Congratulations! on your purchase of the UPSPro ™ outdoor
backup power system. Please take a moment to review this Qwik
Install Guide before assembly or battery installation.
DANGER! Avoid Powerlines!
You Can Be Killed!
When following the instructions in this guide take extreme care
to avoid contact with overhead power lines, lights and power circuits.
Contact with power lines, lights or power circuits may be fatal. We recommend to install no closer than 20 feet to any power lines.
Safety: For your own protection, follow these safety rules.
▫ Perform as many functions as possible on the ground
▫ Do not attempt to install on a rainy, windy or snowy day or if
there is ice or snow accumulation at the install site or if the
site is wet.
▫ Make sure there are no people, pets, etc. below when you are
working on a roof or ladder.
Recommended Tools: Phillips Scr ewdriver, 13mm and
10mm Open End Wrench, 8mm nut driver, Flat Blade Screwdriv-
Please help preserve the environment and return
used batteries to an authorized depot
Qwik Install
STEP 1: Add Grounding Wire Between Door and Enclosure: Remove
plastic covers on copper studs
on inside of door and inside of
enclosure. Add jumper wire between 2 copper studs and use
copper washers and nuts to secure.
STEP 2: Add wire feedthrus into
the bottom connector plate. Attach the connector plate to the bottom of
the enclosure using self tapping screws provided.
STEP 3:Install hole plug in drain hole in bottom right corner of the en-
closure.
STEP 4: Mount the DIN rail to the door using screws provided. Mount
any extra equipment to the orange backplate and secure the backplate
in the enclosure. Note: The DIN rail can also be mounted to the orange
backplate or sides of enclosure if desired.
STEP 5:If pole
mounting the enclosure, assemble
2
the pole mount kit to the back of
the enclosure and mount the enclosure to a pole using the 6 hose
clamps provided. The enclosure
can also be wall mounted using
the 4 holes in the back of the enclosure.
STEP 6: Insert the battery plat-
form in the bottom of the enclosure. The battery platform has cutouts so
wires can be routed under the battery as needed.
STEP 7: Attach the
green DIN Rail adapters to the charge con-
troller and 5 port POE switch using the
screws provided. Clip the controller and POE
switch to the DIN rail.
STEP 8: Connect a two conductor wire be-
tween the back green connector on the con-
3
troller to the back green connector on the 5 port switch. You can use
the included cable with terminal connectors by cutting off terminal connectors and then cutting and stripping cable to proper length. Observe
proper polarity for all connections.
Note: There are two +V and two V- (GND) connections on the controller
and the switch. You can use either connection. The FG connection is
for frame ground or earth ground. If your grounding scheme requires it
you can connect the FG to the enclosure ground point near the bottom
of the door. The FG is common to the RJ45 shield.
TP-SCPOE Controller TP POE Switch
STEP 9: Install the b atter ies in the enclosure. Batteries are 12V
batteries and need to be connected in series for 24VDC output.
24V two batteries and 24V four batteries configurations are shown here:
4
STEP 10: If batteries are installed
on their side make
sure to apply an insulator to the top of the
battery terminal to prevent the battery terminals from shorting to the metal enclosure in case the battery shifts inside the enclosure
during an earthquake.
STEP 11: Disconnect the green f ront connector
from the controller. Connect the battery cables to the battery. Be sure to
observe polarity. Black wire connects to battery negative terminal and
BAT(-) terminal on the controller. After connecting the batteries, plug
the green connector into the controller. When a fully charged battery is
connected, the Green LOA LED should light on controller and the LED’s
on the 5 port switch should power up.
Note: The
green con-
nector
5
on the controller will become unplugged due to vibration and the weight
of the cables. Be sure to add a zip tie or other method to hold the ca-
bles and relieve the cable weight from the connector.
STEP 12: If you h ave a solar panel, route the solar panel cable
from the solar panel thru one of the feedthrus on the bottom of the enclosure and install to the SOL input of the controller. Be sure to connect
in the proper polarity, red wire to + and black wire to –. Make sure any
outdoor connections are waterproofed.
STEP 13: Tighten all wire feedth rus. If they don ’t tighten on a small
diameter wire, you can wrap some electrical tape around the wire in the
seal area to increase its diameter and make a better seal. The enclosure needs some small amount of venting so be sure NOT to seal all
holes and feedthrus with silicon.
STEP 14: Make sure lid gasket is clean and free from any particles, then carefully close the cover, making sure that wires are clear of
the seam and hinge area. Use the special key to close the two cover
locks.
TECH CORNER
Additional Information you may find useful
1. CONTROLLER: The controller turns off power to the load at 22V and
reconnects when the battery reaches 24V. This protects battery from
overdischarge and increases battery life and performance.
Controller LEDS:
POE = ON POE input detects current from POE source. If POE led is
flashing it means the power source is too weak for the POE input. Find
a power source with more capacity.
SOL = ON Solar input detects current from solar panel.
CHA = ON Batteries are being charged from solar input. If CHA is
flashing it means batteries are fully charged.
LOA = ON Battery voltage is sufficient and load outputs (POE OUT
and auxiliary wire terminal output) are turned on.
REV = ON Battery wires reversed.
Fuse:
The fuse is in line with battery power. If fuse is blown there was some
sort of short in the battery connection and the controller will appear
dead. Replace with 10A fuse.
2.CAPACITY: The UPSPro UPS-ST2424-UBNT is rated at up to 60W
power output. If you exceed this load the system may not function to
expectations.
6
Note: The controller can supply 24V 1A from the POE OUT port and
24V 1.5A from the auxiliary wire terminal port. To utilize the full 60W
you can combine the outputs of both ports. Power on the POE port is
supplied on Ethernet pins 4,5(+) and 7,8(–).
3.VENTING: The enclosure is vented thru the wire feedthrus and vari-
ous hole plugs in the bottom of the enclosure. Don’t make these airtight
with silicon
4.BATTERY MAINTENANCE: The batteries used in the UPSPro sys-
tems don’t require any maintenance. They should last up to 5 years in
normal use. Note: Never store batteries for any length of time in a dis-
charged state or it will kill the battery.
5. BATTERY OVERDISCHARGE: We highly recommend hoo king
all equipment loads to the controller voltage output. This output will disconnect the load if the battery voltage drops below 22V and this will
protect the battery from over-discharge. If batteries get completely discharged because the equipment was connected directly to the battery,
you will reduce the battery life and you will most likely need to supercharge them with a good quality 10A automotive battery charger. Once
they are back to a normal operating range, the integrated charge controller will maintain the charge.
6.WIND TURBINE: A wind turbine can be added to this system at any
time. Wind Turbines are good sources of power, often in times when
the sun isn’t shining, like on stormy days. We like to think of a wind tur-
bine as uptime insurance. Tycon Power Systems offers small wind tur-
bines perfectly suited to augment the UPSPro systems. The TPW-40024 is a 400W 24V wind turbine. To add a wind turbine, it mounts to the
inside diameter of a 41mm ID pole. You will need to mount the controller inside the enclosure and connect the output of the controller to the
batteries. The connection will be in parallel with the existing solar controller connection.
7.OTHER ACCESSORIES: Tycon also o ffers a variety of voltage
conversion products to meet almost any need. Just visit tyconpow-
er.com for more info.
7
Compatible Solar Panel Kits
Tycon Power Systems Solar Panel kits come with High
Performance solar panels, side of pole mounts and outdoor rated connection cabling. Solar panels have a 25 year
output warranty. Pole mounts and panels are designed for
wind loads to 90MPH.
TPSK24-85W—24V 85W Solar Panel,
Pole Mount, Cable
TPSK24-120W—24V 120W Solar Panel,
Pole Mount, Cable
TPSK24-240W—24V 240W Solar Panel,
Pole Mount, Cable
Solar Kits6 Hours Peak Sun 3 Hours Peak Sun
TPSK24-85W 20W continuous 10W continuous
TPSK24-120W 30W continuous 15W continuous
TPSK24-240W 60W continuous 30W continuous
8
Compatible Wind Turbine
TPW-400DT-12/24 400W 12/24V Wind Turbine
Includes controller
Good low wind performance
Self braking in high wind
80MPH survivability
Sealed and maintenance free
9
SPECIFICATIONS
Power Rating
Reserve Power @ 30W Load
Battery Voltage (DC)
Battery Capacity
Battery Type
Battery Life
Controller Type
Overcharge Protection
Over-discharge protection
Over-discharge recovery voltage
Controller Self Consumption
Enclosure Type
Operating Temperature
Valve Regulated Sealed Lead Acid /
2 battery 20 hours
4 battery 40 hours
2 battery 51Ah
4 battery 102Ah
24V Solar/POE Charge Controller
POE and secondary outputs regulated
Max Solar Panel Size 24V 270W
Powder Coat Steel
-30°C to +60°C
Subject to change without notice
60W
24V
GEL
5 Years
28.6V
20V
22V
<0.5W
48V 150W Power Supply
Shielded POE Injector
10
Typical UPSPro-ST2424-UBNT Application
11
Limited Warranty
The UPSPro™ products are supplied with a limited 24 month warranty
which covers material and workmanship defects. This warranty does
not cover the following:
▫Parts requiring replacement due to improper installation, misuse,
poor site conditions, faulty power, etc.
▫ Lightning or weather damage.
▫ Physical damage to the external & internal parts.
▫ Products that have been opened, altered, or defaced.
▫ Water damage for units that were not mounted according to user
manual.
▫Usage other than in accordance with instructions and the normal
intended use.
Tycon Power Systems
14641 S 800 W Suite A
Bluffdale, UT 84065
support@tyconpower.com