V BRACING TRUSS MK
This part serves to reinforce certain points of the structure in its main plane where loads on the structure require such a reinforcement of the waler.
It is connected to the structure with pins E20x70 inserted into the D20 holes, in front view. One side is connected to a joint and the other to the waler.
There is only one type available to brace the triangular structure of 3x3. Any other structure is reinforced with push–pull props E.
The D20 holes enable to connect other walers to the main structure, in cross section view.
2.2.12. PUSH-PULL PROP E
To reinforce a triangular structure other than 3x3, push-pull props E are used. The props are fastened to the structure with pins E20x70.
Push-pull props E are used to reinforce the structure in its main plane against forces acting on it.
Lengths available are those shared with other systems and their properties depend on the prop used in each case.
Push
PushPush
Push----Pull Prop E range up to 2.2
Pull Prop E range up to 2.2Pull Prop E range up to 2.2
Pull Prop E range up to 2.2
Push
PushPush
Push----Pull Prop E range from 2.2
Pull Prop E range from 2.2Pull Prop E range from 2.2
Pull Prop E range from 2.2
2.2.13. PUSH-PULL PROP E - NODE MK JOINT
This item is used to connect the push-pull prop E to any node. The connection to the node is fastened with 2 pins E20x70, whereas the prop is fastened to the joint with only 1 pin E20x70 allowing of a hinged joint.
2.2.14. PIN D40x85
This is the item that fastens male to female node joints. It offers high load-bearing capacity joints which are used for applications where hinged joint are required.
Each pin D40x85 is secured with a Cotter pin D6x42.
Page 21
Construcción
ConstrucciónConstrucción
Construcción
21
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
2.2.15. HORIZONTAL BRACES MK AND DIAGONALS MK
These items make the bracing of the structures.
In top view, the horizontal brace is the item placed perpendicular to the main axis of the structure to keep the distance between two adjoining structures. In order to distinguish them from the diagonals, the horizontal braces are D48 tubes.
L refers to the tube length. The number in the item name refers to the distance in metres at which the structures are kept.
The diagonals complement the bracing, providing the required stiffness to the structure.
L refers to the tube length. The number in the item name refers to the vertical and horizontal projections AxB (in m) of the length of the diagonal.
2.2.16. U SECONDARY AXIS MK
This item connects horizontal braces and diagonals to the structure. It can be placed either on walers or on nodes.
It is fastened to the waler or node with bolts M20 and to the horizontal braces and diagonals with pins E20x70.
An important feature of this joint type is that it enables to connect the bracing back to the waler axis thus obtaining high load-bearing capacity bracing.
2.2.17. U SECONDARY AXIS END MK
This item has the same function as the previous one but is placed at the beginning and the end of the bracing. That is why it can only be assembled on nodes.
It is fastened to the node with bolts M20 and to the horizontal braces and diagonals with pins E20x70.
Page 22
Construcción
ConstrucciónConstrucción
Construcción
22
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
2.2.18. WALER - WALER 90º JOINT MK AND NODE - WALER 90º JOINT MK
The Waler - Waler 90º Joint enables to connect 2 walers perpendicular to each other, in the secondary axis.
The Node -Waler 90º Joint enables to connect a waler perpendicular to a node, in the secondary axis. It complements the previous one.
Both are mainly used for applications where a structure is required to be connected perpendicularly to an already existing structure. They do not work at tension hence such loads must be avoided when using these items.
2.2.19. PIN E20x70
This item is used to fasten all connections between walers, nodes, joints, push-pull props E, horizontal braces or diagonals, respectively, where these are required to be hinged. Each pin E20x70 is secured with a Cotter pin R/5.
2.2.20. JACK 360 MK
The jacks are the elements which allow of the vertical adjustment, that is, the levelling of the form carrier. They are placed at the base of the carrier bogies. The Jack 360 MK is used to adjust heavy-duty form carriers. It has an adjustment range of 220 mm and a working load capacity up to 360 kN. It is fastened to the jack waler with 4 bolts M24.
2.2.21. JACK 150 MK
The Jack 150 MK is used to level medium load­bearing capacity form carriers. It has an adjustment range of 220 mm and a working load capacity up to 150 kN. It is fastened to any END PLATE of the MK Shoring System with 4 bolts M24.
2.2.22. JACK 60 MK
The Jack 60 kN is used to level low load-bearing capacity form carriers. It has an adjustment range of 220 mm and a working load capacity up to 60 kN. It is fastened to the walers with 4 bolts M16.
All jacks must be lubricated before use.
Page 23
Construcción
ConstrucciónConstrucción
Construcción
23
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
2.2.23. JACK WALER MK
The jack walers form the bogie of heavy-duty form carriers. The bogie length can be adjusted at an interval of every 0.5 m. The jack walers are fastened together with 8 bolts M24 inserted into the D25 holes of their end-plate joints, thus creating a longer jack waler profile.
The end-plate joints which determine the layout of the form carrier structure at its base rest on the jack walers. To the other side of the jack waler, the jacks and the wheels to move the form carrier are connected and fastened with 4 bolts M24.
2.2.24. WHEEL 100 MK
The Wheel 100 MK is used for the travel of heavy form carriers. It is fastened to the jack waler that forms the bogie with 4 bolts M24 at the indicated positions. The load-bearing capacity of the Wheel 100 MK lies between 90-100 kN to move form carriers that bear up to 360-400 kN (36-40 tons).
If the distance between wheel and bogie needs to be increased, a spacer can be placed between them.
2.2.25. WHEEL 15 MK
The Wheel 15 MK is used for the travel of the medium-weight form carriers. It is fastened directly to the waler that forms the structure with 4 bolts M16.
The load-bearing capacity per wheel is limited to 15 kN hence a 60 kN (6 tons) form carrier can move by 4 Wheels 15 MK.
2.2.26. TRIANGULAR BASE CARRIER 1500 MK
If there is not enough space for the support of the form carrier at the base, it can be elevated with the triangular base. It is mainly used for heavy-duty cut­and-cover tunnel form carriers. The top is connected to the end-plate joints of the structure and the bottom to the bogie. Both joints are fastened with bolts M24.
It has protrusions at both ends to stabilise and plumb the structure at erection.
Page 24
Construcción
ConstrucciónConstrucción
Construcción
24
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
2.2.27. END JOINT 74 MK AND END JOINT MK
Both items are used to connect the structures to the bogies.
The End Joint 74 MK is applied directly on the structure when the structure itself is high enough to match/obtain? the height of the form carrier?. One end is connected to the walers with 6 bolts M16, the other to the bogie with 4 bolts M24.
The End Joint MK is used to form vertical structures or towers modules, that is, what the previous head joint makes at 74º, the Head Joint MK makes at 90º.
2.2.28. NODE END-PLATE JOINT MK and WALER END-PLATE JOINT MK
The Node End-Plate Joint MK enables an end joint of structures whenever a hinged support on the same is required. It is connected directly onto the MK Shoring Towers or to the bogie.
Likewise, the Waler End-Plate Joint MK enables an end joint of structures on the walers of the structure. It is connected directly onto the MK Shoring Towers or to the bogie.
One end is fastened to the structure with pin D40 in the case of the node end-plate and with 6 bolts M16 in the case of the waler end-plate. The other end is fastened to the shoring towers with 4 bolts M24 or to the main beams with Clamps 16/70.
2.2.29. HANDRAIL HEAD MK
The handrail head serves to place tubes D48 to create a handrail system at any height of the waler. It is fastened with 2 bolts M16.
Page 25
Construcción
ConstrucciónConstrucción
Construcción
25
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
3.
3.3.
3. AAAASSEMBLY, USE AND
SSEMBLY, USE AND SSEMBLY, USE AND
SSEMBLY, USE AND DISMANTLING
DISMANTLINGDISMANTLING
DISMANTLING
3.1.
3.1.3.1.
3.1. TECHNICHAL ASSEMBLY INSTRUCTIONS. GENERAL ASSEMBLY
TECHNICHAL ASSEMBLY INSTRUCTIONS. GENERAL ASSEMBLYTECHNICHAL ASSEMBLY INSTRUCTIONS. GENERAL ASSEMBLY
TECHNICHAL ASSEMBLY INSTRUCTIONS. GENERAL ASSEMBLY
For further information on this section, it is advisable to read and follow the respective technical assembly instructions for the different products offered by the MK System with regard to their erection, dismantling and handling.
ITM_MK01-01 “ERECTION OF THE MK TRUSS SYSTEM WITH AND WITHOUT BOTTOM PLATFORMS IN HORIZONTAL POSITION” ITM_MK02-01 “DISMANTLING OF THE MK TRUSS SYSTEM WITH AND WITHOUT BOTTOM PLATFORMS IN HORIZONTAL POSITION” ITM_MK03-01 “ERECTION OF THE MK TRUSS SYSTEM WITH AND WITHOUT BOTTOM PLATFORMS IN VERTICAL POSITION” ITM_MK04-01 “DISMANTLING OF THE MK TRUSS SYSTEM WITH AND WITHOUT BOTTOM PLATFORMS IN VERTICAL POSITION” ITM_MK05-01 “ERECTION OF THE MK FORM CARRIER SYSTEM WITH AND WITHOUT BOTTOM PLATFORMS IN HORIZONTAL POSITION” ITM_MK06-01 “DISMANTLING OF THE MK FORM CARRIER SYSTEM WITH AND WITHOUT BOTTOM PLATFORMS IN HORIZONTAL POSITION” ITM_MK07-01 “ERECTION OF THE MK FORM CARRIER SYSTEM WITH AND WITHOUT BOTTOM PLATFORMS IN VERTICAL POSITION” ITM_MK08-01 “DISMANTLING OF THE MK FORM CARRIER SYSTEM WITH AND WITHOUT BOTTOM PLATFORMS IN VERTICAL POSITION” ITM_MK09-01 “ERECTION OF THE MK CUT-AND-COVER FORM CARRIER WITH BOTTOM PLATFORMS IN VERTICAL POSITION” ITM_MK10-01 “DISMANTLING OF THE MK CUT-AND-COVER FORM CARRIER WITH BOTTOM PLATFORMS IN VERTICAL POSITION”
3.1.1. Main structure erection. Node assembly
- Start with the assembly of the booms and diagonals. Place the nodes on the waler according to the indications in the assembly drawings.
All waler-node joints are fastened with bolts M16x90. 6 bolts are required for a joint with high load-bearing capacity at compression, 4 bolts for a medium load-bearing capacity and 2 for a low load­bearing capacity. For capacity calculations, all waler­node joints are assumed to be hinged.
Page 26
Construcción
ConstrucciónConstrucción
Construcción
26
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
- If indicated in the assembly drawings, the V Bracing Truss MK is assembled next. Connect it to the node using the bolt M20x90 and to the waler using 2 bolts M16x90. Insert the V Bracing Truss MK into the gap between the waler UPN profiles and connect it to the node of the opposite boom.
3.1.2. Joints and braces assembly. Diagonals and horizontal braces on main axis.
- Place the U secondary axis joints on nodes and
walers of the main axis in direction of the secondary axis and fasten with bolts M20x90.
- Connect the horizontal braces to the U secondary
axis joints with pins E20x70.
3.1.3. Bracing assembly. Diagonals and horizontal braces assembly between structures.
- Assemble another structure equal to the first by
following the steps described in 3.1.1.
- Lift the whole or part of the structure and place it
parallel to the first with the horizontal braces already in place. Fasten the braces to the lifted structure with pins E20x70.
- Assemble the diagonals to finish the bracing of the
module.
3.1.4. Bogie assembly
- By following the indications in the assembly
drawings, place the jack waler with jacks and wheels fastened with bolts M24. Likewise, the jack walers are connected to each other with bolts M24.
- Put the already assembled set on the wheels, and if
indicated in the assembly drawings, place more jack walers perpendicular to the previous ones, and fasten with bolts M24.
Page 27
Construcción
ConstrucciónConstrucción
Construcción
27
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
- Likewise proceed if it is required to assemble the Triangular Base MK.
- Adjust the entity in height and direction with the jacks aided by topography techniques if necessary. If working with triangular bases, use props to plumb the structure at the base.
3.1.5. Platforms and handrail system assembly
If the assembly drawings indicate the installation of working platforms and handrail system, those must be installed before the lifting of the structure.
Platforms can be created in the following ways:
- With B
With BWith B
With BRIO platforms placed onto the horizontal
RIO platforms placed onto the horizontal RIO platforms placed onto the horizontal
RIO platforms placed onto the horizontal
braces:
braces:braces:
braces: no need of extra components.
- With BRIO platforms placed on tubes D48:
With BRIO platforms placed on tubes D48:With BRIO platforms placed on tubes D48:
With BRIO platforms placed on tubes D48: fix the tube onto the Handrail Head MK and fasten with couplers 48. Insert the head into the gap between the waler UPN profiles at the height indicated in the assembly drawings and fasten with bolts M16.
- With Beams VM20 and board:
With Beams VM20 and board:With Beams VM20 and board:
With Beams VM20 and board: place another waler with the Axial Node M D20 MK fastened with bolt M16 additionally to the pin E20x70 at the height indicated in the assembly drawings.
To form the handrail, use tubes D48 connected with the Handrail Head MK and couplers 48. The head is fastened to the waler with bolt M16.
An alternative is to use 2 Tie Rods 15 with Plate Nuts 15 at both sides, as also common for other solutions.
3.1.6. Lifting and positioning of standard structures
- Attach auxiliary load lifting means to the modules
assembled in section 3.1.3 and position the module vertically by means of a mechanical load lifting device.
Page 28
Construcción
ConstrucciónConstrucción
Construcción
28
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
- Move the lifted modules to support them on the jack walers and fasten with bolts M24. Check the levelling of the structure.
- Likewise proceed with as many structures as indicated in the assembly drawings. Usually two structures are lifted together. The bracing with horizontal braces and diagonals between the structures is made after having placed them in their final position.
- In the case of combinations between MK Shoring Towers and MK Structure (Cut-and-cover tunnel form carrier), the lifting is carried out in several steps. To place the structure on towers, use walkway platforms.
- Lift the structure and connect it to the towers with bolts M24. Use a pointed pin to help inserting the bolts into the holes.
- Remove the statutory auxiliary lifting means, and
platforms and auxiliary ladders (if applies).
- Proceed with covering the parts of the structure
with plywood which are indicated in the assembly drawings.
Page 29
Construcción
ConstrucciónConstrucción
Construcción
29
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
4.
4.4.
4. Solutions
SolutionsSolutions
Solutions
High load-bearing capacity structures up to 360 kN are obtained with triangular structures. These structures are mainly used for solutions such as gantry shoring systems, trusses, deck flange and cut­and-cover tunnel form carriers.
These structures are characterised by using walers for all diagonal and horizontal connections in direction of the main axis, and by using such nodes that allow of connecting one, two, three or more walers at 60º. Those can be alternated at determined points of the structure with nodes allowing of waler connections at 90º and 45º.
All high load-bearing capacity joints are fastened with 6 bolts M16 quality 8.8 and their corresponding nuts providing a maximum tensile or compression load of 360 kN to the node.
The triangular structures are formed with the same waler size, the load-bearing capacity increasing proportionally to the waler length. However, there is another limitation to the structure at buckling in the direction of the weak or secondary axis.
The waler providing the best structure weight– working load ratio is the Waler MK-120 / 2.625 enabling a distance between nodes of 3 m. Usually the structure is assembled at once, although it might be useful to divide the assembly in modules
in order to ease future operations such as the placing of the structure into its final position.
Medium load-bearing capacity structures up to 150 kN are characterised by using more frequently tubular elements for the diagonal and horizontal connections, reserving the walers for the most demanding parts of the structure. These structures are mainly used for solutions such as vertical formwork carriers or parapet form carriers.
Medium load-bearing capacity joints are fastened with pins D20 providing a maximum tensile or compression load of 75 kN to the diagonals and 360 kN to the walers. Moreover, there is the load limitation of the tube used for the diagonals and horizontal braces.
Page 30
Construcción
ConstrucciónConstrucción
Construcción
30
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
4.1 STRUCTURE TYPES
4.1.1 Truss structure
4.1.2 Hanging structure
4.1.3 Structure of form carriers
4.1.4 Forward-moving structure
4.2 STRUCTURE LAYOUTS
4.2.1 High load-bearing capacity structure
4.2.2 Reinforced main axis structure
4.2.3 Medium load-bearing capacity
structure
4.2.4 Secondary axis structure
4.3 BRACING BETWEEN STRUCTURES
4.3.1 Bracing on waler axis
4.3.2 Bracing off waler axis
Page 31
Construcción
ConstrucciónConstrucción
Construcción
31
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
4.4 STRUCTURE CONNECTION WITH SHORING SYSTEM
4.4.1 Support on shoring towers or props
4.4.2 Support on bogie
4.5 STRUCTURE LEVELLING
4.5.1 High load-bearing structure
4.5.2 Medium load-bearing structure
4.6 FORWARD-MOVING OF STRUCTURES
4.6.1 High load-bearing structure
4.6.2 Medium load-bearing structure
4.7 SAFETY AND ACCESS PLATFORMS
Page 32
Construcción
ConstrucciónConstrucción
Construcción
32
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
4.1.
4.1.4.1.
4.1. STRUCTURE TYPES
STRUCTURE TYPESSTRUCTURE TYPES
STRUCTURE TYPES
4.1.1. Bi- or multi-supported truss structure
This refers to truss structures resting on at least two supports. These are mainly used for high load­bearing capacity structures up to 360 kN on horizontal braces and diagonals.
The structures can be supported on the ends or on the central part thus working as a beam at bending with point load or distributed load.
Truss structures are adapted to the spans between supports and to the load-bearing capacity required for the structure.
Solutions with constant and metric distances between nodes are preferred hence the most commonly used waler lengths for this structure type are:
Theoretical length
Theoretical lengthTheoretical length
Theoretical length Nodes distance
Nodes distanceNodes distance
Nodes distance
1.625 m 2 m
2.125 m 2.5 m
2.625 m 3 m
Truss structures are frequently combined with the MK Shoring system. The levelling and adjustment elements applied are usually of high load-bearing capacity (360kN).
The forward-moving of those heavy structures is carried out with the Wheel 100 MK.
4.1.2. Hanging structures
This refers to structures which are not directly supported on the ground or floor but are hanging from others which are supported though.
Hanging structures usually hold the formwork and must only be able to bear loads in order to transmit them to the structures being supported on the ground.
MK - 2625 MK - 2625
MK - 2625MK - 2625 MK - 2625
Page 33
Construcción
ConstrucciónConstrucción
Construcción
33
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
In general, they are tied directly to the main structures with pins D40 allowing of a fast and safe on-site assembly.
Hanging structure in a MK deck flange form carrier
Hanging structure in a MK deck flange form carrierHanging structure in a MK deck flange form carrier
Hanging structure in a MK deck flange form carrier
Hanging structure in a MK vertical formwork
Hanging structure in a MK vertical formworkHanging structure in a MK vertical formwork
Hanging structure in a MK vertical formwork carrier
carriercarrier
carrier
Hanging structure in a MK cut
Hanging structure in a MK cutHanging structure in a MK cut
Hanging structure in a MK cut----and
andand
and----cover tunnel form carrier
cover tunnel form carriercover tunnel form carrier
cover tunnel form carrier
4.1.3. Structure of form carriers
Such structures must only bear their self-weight plus the formwork they hold. They are medium load­bearing capacity structures and light, in general.
MK
MKMK
MK parapet form carrier structure
parapet form carrier structureparapet form carrier structure
parapet form carrier structure
The horizontal braces and diagonals are tubes in all directions, reserving the walers for the most demanding areas of the structure, in this case, to connect levelling and rolling elements.
The rolling and levelling parts have lower load­bearing capacity: 150 kN and 60 kN for the jacks and 25 kN for the wheels.
Occasionally, when these structures are submitted to concrete loads caused by lateral forces or they support single-sided wall formwork, walers are used to reinforce the horizontal axis.
MK vertical formwork carrier structure
MK vertical formwork carrier structureMK vertical formwork carrier structure
MK vertical formwork carrier structure
TF - 0121
TF - 0121
TF - 0121
TF - 0121
Page 34
Construcción
ConstrucciónConstrucción
Construcción
34
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
4.1.4. Forward-moving structures
For the forward-moving of heavy structures, an auxiliary structure is required.
Such complementary or secondary structure (bogie) is placed perpendicular to the main structure easing the forward-moving of the overall structure consisting of several main structures.
The bogie must bear the loads during the forward­moving of the overall structure but does not necessarily have to bear the loads during concrete placement or working stage.
It can be rather simple consisting of jack walers joined together, and supporting the structure and jacks on one side and the rolling elements on the other.
The bogie can be reinforced with elements of the MK system. This might apply when the jack walers alone are not able to bear the weight of the overall structure or to provide extra stability to it, as in the case of very tall structures.
Forward
ForwardForward
Forward----moving structure in a MK deck flange form carrier
moving structure in a MK deck flange form carriermoving structure in a MK deck flange form carrier
moving structure in a MK deck flange form carrier
Forward
ForwardForward
Forward----moving structure in a
moving structure in a moving structure in a
moving structure in a MK cut
MK cutMK cut
MK cut----and
andand
and----cover tunnel form
cover tunnel form cover tunnel form
cover tunnel form
carrier
carriercarrier
carrier
4.2.
4.2.4.2.
4.2. STRUCTURE LAYOUTS
STRUCTURE LAYOUTS STRUCTURE LAYOUTS
STRUCTURE LAYOUTS
4.2.1. High load-bearing capacity structure
There are various structures of this kind in all sorts of applications, and inside them, there are different node connection types depending on the area required to be solved.
60º joint Used at the ends which require a termination of the structure at 60º. Moreover useful when a pre­assembled structure (or tower) shall be quickly joined to an already existing one.
120º joint Used at the ends which require a termination of the structure at 120º. Moreover useful when a pre­assembled structure (or tower) shall be quickly joined to an already existing one.
MK - 3625 MK - 3625 MK - 3625
Page 35
Construcción
ConstrucciónConstrucción
Construcción
35
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
180º joint Used for the intermediate nodes of the structure.
There are two options depending on the requirement to quickly join a pre-assembled structure (or tower) to the intermediate joints or not. In the latter case, the waler could pass through the node and 4 bolts on each side of the joint would be sufficient.
60º joint with support Used at the ends which require a termination of the structure at 60º and at the same time a support located on the top part of the truss.
90º joint Used at the ends which require a termination of the structure at 90º. Moreover useful when a pre­assembled structure (or tower) shall be quickly joined to an already existing one.
74º joint Used at the ends which require an end joint at 74º. This joint provides a single support in direction of the main axis, as it is the case on bogies.
Page 36
Construcción
ConstrucciónConstrucción
Construcción
36
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
Joint with pins It is used to join two structures quickly and effectively. These are usually end joints which require a male end element on one structure and a female on the other. There are several parts fulfilling this function.
The joint is fastened with a conical tip pin D40.
4.2.2. Reinforced main axis structure
For the reinforcement of the waler centre or a specific part of the structure of high load-bearing capacity structures, the V Bracing Truss MK is used.
This part only serves to reinforce the most common triangular structure layout of 3 m between nodes. If the distance between nodes is bigger or smaller, push-pull props E and heads are used.
The joints are fastened with pins E20x70.
4.2.3. Medium load-bearing capacity structure
As mentioned beforehand, there are various structures of this kind in all sorts of applications, and inside them, there are different node connection types depending on the area required to be solved.
Longitudinal joints between walers There are two types of longitudinal joints for walers offering different additional features:
- The first waler joint can be stiffened with diagonals
and braced in the secondary axis. It moreover allows of a 375 mm gap between the walers.
Page 37
Construcción
ConstrucciónConstrucción
Construcción
37
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
- The second waler joint is a joint only between walers. The bracing of the secondary axis is made at another point. It enables either a butt joint fastened with 6 bolts each or a joint with a 125 mm gap between walers fastened with 4 bolts. In the latter case, walers can be crossed.
4.2.4. Secondary axis structure. Waler joints at different level
This refers to joints between walers perpendicular between the main axis and the secondary axis. There are various possible solutions depending on the specific application.
The walers can be independent (formwork) or part of other structures to be installed in this direction.
These joints can only work at compression, never at tension. Therefore the joints must be assembled to support the secondary walers on the main ones and never the other way around.
Waler on waler joint The Waler-Waler 90º Joint MK is used to join walers of the secondary axis on top of the walers of the main axis.
The joint can be fixed at any point of the waler, aligned with a hole or slot every 62.5 mm, in both directions.
Waler on node joint In accordance with the previous joint, the Node­Waler 90º Joint MK is used to join the secondary axis waler on top of a node of the main axis. This joint can only be connected to the centre of the node.
Page 38
Construcción
ConstrucciónConstrucción
Construcción
38
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
Waler on V Bracing Truss MK joint There is still another way to join two walers. That is with the V Bracing Truss MK and without any additional part. The V bracing can only be fixed to the centre of a main truss waler, and only if tubes are used in the application.
4.3.
4.3.4.3.
4.3. BRACING BETWEEN STRUCTURES
BRACING BETWEEN STRUCTURES BRACING BETWEEN STRUCTURES
BRACING BETWEEN STRUCTURES
Bracing between structures is understood as all tubes and joints used to connect two or more equal structures parallel to each other and thus also reinforcing them in the secondary plane.
This tubes and joints framework structure must mainly be able to absorb secondary actions such as lateral wind, forces during the process of forward­moving of the structures and forces due to inclinations or slopes of the application.
In some cases, these loads might happen to be important, therefore the requirement to use bracing which transmits the actions to the structure axis.
There is another possibility to externally brace the structures. However, this bracing does not offer the same qualities of the previous one and may only be
used when actions in the secondary plane are certainly not important.
4.3.1. Bracing on waler axis
For this type of bracing, diagonals and horizontal braces are used, joined to the walers with U secondary axis joints fastened and with pins D20. Hence these connections are all hinged which requires them to be also braced diagonally at some points to achieve an appropriate bracing for all the structures.
The bracing system transmits the forces to the waler axis, and the horizontal braces join and determine the distance between two adjacent structures. More structures can be braced parallel to the other, always in the secondary plane.
4.3.2. Bracing off waler axis
Tubes and couplers are directly fixed to the Handrail Head MK joined to the walers and fastened with 2 bolts M16.
This type of bracing does not offer the same qualities of the previous one and is not advisable to be used with high load-bearing capacity structures.
Its main advantage is its simplicity (few elements) and ease of assembly hence it is very useful for the bracing of light structures. It may also be used to join two independent, that is, self-standing sets or form carriers which are not supposed to be moved.
Page 39
Construcción
ConstrucciónConstrucción
Construcción
39
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
4.4.
4.4.4.4.
4.4. STRUCTURE CONNECTION WITH
STRUCTURE CONNECTION WITH STRUCTURE CONNECTION WITH
STRUCTURE CONNECTION WITH
SHORING SYSTEM
SHORING SYSTEMSHORING SYSTEM
SHORING SYSTEM
There are two types of connections between standard truss structures and support structures.
4.4.1. Support on shoring towers or props
The support of the structure on the shoring can as well be secured in two different ways:
Directly on the shoring: The structure rests
directly on top of one shoring leg.
The joint can be pinned or simply resting on the shoring and being fastened subsequently with bolts.
(1) The first case requires male-female joints as the ones described before. Their implementation is easier for structures of small height and or for such being assembled on the ground.
This type is frequently used for connections with the MK Prop system.
(2) For the second case, head joints are used as end elements as well for the structure as for the shoring or towers.
These joints allow of the pre-assembly of towers. Only subsequently, the structure is supported on and fastened to them.
This joint type suits best the requirements of heavy and large structures.
MK truss structure supported on MK tower
MK truss structure supported on MK towerMK truss structure supported on MK tower
MK truss structure supported on MK tower
MK cut
MK cutMK cut
MK cut----and
andand
and----cover tunnel form carrier
cover tunnel form carriercover tunnel form carrier
cover tunnel form carrier
Both cases require high assembly accuracy as well as the same number of structures and lines of supports.
With load distributing beam: This is the classical
support for gantry solutions. Its main advantage lies in the better load and force distribution on the supports.
This connection type does not require an equal number of lines of supports and structures with the correspondent savings which this supposes.
Con
strucció n
Page 40
Construcción
ConstrucciónConstrucción
Construcción
40
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
4.4.2. Support on bogie
This is the case of cut-and-cover tunnel and deck flange form carriers where the main structure rests on the jack walers (or a similar profile acting as bogie) and where the end joints fixed to the jack walers form the end of the structures, tied on the fastening points of the profiles.
In case the structure does not have end joints, a joint with similar features shall be found for the connection.
4.5.
4.5.4.5.
4.5. STRUCTURE LEVELLING
STRUCTURE LEVELLINGSTRUCTURE LEVELLING
STRUCTURE LEVELLING
4.5.1. High load-bearing capacity structure
These structures commonly have a bogie. The levelling of these structures is done with the Jacks MK 360 below the jack walers that form the bogie. If the acting loads allow it, Jacks MK 150 might also be used.
The number of jacks necessary to level the structure depends on the application. As general rule, one levelling line per each main structure support is required to avoid loading the bogie when the structure is not in the process of forward-moving.
For ordinary form carrier solutions such as cut-and­cover tunnel or deck flange and always if a stable support area of sufficient size is available, two pairs of jacks at both sides of the bogie are placed to free the guide rail used for the forward-moving of the form carrier.
If only a reduced support area for the form carrier is available, the same is reduced to only one row of supports. In such case, the jacks should rest directly on the guide rail. The levelling of this type of structures supposes rather complicated solutions.
Page 41
Construcción
ConstrucciónConstrucción
Construcción
41
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
4.5.2. Medium load-bearing capacity structure
For lighter form carriers, the levelling is done using the Jack MK 60. These solutions do not require a secondary structure for the forward-moving, and are usually made up of 2 or 3 main structures. Common applications are vertical formwork carriers or such applications where load requirements of the structure are not significant.
4.6.
4.6.4.6.
4.6. FORWARD
FORWARDFORWARD
FORWARD----MOVING OF STRUCTURES:
MOVING OF STRUCTURES: MOVING OF STRUCTURES:
MOVING OF STRUCTURES:
ROLLING SYSTEM
ROLLING SYSTEMROLLING SYSTEM
ROLLING SYSTEM
4.6.1. High load-bearing capacity structure
The forward-moving of this type of structures is done with Wheels MK 100 attached directly onto the jack walers which form the bogie. During the process of forward-moving, the wheels run on a guide rail. The guide rail rests directly on the ground and is anchored to it.
The guide rail is quite heavy (HEB-200 type) due to the loads it must bear. The pulling of the structure to
the next pouring stage is done with the aid of load arrester devices (e.g. Tractels).
Each form carrier or structure usually has 4 wheels which allows of moving up to 40 tons. The wheels are also the support points for the secondary structure (bogie). In this case, the bogie bears the total weight of the form carrier. Once the forward­moving has finished, the form carrier gets blocked by means of the jacks and the bogie gets not loaded any more.
4.6.2. Medium load-bearing capacity structure
Lighter form carriers are moved forward with the Wheel MK 15 up to 60 kN. These are made up of several main structures, and the wheels are attached directly to the jack walers.
A lighter guide rail is used (UPN type) and the forward-moving of the structure is done manually.
Page 42
Construcción
ConstrucciónConstrucción
Construcción
42
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
4.7.
4.7.4.7.
4.7. SAFETY AND ACCESS PLATFORMS
SAFETY AND ACCESS PLATFORMSSAFETY AND ACCESS PLATFORMS
SAFETY AND ACCESS PLATFORMS
Safety platforms are assembled directly on the structures. This can be done in two ways:
Directly on two adjoining structures with the available walers. Secondary beams and board rest on the walers. Depending on the beam used, the corresponding fixing system is employed.
Directly on the bracing tubes between structures with metal scaffolding platforms on round or square tubes.
Platforms can be installed at any point of the structure to provide working areas at different levels and thus assisting the assembly. Moreover, access platforms provide access to higher areas if required.
The first option allows of installing cantilever platforms, that is, platforms outside the structure.
Both options similarly serve to assemble platforms inside the structure.
The safety handrail system can also be assembled in two different ways:
With Handrail Heads MK on secondary
beamsusing the appropriate handrails for each case as in any other system.
With Handrail Heads MK on walersassembling
the handrail heads directly onto the walers of the structure. Tubes and couplers get fastened to the head. Typically used with metal (scaffolding) platforms, this option suits well any kind of platform.
5.
5.5.
5.
Page 43
Construcción
ConstrucciónConstrucción
Construcción
43
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
52
120
SYSTEM PROPERTIES
SYSTEM PROPERTIESSYSTEM PROPERTIES
SYSTEM PROPERTIES
It is rather difficult to define limits for the manifold possible structure options which can be formed with the MK system. As for their variety, each structure must be calculated on an individual basis. Nevertheless, this chapter gives the necessary data to perform these calculations, and presents some limits for the most critical elements.
Some working load tables for particular applications are given below which may serve as orientation on the obtainable load-bearing capacity of these structures.
5.1.
5.1.5.1.
5.1. MAIN ITEM PROPERTIES
MAIN ITEM PROPERTIESMAIN ITEM PROPERTIES
MAIN ITEM PROPERTIES
5.1.1. WALER MK-120
The technical material properties of the WALER MK-120 are:
m = 27.5 [kg/m] weight/m A = 27.5 10-4 [m2] net section area (without holes) fy = 275 [MPa] yield strength
Main axis (strong axis):
Avzz =12,32 10-4 [m2] shear area Iyy = 680 10-8 [m4] moment of inertia W
elyy
= 113 10-6 [m3] Young's modulus
Secondary axis (weak axis):
Avyy =17,2 10-4 [m2] shear area Izz = 311 10-8 [m4] moment of inertia W
elzz
= 38 10-6 [m3] Young's modulus
W
plyy
= 128 10-6 [m3] plastic section modulus?
The technical properties of the WALER MK-120 are (for SLS loads): MMMM
Rdyy
RdyyRdyy
Rdyy
= 21.33
= 21.33= 21.33
= 21.33 (kN m)
(kN m)(kN m)
(kN m) Maximum permissible bending moment on axis y-y
VVVV
Rdzz
RdzzRdzz
Rdzz
= 118,2
= 118,2 = 118,2
= 118,2 (kN)
(kN)(kN)
(kN) Maximum permissible shear force on axis y-y?
MMMM
Rdzz
RdzzRdzz
Rdzz
= 6.3
= 6.3= 6.3
= 6.3 (kN m)
(kN m) (kN m)
(kN m) Maximum permissible bending moment on axis z-z
y y
z
z
Page 44
Construcción
ConstrucciónConstrucción
Construcción
44
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
Compression load of WALER MK
Compression load of WALER MKCompression load of WALER MK
Compression load of WALER MK----120
120120
120
Free length
Free lengthFree length
Free length Compression load N
Compression load NCompression load N
Compression load N
crd
crd crd
crd
(SLS)
(SLS)(SLS)
(SLS)
1.5 m
1.5 m1.5 m
1.5 m 360 kN **
360 kN **360 kN **
360 kN **
2 m
2 m2 m
2 m 336 kN
336 kN 336 kN
336 kN
2.5 m
2.5 m2.5 m
2.5 m 287 kN
287 kN287 kN
287 kN
3 m
3 m3 m
3 m 240 kN
240 kN240 kN
240 kN
** Limited by the joint with 6 bolts
Values of pure buckling, not considering bending moment effects on any axis
5.1.2. PIN E20X70 AND PUSH-PULL PROP E JOINTS
The working load of the pin E20x70 in the WALER MK-120
5.1.3. PIN E20X70 AND TUBE 50X6 JOINT (V BRACING TRUSS MK TUBE)
The working load of the pin E20x70 in the WALER MK-120
Designation
DesignationDesignation
Designation Working load (SLS)
Working load (SLS)Working load (SLS)
Working load (SLS)
PIN E20x70
PIN E20x70PIN E20x70
PIN E20x70 77 kN
77 kN77 kN
77 kN
5.1.4. PIN E20X70 AND TUBE 50X4 JOINT
The working load of the pin E20x70 in the WALER MK-120
Designation
DesignationDesignation
Designation Working load (SLS)
Working load (SLS)Working load (SLS)
Working load (SLS)
PIN E20X70
PIN E20X70PIN E20X70
PIN E20X70 30 kN **
30 kN **30 kN **
30 kN **
** The strength limit of the diagonals is given by the tearing of the hole
Designation
DesignationDesignation
Designation Working load (SLS)
Working load (SLS)Working load (SLS)
Working load (SLS)
PIN E20x70
PIN E20x70PIN E20x70
PIN E20x70 77 kN
77 kN77 kN
77 kN
Page 45
Construcción
ConstrucciónConstrucción
Construcción
45
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
5.1.5. PINNED JOINTS: PIN D40 AND MK CONNECTOR / NODES / JOINTS
The working load of the pin D40 used in a joint of the structure:
Designation
DesignationDesignation
Designation Working load (SLS)
Working load (SLS)Working load (SLS)
Working load (SLS)
PIN E40X70
PIN E40X70PIN E40X70
PIN E40X70 426 kN
426 kN426 kN
426 kN
5.1.6. BOLTED JOINTS: WALERS AND NODES
The working load of a joint fixed with 6 bolts between Walers MK-120 and different nodes is:
Designation
DesignationDesignation
Designation Axile
Axile Axile
Axile
Max
MaxMax
Max
(SLS)
(SLS)(SLS)
(SLS) M
M M
M
Max
MaxMax
Max
(SLS)
(SLS)(SLS)
(SLS)
6666----bolt joint at tension
bolt joint at tensionbolt joint at tension
bolt joint at tension 360 kN
360 kN360 kN
360 kN 0 kNm
0 kNm0 kNm
0 kNm
6666----bolt joint at bending
bolt joint at bending bolt joint at bending
bolt joint at bending moment
momentmoment
moment 0 kN
0 kN0 kN
0 kN 16.4 kNm
16.4 kNm16.4 kNm
16.4 kNm
The working load of a joint fixed with 4 bolts between Walers MK-120 and different nodes is:
Designation
DesignationDesignation
Designation Axile
Axile Axile
Axile
Max
MaxMax
Max
(SLS)
(SLS)(SLS)
(SLS) M
M M
M
Max
MaxMax
Max
(SLS)
(SLS)(SLS)
(SLS)
4444----bolt joint at tension
bolt joint at tensionbolt joint at tension
bolt joint at tension 240 kN
240 kN240 kN
240 kN 0 kNm
0 kNm0 kNm
0 kNm
4444----bolt joint at bending moment
bolt joint at bending momentbolt joint at bending moment
bolt joint at bending moment 0 kN
0 kN0 kN
0 kN 10.6 kNm
10.6 kNm10.6 kNm
10.6 kNm
The working load of a joint fixed with 2 bolts between Walers MK-120 and different nodes is:
Designation
DesignationDesignation
Designation Axile
Axile Axile
Axile
Max
MaxMax
Max
(SLS)
(SLS)(SLS)
(SLS) M
M M
M
Max
MaxMax
Max
(SLS)
(SLS)(SLS)
(SLS)
2222----bolt joint at tension
bolt joint at tensionbolt joint at tension
bolt joint at tension 120 kN
120 kN120 kN
120 kN 0 kNm
0 kNm0 kNm
0 kNm
2222----bolt joint at bending moment
bolt joint at bending momentbolt joint at bending moment
bolt joint at bending moment 0 kN
0 kN0 kN
0 kN 3.7 kNm
3.7 kNm3.7 kNm
3.7 kNm
These values refer to the maximum working load of the joint at pure tension and bending moment. They do
not refer to the load combination of both.
Page 46
Construcción
ConstrucciónConstrucción
Construcción
46
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
5.1.7. DIAGONAL TUBES MK (50x4)
For any length of diagonals
DIAGONAL LENGTH
DIAGONAL LENGTHDIAGONAL LENGTH
DIAGONAL LENGTH TENSION (SLS)
TENSION (SLS)TENSION (SLS)
TENSION (SLS) COMPRESSION (SLS)
COMPRESSION (SLS)COMPRESSION (SLS)
COMPRESSION (SLS)
Any
AnyAny
Any 30 kN
30 kN30 kN
30 kN 30 kN
30 kN30 kN
30 kN
It is NOT
NOTNOT
NOT enough to verify the diagonals at buckling because diagonals submitted only to tension must be
verified with respect to the working load value NEVER
NEVERNEVER
NEVER exceeding 30 kN due to the tear of the 20 hole of the
diagonal. The maximum working load of the diagonals is given by the tearing of the hole.
5.1.8. HORIZONTAL BRACES MK
Two limit values are given below for the horizontal braces. The first value does not consider any working platform installed on the braces hence they are only submitted to compression loads. The second value considers apart from compression, the generation of bending moments along the brace due to working platforms.
For the first case and for any length of horizontal braces:
BRACE LENGTH
BRACE LENGTHBRACE LENGTH
BRACE LENGTH TENSION (SLS)
TENSION (SLS)TENSION (SLS)
TENSION (SLS) COMPRESSION (SLS)
COMPRESSION (SLS)COMPRESSION (SLS)
COMPRESSION (SLS)
Any
AnyAny
Any 20 kN
20 kN20 kN
20 kN 20 kN
20 kN20 kN
20 kN
It is NOT
NOTNOT
NOT enough to verify the horizontal braces at buckling because braces submitted only to tension must be
verified with respect to the working load value NEVER
NEVERNEVER
NEVER exceeding 20kN due to the tear of the 20 hole of the
diagonal. The maximum working load of the braces is given by the tearing of the hole.
CC
CC
Page 47
Construcción
ConstrucciónConstrucción
Construcción
47
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
For the second case:
BRACE LENGTH
BRACE LENGTHBRACE LENGTH
BRACE LENGTH DISTRIBUTED LOAD (SLS) R
DISTRIBUTED LOAD (SLS) RDISTRIBUTED LOAD (SLS) R
DISTRIBUTED LOAD (SLS) R COMPRESSION (SLS)
COMPRESSION (SLS)COMPRESSION (SLS)
COMPRESSION (SLS)
0.75 m
0.75 m0.75 m
0.75 m ---- kN/m
kN/mkN/m
kN/m 10 kN
10 kN10 kN
10 kN
1 m
1 m1 m
1 m 17 kN/m
17 kN/m17 kN/m
17 kN/m 10 kN
10 kN10 kN
10 kN
1.5 m
1.5 m1.5 m
1.5 m 5.8 kN/m
5.8 kN/m5.8 kN/m
5.8 kN/m 10 kN
10 kN10 kN
10 kN
2 m
2 m2 m
2 m 2.6 kN/m
2.6 kN/m2.6 kN/m
2.6 kN/m 10 kN
10 kN10 kN
10 kN
2.5 m **
2.5 m **2.5 m **
2.5 m ** 1.1 kN/m
1.1 kN/m1.1 kN/m
1.1 kN/m 10 kN
10 kN10 kN
10 kN
3 m **
3 m **3 m **
3 m ** 1.9 kN/m
1.9 kN/m1.9 kN/m
1.9 kN/m 10 kN
10 kN10 kN
10 kN
** Due to the permissible load distribution, it is advisable not to install platforms on the horizontal braces of
2.5 m and 3 m. In any case, these braces require a previous verification.
5.1.9. BEAM VM20
Technical properties of the Beam VM20:
MMMM
ad
adad
ad
= 5
= 5 = 5
= 5 (kNm)
(kNm)(kNm)
(kNm) Maximum permissible bending moment
QQQQ
ad
adad
ad
= 11
= 11 = 11
= 11 (kN)
(kN)(kN)
(kN) Maximum permissible shear force
EI = 450
EI = 450 EI = 450
EI = 450 (kN m
(kN m(kN m
(kN m
2222
) Stiffness (EI)
5.1.10. PLYWOOD BOARDS (SHUTTERING FACE)
Regarding the high variety of different board types on the market, a separate document collects all mechanical properties of formwork boards. For more information, please refer to that document.
CCCC
CCCC
RRRR
Page 48
Construcción
ConstrucciónConstrucción
Construcción
48
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
5.1.11. JACK WALER MK
The jack waler is studied for the stripping at a 250 mm distance from the supporting areas of the posts. These areas have to be properly stiffened.
F = 360 kN (SLS)
F = 360 kN (SLS)F = 360 kN (SLS)
F = 360 kN (SLS)
Technical properties of the Jack Waler MK:
m = 72.4 (kg/m) weight/m A = 92.24 10-4 (m2) net section area (without holes) Avzz =42.16 10-4 (m2) shear area Avyy =62.90 10-4 (m2) shear area Iyy = 8590 10-8 (m4) moment of inertia Izz = 5274 10-8 (m4) moment of inertia W
elyy
= 687 10-6 (m3) Young's modulus W
elzz
= 376 10-6 (m3) Young's modulus
fy = 355 (MPa) yield strength
The maximum permissible bending moment and shear force of the connection is:
8 bolts M24x60 8.8
Mmax yy (SLS) = 75 kNm 45 % waler strength
Tmax yy (SLS) = 300 kN
8 bolts M24x60 10.9
Mmax yy (SLS) = 100 kNm 60 % waler strength
Tmax yy (SLS) = 375 kN
T
Page 49
Construcción
ConstrucciónConstrucción
Construcción
49
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
5.1.12. JACK MK 360
The working loads of the Jack MK 360 are indicated in the table below. The table shows the possible combinations of axial (V) and horizontal (H) forces for the different jack extensions. In the same figure, two straight lines delimit the values for which there might be a sliding of the nut with respect to the fixed base depending on some estimated friction coefficients for a nut lubricated or non-lubricated on its base.
5.1.13. JACK MK 150
The working loads for the JACK MK 150:
VVVV max (SLS)
max (SLS)max (SLS)
max (SLS) H max (SLS)
H max (SLS)H max (SLS)
H max (SLS)
150 kN
150 kN150 kN
150 kN 8 kN
8 kN8 kN
8 kN
Combinacion AXIL-H ADMISIBLE
PARA EVITAR (DESLIZAMIENTO TUERCA o ROTURA HUSILLO )
0,0
20,0
40,0
60,0
80,0
100,0
120,0
0 50 100 150 200 250 300 350 4 00
AXIL MAXIMO ADMISIBLE E.L.S.(k N)
H MAXIMO ADMISIBLE E.L.S. (kN)
Extension Husillo 50 Extension Husillo 1 00 Extension Husillo 200
BASE TUERCA LUBRIC ADA BASE TUERCA SIN LUBRIC AR
POSIBLE DESLIZAMIENTO TUERCA RESPECTO AL PERFIL HUSILLO EN FUNCION DEL COEFI CIENTE DE ROZAMIENTO EXISTENTE
Page 50
Construcción
ConstrucciónConstrucción
Construcción
50
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
5.2.
5.2.5.2.
5.2. LIMITS FOR STANDARD STRUCTURES
LIMITS FOR STANDARD STRUCTURESLIMITS FOR STANDARD STRUCTURES
LIMITS FOR STANDARD STRUCTURES
The following information and data may merely act as reference. Formulas included in different calculation bases for truss beams are used. They are valid as a first approximation but it is advisable to always verify individually any truss application.
There are no whatsoever limits for possible truss deformations included herein. Those must be verified with the help of calculation software for structures.
5.2.1. Bi-supported truss structure
This refers to a truss with supports at both ends as shown in the following figure. The spans possible to achieve with this truss vary depending on the applied modulation. Three load application cases are analysed subsequently:
As distributed load along the truss
As point load applied on the centre of the upper boom
As point loads applied on all nodes of the upper boom
The tables show the maximum permissible load in SLS for each truss (qmax) (Pmax): maximum reaction on prop­boom joint?, maximum bending moment the truss is able to absorb (M truss max), maximum bending moment in the waler, maximum axial force in the waler and reactions on the supports depending on the distance between nodes of the truss.
