Two Brothers Racing RMZ450 User Manual

Page 1
2009-2010 Suzuki RMZ450
PARTS LIST
Installation Instructions
1 Juice Box Pro™ 1 USB Cable 1 Top Tune CD-ROM 1 Installation Guide 2 Velcro 1 Alcohol swab 2 Zip ties
THE IGNITION MUST BE TURNED
OFF BEFORE INSTALLATION!
DOWNLOAD THE TOPTUNE SOFTWARE
AND LATEST MAPS FROM OUR
WEBSITE:
PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION
401 S. Grand Ave. Santa Ana, CA 92705
(800) 211-2767 www.twobros.com
Page 2
Selecting the Map Position
The J uice B ox Pro com es loaded w ith up to ten m aps . U s ing a #1 Phillips screw driv e r, turn the m a p select dial to toggle between the loaded m aps . Refer to the map position table below for the maps included in your J uice Box Pro.
Using the RPM R ange Dials
The Low, Mid, and High RPM Dials refer to the RPM range, in thirds, of your vehicle. Each dial allows +/- 10% fuel adjustment on top of what fuel changes are done in the map. W ith the dial facing straight up, there is no additional fuel change. For example, if your vehicle revs to 15,000 RPM:
• the low RPM dial will adjust 0-5000 RPM
• the mid RPM dial will adjust 5001-10000 RPM
• the high RPM dial will adjust 10001-15000 RPM
Using Top Tune
Take your tuning to the nex t level with the Top Tune s oftwar e.
Position 0 Zero map
Position 1 Stock exhaust
Stock air fi lter
Position 2 Two Brothers M2R slip-on exhaust
Stock air fi lter
Position 3 Two Brothers M2R full exhaust
Stock air fi lter
USB Port
High RPM Dial
Mid Dial RPM
Low Dial RPM
Map Select Status Light
(Power to Unit)
09-10 Suzuki RMZ450
09-10 Suzuki RMZ450
09-10 Suzuki RMZ450
I ns t a l li n g t h e Top Tu ne S o ft w a r e 1 Insert the CD provided into your com puter’s cd-rom drive. The launch program
will run automatically. If auto-run is disabled, double-click the My Computer icon then double-click the CD drive icon. Double-click TB R Top Tune.exe to manually start the CD.
2 Click Install Software and follow the on-screen instructions to install the Top
Tune software. The Top Tune software and maps will be stored in C:\Program Files\T BR Top Tune.
3 C lick M a p Databas e. All m a ps w ill autom atically be installed to the C : \Progra m
Files\TBR Top Tune\maps folder.
Loading Additional Maps 1 Connect the US B cable from the computer to the J uice B ox Pro. Verify the cable
is fully seated in the J uice B ox Pro.
2 Run the Top Tune software by double-clicking the program icon installed on your
desktop or on your start menu. 3 Click Open Map File and select a map file. 4 C lick S end M a p. You can send the m a p to a ny of the ten m ap pos itions .
A ltering M aps U s ing Top Tune The values in the map represent a percentage of fuel change over stock. A value of 10 in the map indica tes at that throttle pos ition and R PM r ange the v ehicle w ill be 10% richer than stock. If the value is -10, then it would be 10% leaner than stock. You ha v e the ability to fine tu ne your fuel curve by altering these values . The Top Tune software allows a value of +250 to -100 in each cell.
ITBR001-225 www.twobros.com 2009-2010 Suzuki RMZ450 - 2
Page 3
Figure A Figure BFigure C
1. Remove the seat.
2. Remove the fuel tank.
3. Remove the front number plate.
4. