Two Brothers Racing ROAD User Manual

Page 1
Two Brothers Racing
M2/M5 ROAD Re-pAck kit
Part # 005-10038
Description
Repack a ll road c anister s every 5 ,00 0 miles. Part # 00 5-10 038 Repack a ll off ro ad canis ters af ter ever y 10 hours of us e. Part # 0051003 8MX
Qty. Description Part Number
1 Packing Material 005-PACKING 16 Marson RIvet 1/8 Grip 005-H_SSBL43S 2 O-Ring 005-7-7 1 #30 Drill Bit 005-9-D30
IMPORTANT - PLEASE READ CAREFULLY
We recommend that this per formance part be installed by a qualied
Read all instructions rst before starting installation. Make sure the motorcycle and exhaust system are completely cool before starting the installation. Also, make sure the bike is secure on a center stand or ideally a service lift during installation. Be sure to save all stock
components for possible use later.
Warranty
Two Bro thers Ra cing produc ts are in tended for c losed cour se compe tition p urposes o nly, and the refore ar e
sold “a s is” with out warra nty. Two Br others R acing speci cally d isclaims an y warrant ies of mer chantabi lity or t ness for a pa rticul ar purpose a nd disclai ms all respo nsibili ty for co nsequent ial and inci dental da mages or
any ot her loss es arising f rom the us e of these pr oducts o r parts .
Installation Instructions
1. Make sure the bike is completely c ool befo re star ting the install ation and is secured to a center stand o r ideall y a serv ice lif t. The n, remove
the muf er asse mbly fro m the bike.
2. Using the provided dri ll bit, c arefull y drill ou t the rivets on the inl et side of the muffler. Separate t he inlet fl ange and inner cor e from the muffler sleeve.
3. Remove all existing pac king material fro m the per forate d core, if yo ur caniste r came wi th a stain less steel wool wr ap aroun d the core l eave this in pla ce.
4. Measure the core and cut n ew packing one inc h longer.
5. Wrap the new pa cking ma terial ar ound the p erfor ated core tightl y and wrap a s much of thi s materi al around t he core as w ill fit into t he sleeve. Use masking tape to se cure it.
6. Insert the newly wrapped p erfor ated core i nto muff ler sleeve. Replace o- ring on inlet flang e and then install inlet flan ge into the sl eeve. Make sure the perfora ted core se ats full y into both i nlet and ou tlet fla nge completely.
7. Use a h ole punc h to align ri vet hole s.
8. Using a rivet tool and the provided stainless steel r ivets, r ivet the in let flange b ack onto th e muffl er end. Make sure all the holes lin e up the sam e way as they did origi nally or your muffler may en d up point ing in a dif ferent direction when installed.
9. Check for proper cani ster/co llector alignme nt and reins tall the caniste r(s) to the motorcycle.
10. Double c heck to ma ke sure that all hardw are is tightened befo re you run
the bike, clean off all nge rprint s and dirt , as any oily residue will etc h the
metal and b ecome s omewha t perma nent when t he system g ets hot. R un
the bike and enj oy. It is n ormal for some white smoke to appe ar the rst
time you st art the bike. This i s packi ng/m anufac turing o il from ins ide the
pipe bu rning off. Che ck for gaps o r leaks . If yo u nd a leak , a lit tle hi gh tempera ture sil icon s ealant should x it . Afte r 50 t o 100 m iles, r echeck all
fasteners for tightness.
Care & Cleaning
Care & Cleaning
Keep system free of di rt and mo isture. S tore in a co ol, dr y place. M ake sure vehicle is comple tely coo l before maintenan ce.
Repack a ll road c anister s every 3 ,00 0 miles . Part # 00 5 -1003 8 Repack a ll off ro ad canis ters af ter ever y 10 hours of us e. Part # 005-100 38 MX
NEVER dyno test you r bike with c arbon  ber or ti tanium c anister s installed - the
intense he at and lac k of cooli ng air can quickl y burn through the c anister m aterial. Two Brothers R acing do es not provide a war ranty for burne d canisters.
Loading...