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
Page 51
Construcción
ConstrucciónConstrucción
Construcción
51
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
5.2.1.1. Node distance 3 m
L
Truss
3
m
h
Truss
2,60
m
Longitud Total
Truss (m)
qmax kN/m
(ELS)
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
12 31,93 59,86 Tubo 50x50x6 574,67 8,98 221,19 191,56
15
24,08 45,15 Tubo 50x50x6 677,32 6,77 260,70 180,62
18
18,52 34,73 Tubo 50x50x6 750,10 5,21 288,71 166,69
21
14,55 27,28 Tubo 50x50x6 802,06 4,09 308,71 152,77
24
11,66 21,87 Tubo 50x50x6 839,82 3,28 323,25 139,97
27
9,52 17,86 Tubo 50x50x6 867,84 2,68 334,03 128,57
30
7,90 14,82 Tubo 50x50x6 889,05 2,22 342,19 118,54
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
L
Truss
3
m
h
Truss
2,60
m
Longitud Total
Truss (m)
qmax * kN/m
(ELS)
Pmax kN
(ELS
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
12
26,34 39,51 49,38 Tubo 50x50x6 474,08 11,14 182,48 158,03
15 20,76 31,14 38,92 Tubo 50x50x6 583,87 8,78 224,73 155,70
18
16,49 24,74 30,92 Tubo 50x50x6 667,89 6,98 257,07 148,42
21 13,27 19,90 24,88 Tubo 50x50x6 731,35 5,61 281,50 139,30
24
10,83 16,24 20,30 Tubo 50x50x6 779,41 4,58 299,99 129,90
27 8,96 13,44 16,79 Tubo 50x50x6 816,18 3,79 314,15 120,92
30 7,51 11,26 14,08 Tubo 50x50x6 844,69 3,18 325,12 112,63
Longitud Total
Truss (m)
qmax * kN/m
(ELS)
Pmax kN
(ELS
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
12
44,54 66,81 59,38 Tubo 50x50x6 801,69 0,00 308,57 300,63
15 33,26 49,88 45,35 Tubo 50x50x6 935,31 0,00 360,00 274,36
18
23,09 34,64 31,98 Tubo 50x50x6 935,31 0,00 360,00 225,17
21 16,97 25,45 23,75 Tubo 50x50x6 935,31 0,00 360,00 190,88
24
12,99 19,49 18,34 Tubo 50x50x6 935,31 0,00 360,00 165,63
27
10,26 15,40 14,59 Tubo 50x50x6 935,31 0,00 360,00 146,26
30 8,31 12,47 11,88 Tubo 50x50x6 935,31 0,00 360,00 130,94
* Valores orientativos (referencia para comparar)
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
Page 52
Construcción
ConstrucciónConstrucción
Construcción
52
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
5.2.1.2. Node distance 2.5 m
L
Truss
2,5
m
h
Truss
2,17
m
Longitud Total
Truss (m)
qmax kN/m
(ELS)
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
10
42,65 66,64 Tensor E 1,5-2,2 533,10 8,33 246,23 213,24
12,5
31,76 49,62 Tensor E 1,5-2,2 620,31 6,20 286,51 198,50
15
24,21 37,82 Tensor E 1,5-2,2 680,81 4,73 314,45 181,55
17,5
18,90 29,52 Tensor E 1,5-2,2 723,35 3,69 334,10 165,34
20 15,08 23,56 Tensor E 1,5-2,2 753,92 2,94 348,22 150,78
22,5 12,27 19,17 Tensor E 1,5-2,2 776,42 2,40 358,61 138,03
25 9,98 15,59 Tensor E 1,5-2,2 779,42 1,95 360,00 124,71
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
L
Truss
2,5
m
h
Truss
2,17
m
Longitud Total
Truss (m)
qmax * kN/m
(ELS)
Pmax kN
(ELS
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
10 35,63 44,54 55,68 Tensor E 1,5-2,2 445,43 10,47 205,74 178,17
12,5 27,70 34,62 43,28 Tensor E 1,5-2,2 541,01 8,14 249,88 173,12
15 21,77 27,22 34,02 Tensor E 1,5-2,2 612,40 6,40 282,85 163,31
17,5 17,38 21,72 27,16 Tensor E 1,5-2,2 665,33 5,11 307,30 152,07
20 14,10 17,62 22,03 Tensor E 1,5-2,2 704,87 4,14 325,57 140,97
22,5 11,61 14,51 18,14 Tensor E 1,5-2,2 734,81 3,41 339,39 130,63
25 9,70 12,13 15,16 Tensor E 1,5-2,2 757,84 2,85 350,03 121,25
Longitud Total
Truss (m)
qmax * kN/m
(ELS)
Pmax kN
(ELS
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
10 62,35 77,94 69,28 Tensor E 1,5-2,2 779,42 0,00 360,00 350,74
12,5 39,91 49,88 45,35 Tensor E 1,5-2,2 779,42 0,00 360,00 274,36
15 27,71 34,64 31,98 Tensor E 1,5-2,2 779,42 0,00 360,00 225,17
17,5 20,36 25,45 23,75 Tensor E 1,5-2,2 779,42 0,00 360,00 190,88
20 15,59 19,49 18,34 Tensor E 1,5-2,2 779,42 0,00 360,00 165,63
22,5 12,32 15,40 14,59 Tensor E 1,5-2,2 779,42 0,00 360,00 146,26
25 9,98 12,47 11,88 Tensor E 1,5-2,2 779,42 0,00 360,00 130,94
* Valores orientativos (referencia para comparar)
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
Page 53
Construcción
ConstrucciónConstrucción
Construcción
53
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
5.2.1.3. Node distance 2m
L
Truss
2
m
h
Truss
1,73
m
Longitud Total
Truss (m)
qmax kN/m
(ELS)
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
8 59,78 74,72 Tensor E 1-1,5 478,24 7,47 276,11 239,12
10 43,78 54,73 Tensor E 1-1,5 547,26 5,47 315,96 218,90
12
32,99 41,24 Tensor E 1-1,5 593,81 4,12 342,84 197,94
14
25,45 31,81 Tensor E 1-1,5 623,54 3,18 360,00 178,15
16
19,49 24,36 Tensor E 1-1,5 623,54 2,44 360,00 155,88
18
15,40 19,25 Tensor E 1-1,5 623,54 1,92 360,00 138,56
20
12,47 15,59 Tensor E 1-1,5 623,54 1,56 360,00 124,71
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
L
Truss
2
m
h
Truss
1,73
m
Longitud Total
Truss (m)
qmax * kN/m
(ELS)
Pmax kN
(ELS
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
8
50,81 50,81 63,51 Tensor E 1-1,5 406,47 9,55 234,68 203,24
10 38,77 38,77 48,46 Tensor E 1-1,5 484,59 7,29 279,78 193,84
12 30,06 30,06 37,58 Tensor E 1-1,5 541,09 5,65 312,40 180,36
14
23,75 23,75 29,69 Tensor E 1-1,5 582,00 4,47 336,02 166,28
16 19,13 19,13 23,91 Tensor E 1-1,5 612,03 3,60 353,36 153,01
18
15,40 15,40 19,25 Tensor E 1-1,5 623,54 2,89 360,00 138,56
20 12,47 12,47 15,59 Tensor E 1-1,5 623,54 2,34 360,00 124,71
Longitud Total
Truss (m)
qmax * kN/m
(ELS)
Pmax kN
(ELS
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
8 77,94 77,94 69,28 Tensor E 1-1,5 623,54 0,00 360,00 350,74
10
49,88 49,88 45,35 Tensor E 1-1,5 623,54 0,00 360,00 274,36
12
34,64 34,64 31,98 Tensor E 1-1,5 623,54 0,00 360,00 225,17
14 25,45 25,45 23,75 Tensor E 1-1,5 623,54 0,00 360,00 190,88
16
19,49 19,49 18,34 Tensor E 1-1,5 623,54 0,00 360,00 165,63
18 15,40 15,40 14,59 Tensor E 1-1,5 623,54 0,00 360,00 146,26
20 12,47 12,47 11,88 Tensor E 1-1,5 623,54 0,00 360,00 130,94
* Valores orientativos (referencia para comparar)
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
Page 54
Construcción
ConstrucciónConstrucción
Construcción
54
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
5.2.1.4. Node distance 1.5m
L
Truss
1,5
m
h
Truss
1,30
m
Longitud Total
Truss (m)
qmax kN/m
(ELS)
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
6
90,25 84,60 OTRA OPCION 406,10 6,35 312,62 270,74
7,5 64,68 60,64 Tensor E 1-1,05 454,81 4,55 350,11 242,57
9
46,19 43,30 Tensor E 1-1,05 467,65 3,25 360,00 207,85
10,5
33,93 31,81 Tensor E 1-1,05 467,65 2,39 360,00 178,15
12 25,98 24,36 Tensor E 1-1,05 467,65 1,83 360,00 155,88
13,5
20,53 19,25 Tensor E 1-1,05 467,65 1,44 360,00 138,56
15
16,63 15,59 Tensor E 1-1,05 467,65 1,17 360,00 124,71
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
L
Truss
1,5
m
h
Truss
1,30
m
Longitud Total
Truss (m)
qmax * kN/m
(ELS)
Pmax kN
(ELS
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
6 78,48 58,86 73,57 Tensor E 1-1,05 353,15 8,30 271,86 235,44
7,5 58,41 43,81 54,76 Tensor E 1-1,05 410,68 6,18 316,14 219,03
9
44,50 33,37 41,72 Tensor E 1-1,05 450,54 4,71 346,83 200,24
10,5
33,93 25,45 31,81 Tensor E 1-1,05 467,65 3,59 360,00 178,15
12 25,98 19,49 24,36 Tensor E 1-1,05 467,65 2,75 360,00 155,88
13,5 20,53 15,40 19,25 Tensor E 1-1,05 467,65 2,17 360,00 138,56
15
16,63 12,47 15,59 Tensor E 1-1,05 467,65 1,76 360,00 124,71
Longitud Total
Truss (m)
qmax * kN/m
(ELS)
Pmax kN
(ELS
NTensor max
kN (ELS)
Tensor a utilizar
MCercha max
kNm (ELS)
Mmax Riostra
kNm (ELS)
Axil Max kN
(ELS)
R Apoyos kN
(ELS)
6 103,92 77,94 69,28 Tensor E 1-1,05 467,65 0,00 360,00 350,74
7,5
66,51 49,88 45,35 Tensor E 1-1,05 467,65 0,00 360,00 274,36
9
46,19 34,64 31,98 Tensor E 1-1,05 467,65 0,00 360,00 225,17
10,5 33,93 25,45 23,75 Tensor E 1-1,05 467,65 0,00 360,00 190,88
12 25,98 19,49 18,34 Tensor E 1-1,05 467,65 0,00 360,00 165,63
13,5
20,53 15,40 14,59 Tensor E 1-1,05 467,65 0,00 360,00 146,26
15
16,63 12,47 11,88 Tensor E 1-1,05 467,65 0,00 360,00 130,94
* Valores orientativos (referencia para comparar)
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
Page 55
Construcción
ConstrucciónConstrucción
Construcción
55
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
6.
6.6.
6. TERMS AND CONDITIONS OF USE
TERMS AND CONDITIONS OF USETERMS AND CONDITIONS OF USE
TERMS AND CONDITIONS OF USE
6.1.
6.1.6.1.
6.1. SAFE OPERATING GUIDELINES
SAFE OPERATING GUIDELINES SAFE OPERATING GUIDELINES
SAFE OPERATING GUIDELINES
6.1.1. General guidelines
General guidelinesGeneral guidelines
General guidelines
It is recommended to strictly follow the
instructions of the project plan, the health and
safety plan, as well as any further technical
and/or safety rules which might apply to the
project.
Works are carried out by qualified personnel
only, and under the supervision of a competent
person.
Instructions of use for the employed equipment
must be followed. Consult operating manuals of
the manufacturer or distributor.
Only statutory auxiliary means and the
corresponding protection equipment, preferably
collective protection equipment are employed.
Personal protective equipment (PPE) should
comprise at least safety helmet, safety footwear,
protective gloves and tool holder belt. Whenever
necessary use further PPE, such as reflective
jackets, anti-fall harness with lifeline, goggles,
breathing masks, earmuffs, etc.
Avoid heavy impacts on working platform or
plywood. It is strictly forbidden to jump on
platforms or plywood, to abruptly unload
material or letting it fall from height onto the
platforms.
If the building site is located nearby high voltage
power lines, it is recommended to work without
power supply. If this is not possible, the
appropriate measures according to the respective
reference standard should be taken.
Under adverse weather conditions, works on the
building site should stop.
Under heavy wind conditions, remove materials
and other objects from the platforms, and check
the stability of all ties, meshes, platform
anchorages, etc. before and afterwards.
Before starting the stripping/dismantling
procedure, check that all structural components
(e.g. ties) are in place. If not, revise the assembly
before proceeding with stripping/dismantling.
Furthermore, check that no loose material
remains on the structure, e.g. on working
platforms, in danger of falling from it, and
striking persons below.
The following measures must be taken to restrict
access to the structure during erection and
dismantling or whenever the structure is not in
correct working conditions (e.g. missing collective
protection): signposting, fencing, closing or
demarcation with straps, barriers or meshes of
the working area and third-party passageways.
Employees and any third party accessing a
structure without collective protection yet in
place, must wear all indicated PPE to prevent falls
from height or to be protected from falling
objects.
The purchaser or lessee of the structure shall
instruct its employees on all necessary guidelines
for the safe operating of the structure.
Any alterations of the structure must be executed
under the supervision of a competent person and
must comply with instructions in the operating
manuals of the manufacturer or distributor.
The purchaser or lessee shall conduct periodic
checks of the assembly to verify the correct
installation of critical structural elements and to
identify the potential withdrawal of parts or the
alteration of the structure as such by employees
or a third party.
Page 56
Construcción
ConstrucciónConstrucción
Construcción
56
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
6.1.2. Guidelines for
Guidelines for Guidelines for
Guidelines for structures
structuresstructures
structures
6.1.2.1. Structure assembly
Mark and bound an area for the assembly so that
anyone outside the assembly will enter the area.
Ensure the correct fastening of bolts and nuts
between different elements, and the correct
positioning and tightening of push-pull props.
Ensure the fastening of ties, nuts, plate nuts, and
lots anchors and in general the correct anchorage
of those additional items to be tied to the
ground.
Ensure the correct anchorage of the previous set,
before placing the next.
Do not leave any part half-assembled or half-
dismantled.
Ensure ground resistance to withstand the loads,
in terms of use, to which it will be subject, and
weather conditions, taking the necessary
measures (surface cleaning, foundation, …).
In the event that loads are important, make a
geotechnical report and dimension the necessary
foundation by the contractor.
When special foundations are needed, make a
foundation project with drawings and
calculations.
Ensure structure stability, making the remarked
anchors according to the project or/and standard
configurations.
If any product is spilled on the platforms, it will
be cleaned immediately.
Do not accumulate material on the platforms,
only have the necessary equipment at all times.
6.1.2.2. Dismantling of structures
Inspect the condition of the structure before
dismantling, in order to check if any items or
anchor is missing.
Ensure that there are no loose elements on top
of the structure if the dismantling is done by
means of crane.
Ensure that there are no workers in the vertical of
the removed gang or nearby.
Take special care to ensure structure stability
when dismantling process.
Do not accumulate material on the platforms
while dismantling, it must be lowered while
dismantling process is making.
6.1.3. Guidelines for
Guidelines for Guidelines for
Guidelines for structures
structuresstructures
structures
6.1.3.1. Formwork
Place some sort of support to store or move the
formwork panels which prevent their damage
and ease the building site order, the panel
cleaning and the transport to their area of
operation.
Ensure the fastening of plate nuts, and the
correct positioning and anchorage of push-pull
props to the ground.
Ensure the correct anchorage of the previous
formwork set, before placing the next.
Do not leave any part half-assembled or half-
dismantled.
It is forbidden to climb on formwork except in
extraordinary cases duly studied and with
appropriate protection systems in place.
Before concrete pouring, make sure the
formwork surfaces are clean.
Clean panels after each use. Wire brushes are not
suitable for cleaning as they are damaging the
phenolic film of the plywood.
It is important to state that the phenolic coating
rarely suffers from the chemical and abrasive
action of the concrete. But where it is already
damaged, e.g. at holes and deteriorated areas, it
Page 57
Construcción
ConstrucciónConstrucción
Construcción
57
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
must be thoroughly sealed to prevent any further
damage to the plywood.
Any cut edge of the plywood should be sealed as
soon as possible, because cut edges soak up
water from the concrete and swell, thus
increasing in thickness.
In general, it is not recommended to use nails or
screws on the plywood.
For storage, the panels should be stacked one on
top of the other, placing wood runners between
them. Use some sort of support to separate them
from the ground, and provide shelter. Prolonged
sun and rain exposure damages the panels.
6.1.3.2. Release agent
Release agent helps separating the formwork
from the concrete, and thus increases the
number of uses and the life span of the panel in
general.
It plays an important role for the quality of the
concrete finishing because it prevents holes from
air bubbles on the concrete surface and provides
a uniform colour.
Apply the release agent uniformly and in thin
layers onto the panel, bearing in mind at all times
the instructions for correct use.
Thoroughly clean the panel surface before
applying the release agent on it.
Clean the metal frame and the panel off the
release agent after every 4 to 5 uses.
6.1.3.3. Concrete placement and compaction
Comply with the maximum pressures according
to the instructions of the respective formwork
system.
Continuously check the state of the formwork
during concrete casting. Stop further casting in
case of any incident.
Place the concrete in uniform layers of 30 to 45
cm.
For vertical concrete placement, cast the concrete
from the least height above the formwork
possible. Do never exceed 2 m height unless a
pipe or tube or any similar accessory is used to
channel the concrete. Deposit the concrete as
near as possible to the formwork base, centring
on one point without casting directly against the
formwork.
When casting with bucket, take special care of
not hitting the formwork, and of complying with
the maximum load-bearing capacity of the crane.
Avoid concrete splashes on the plywood as these
will reflect on the finished surface.
Use the appropriate method for concrete
consolidation and compaction depending on the
concrete consistency and its workability.
The preferred consolidation and compaction
method for wet cast-in-place concrete are poker
vibrators. Use external vibrators only when the
concrete cannot be accessed with poker vibrators
and for parts moulded already in the workshop.
External vibration requires a specific analysis.
Completely immerse the poker 10 to 15 cm into
the concrete, and put it into each area of
concrete, only once. When concrete is poured in
layers, place the vibrator into the previous layer
to meld the two layers together.
Never allow the vibrator to touch the formwork
to prevent exceeding the considered loads.
Immerse vertically or slightly inclined and quickly,
but withdraw slowly.
6.1.3.4. Concrete curing and formwork stripping
Check that curing is sufficiently advanced for
stripping without causing spalling at the concrete
surface which destroys the finishing and can
affect the strength and durability of the concrete.
Page 58
Construcción
ConstrucciónConstrucción
Construcción
58
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
Increase the curing time of the concrete when
facing fast drying and shrinkage due to
evaporation from wind or low temperatures.
The time span between casting and stripping
shall be the same for all parts of the concrete
structure. This is justified when a high finishing
quality is aimed for because the tone of the
concrete surface depends on how long the
concrete surface is isolated from the outside.
Ensure the absence of unauthorised people in the
vicinity where stripping takes place.
Once stripping is finished, place the formwork on
a sort of support and proceed with its cleaning
and dismantling, if it is not going to be used for
further casts.
6.2.
6.2.6.2.
6.2. TRANSPORT, HANDLING AND
TRANSPORT, HANDLING AND TRANSPORT, HANDLING AND
TRANSPORT, HANDLING AND
STORAGE
STORAGESTORAGE
STORAGE
6.2.1. General guidelines
General guidelinesGeneral guidelines
General guidelines
Get informed about hazards on the building site
and preventive measures to avoid those.
Obey the instructions of the person-in-charge at
the workplace.
Ensure adequate communication between the
employees working together.
Use work equipment only when authorised,
trained and provided with all required
information to conduct it.
Maintain minimum distances to mobile work
equipment (forklifts, lorries, cranes, other
construction machinery) and to areas with the
risk of falling objects.
Do not stand, walk, or work under suspended
loads, nor under the trajectory or in the vicinity of
these loads.
Avoid the parts suffering blows and crushing
during transport, handling and storage.
The material is packed for transport in
appropriate containers such as wood or steel
pallets, boxes, or strapped in bundles with stable
base.
Strap the bundles sufficiently stable to prevent
them from moving and getting damaged. If
necessary, protect the items with some sort of
buffer.
Cut the metal strap, standing on the side, using
gloves and goggles to prevent getting cut by the
bouncing strap or caught in the strap.
6.2.2. Transport
TransportTransport
Transport
Ensure the stable loading of the material,
complying with the instructions of the driver
(equilibrated distribution on the lorry bed,
fastening of auxiliary items, etc.).
Keep your distance when opening the containers
after transport to prevent injuries from falling
objects.
6.2.3. Handling
HandlingHandling
Handling
6.2.3.1. Manual handling of loads
Some ergonomic principles to be followed are listed
below:
Do not make any sudden jerky movements.
Before lifting the load, examine it to detect any
sharp corners, dirt, etc. and decide according to
its shape, weight and volume for the best way to
get a secure grip of the load.
Lift, separating the feet at shoulder distance,
duck, bending the knees, never the back.
Do not attempt to lift alone, any load that is too
heavy, too large, or awkward. Use a mechanical
lifting device or get a helping hand from co-
workers.
Page 59
Construcción
ConstrucciónConstrucción
Construcción
59
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
6.2.3.2. Mechanical handling of loads
Only statutory mechanical lifting devices,
appropriate for the operation are allowed for
use.
Check the condition of the lifting gear such as
slings or cables before each use and report any
defects.
Place lifting accessories and step back to a secure
distance from the load and other materials which
could get affected.
Comply with all instructions given by the team
chef who is specifically trained for this.
Cause no sudden acceleration or deceleration of
the moving load.
When conducting difficult or dangerous lifting
operations, or in the case that the crane operator
has no obstruction free visual control of the
entire trajectory of the load, the crane operations
are directed by a banksman who is in constant
communication with the crane operator by
means of a previously agreed sign code.
If necessary, use tag lines to control the load
from distance. Keep hands clear of suspended
load if hands could get caught between the load
and another object. Swinging and/or unforeseen
movements with the load can cause serious
accidents.
6.2.4. Storage
StorageStorage
Storage
Proper storage of the parts is fundamental to
keep them in good working condition.
Wherever possible, store the material in a place
protected from atmospheric impact to avoid
wear.
It is recommended to place parts of the same
type and dimensions in its respective container
(boxes, steel pallets, etc.).
Ensure the stability of any piles, bearing in mind
the following aspects:
- Load-bearing capacity of the ground
- Varying ground levels
- Levelling of the packages
- Package or container support
- Package stability
- State of the strap
- State and capacity of the containers used
- Do not stack full containers on top of empty
or half-empty containers
- External conditions (wind, risk of another
object hitting the pile, etc.)
6.3.
6.3.6.3.
6.3. INSPECTION AND MAINTENANCE
INSPECTION AND MAINTENANCEINSPECTION AND MAINTENANCE
INSPECTION AND MAINTENANCE
6.3.1. General guidelines
General guidelinesGeneral guidelines
General guidelines
ULMA is responsible for the delivery of the
products, for sale or rent, in good working
condition.
From the moment of delivery, the responsibility
for correct use, inspection and product
maintenance passes on to the purchaser or
lessee. All damaged and broken parts, parts with
missing components, i.e. all parts in no proper
working condition must be removed from
service.
For use, inspection and maintenance of the
product, special attention should be paid to the
following points:
- Items aimed to ensure people´s safety
- Items made of aluminium, as they are more
vulnerable to damages of the welded joints
and deformation
Page 60
Construcción
ConstrucciónConstrucción
Construcción
60
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
6.3.2. Inspection instructions of
Inspection instructions of Inspection instructions of
Inspection instructions of elements
elementselements
elements appliances
appliances appliances
appliances
with CE marking of ULMA Construcción
with CE marking of ULMA Construcciónwith CE marking of ULMA Construcción
with CE marking of ULMA Construcción
Before each use, the condition of element appliances
with CE marking must be checked. In case that it
does not fulfil all defined requirements, it must be
removed from service.
For more information, consult ULMA Construcción.
6.3.3. Inspection instructions with CE marking of
Inspection instructions with CE marking of Inspection instructions with CE marking of
Inspection instructions with CE marking of
equipment marketed by ULMA Construcción
equipment marketed by ULMA Construcciónequipment marketed by ULMA Construcción
equipment marketed by ULMA Construcción
Equipment with CE marking marketed by ULMA
Constucción is checked following the instructions
stipulated in the User´s Guide of the respective product.
Page 61
Construcción
ConstrucciónConstrucción
Construcción
61
MK
MK MK
MK STRUCTURE
STRUCTURESTRUCTURE
STRUCTURE
7.
7.7.
7. LLLLEGAL REFERENCES
EGAL REFERENCESEGAL REFERENCES
EGAL REFERENCES
Council Directive 89/391/EEC
Council Directive 89/391/EECCouncil Directive 89/391/EEC
Council Directive 89/391/EEC of 12 June 1989 on the introduction of measures to encourage improvements in
the safety and health of workers at work.
Council Directive
Council Directive Council Directive
Council Directive 89/654/EEC
89/654/EEC89/654/EEC
89/654/EEC of 30 November 1989 concerning the minimum safety and health requirements
for the workplace.
Council Directive 89/656/EEC
Council Directive 89/656/EECCouncil Directive 89/656/EEC
Council Directive 89/656/EEC of 30 November 1989 on the minimum health and safety requirements for the
use by workers of personal protective equipment at the workplace.
Council Directive 90/269/EEC
Council Directive 90/269/EECCouncil Directive 90/269/EEC
Council Directive 90/269/EEC of 29 May 1990 on the minimum health and safety requirements for the manual
handling of loads where there is a risk particularly of back injury to workers.
Council Directive 92/57/EEC
Council Directive 92/57/EECCouncil Directive 92/57/EEC
Council Directive 92/57/EEC of 24 June 1992 on the implementation of minimum safety and health
requirements at temporary or mobile construction sites.
Council Directive 92/58/EEC
Council Directive 92/58/EECCouncil Directive 92/58/EEC
Council Directive 92/58/EEC of 24 June 1992 on the minimum requirements for the provision of safety and/or
health signs at work.
Council Directive 89/655/EEC
Council Directive 89/655/EEC Council Directive 89/655/EEC
Council Directive 89/655/EEC ---- Council Directive 95/63/EEC
Council Directive 95/63/EEC Council Directive 95/63/EEC
Council Directive 95/63/EEC ---- Directive 2001/45/EC
Directive 2001/45/ECDirective 2001/45/EC
Directive 2001/45/EC of the European Parliament
and of the Council of 27 June 2001 amending Council Directive 89/655/EEC concerning the minimum safety
and health requirements for the use of work equipment by workers at work.
Directive 2002/44/EC
Directive 2002/44/ECDirective 2002/44/EC
Directive 2002/44/EC of the European Parliament and of the Council of 25 June 2002 on the minimum health
and safety requirements regarding the exposure of workers to the risks arising from physical agents (vibration).
Directive 2003/10/EC
Directive 2003/10/ECDirective 2003/10/EC
Directive 2003/10/EC of the European Parliament and of the Council of 6 February 2003 on the minimum
health and safety requirements regarding the exposure of workers to the risks arising from physical agents
(noise).
Directive 2006/42/EC
Directive 2006/42/ECDirective 2006/42/EC
Directive 2006/42/EC of the European Parliament and of the Council of 17 May 2006 on machinery, and
amending Directive 95/16/EC (recast).
Standards:
EN 12812:2008 Falsework. Performance requirements and general design
EN 12811-1 Temporary works equipment. Part 1: Scaffolds. Performance requirements and general design
EN 12811-2 Temporary works equipment. Part 2: Information on materials
EN 12811-3 Temporary works equipment. Part 3: Load testing
EN 13374 Temporary edge protection systems. Product specifications, test methods
EN 74-1 Couplers, spigot pins and baseplates for use in falsework and scaffolds. Part 1: Couplers for tubes.
Requirements and test procedures
EN 74-2_Couplers, spigot pins and baseplates for use in falsework and scaffolds. Part 2: Special couplers. Requirements and test procedures
EN 74-3_Couplers, spigot pins and baseplates for use in falsework and scaffolds. Part 3: Plain base plates and spigot pins. Requirements and test procedures.
Page 62
PRODUCTION PLANT AND HEADQUARTERS
ULMA C y E, S. Coop. Ps. Otadui, 3 - P.O. Box 13
20560 OÑATI (Guipúzcoa) SPAIN Phone: + 34 943 034900 Fax: + 34 943 034920
ULMA Construcción around the world
www.ulma-c.com
Construcción
EUROPE
Germany
ULMA Betonschalungen und Gerüste GmbH
RÖDERMARK www.ulma-c.de
Nordwest Branch
NEUSS
Südwest Branch
GÖPPINGEN
France
ULMA, S.A.R.L.
BONDOUFLE www.ulma-c.fr
IDF Branch
BONDOUFLE
Eguilles Branch
EGUILLES
Nantes Branch
SAINT HERBLAIN
Lille Branch
LA CHAPELLE D’ARMENTIÈRES
Lescar Branch
LESCAR
Evénements Branch
LONS
Tarnos Branch
TARNOS
Italy
ALPI, S.P.A.
MONGUELFO (BZ) www.alpionline.net
Kazakhstan
ULMA Kazakhstan
ASTANA www.ulma-c.kz
Poland
ULMA Construccion Polska S.A.
WARSAW www.ulma-c.pl
WSCHÓD REGION WARSZAWA Branch
WARSZAWA Office OLSZTYN Office
LUBLIN Branch
LUBLIN Office BIAŁYSTOK Office
ZACHÓD REGION POZNAŃ Branch
POZNAŃ Office BYDGOSZCZ Office
GDAŃSK Branch
GDAŃSK Office SZCZECIN Office
WROCŁAW Branch
WROCŁAW Office NOWA SÓL Office
POŁUDNIE REGION JAWORZNO Branch
JAWORZNO Office ŁÓDŹ Office
Portugal
ULMA Portugal Lda.
São João da Talha - LISBON www.ulma-c.pt
Porto Branch
Vila Nova de Gaia - PORTO
Czech Republic
ULMA Construcción CZ, s.r.o.
BENÁTKY NAD JIZEROU www.ulma-c.cz
Slovac Republic
ULMA Construccion SK, s.r.o.
BRATISLAVA www.ulma-c.sk
Romania
ULMA Cofraje s.r.l.
BUCHAREST www.ulma-c.ro
Ukraine
ULMA Formwork Ukraine Ltd.
KIEV www.ulma-c.com
Page 63
Construcción
ASIA-AFRICA
P.R. China
ULMA Formworks China R.O.
SHANGHAI www.ulma-c.cn
UAE
ULMA Formworks UAE L.L.C.
DUBAI www.ulma-c.ae
India
ULMA FORMWORK SYSTEMS INDIA PVT. LTD.
GURGAON - Haryana www.ulma-c.in
Singapore
ULMA Formwork Singapore PTE. LTD.
SINGAPUR www.ulma-c.sg
Spain
ULMA C y E, S. Coop.
www.ulma-c.es
ANDALUCÍA Branch
ALCALÁ DE GUADAIRA (Sevilla) PELIGROS (Granada)
ARAGÓN Branch
PEDROLA (Zaragoza)
CANARIAS Branch
INGENIO (Las Palmas) GÜIMAR (Tenerife)
CASTILLA Branch
CIGALES (Valladolid) GIJÓN (Asturias)
CATALUÑA Branch
POLINYA (Barcelona) LLUCMAJOR (Illes Balears)
CENTRO Branch
COBEÑA (Madrid) AJOFRÍN (Toledo)
GALICIA Branch
CAMBRE (La Coruña) MOS (Pontevedra)
NORTE Branch
LEGUTIANO (Álava) DERIO (Vizcaya)
LEVANTE Branch
NÁQUERA (Valencia) MOLINA DE SEGURA (Murcia)
USA
ULMA Form Works, Inc.
Hawthorne - NEW JERSEY www.ulma-c.us
West Branch (Phoenix)
Gilbert - ARIZONA
Mid-Atlantic Branch (Baltimore)
Jessup - MARYLAND
Mexico
ULMA Cimbras y Andamios de México S.A. de C.V.
TLALNEPANTLA (Mexico State) www.ulma-c.com.mx
Peru
ULMA Encofrados Perú, S.A.
LIMA www.ulma-c.com.pe
Norte Branch
Chiclayo - LAMBAYEQUE
AMERICA
Argentina
ULMA Andamios y Encofrados Argentina, S.A.
CAPITAL FEDERAL www.ulma-c.com.ar
Brazil
ULMA Brasil - Fôrmas e Escoramentos Ltda.
Itapevi - SP www.ulma-c.com.br
Rio de Janeiro Branch
Ramos - Rio de Janeiro - RJ
Centro-Oeste Branch
Gama - Brasilia DF
Salvador Branch
Centro - Lauro de Freitas - BA
Sul Branch
Navegantes - Poa RS
Canada
ULMA Construction Systems Canada Inc.
Bolton - ONTARIO www.ulma-c.ca
Chile
ULMA Chile - Andamios y Moldajes, S.A.
SANTIAGO www.ulma-c.cl
Norte Branch
ANTOFAGASTA
Sur Branch
CONCEPCIÓN
Loading...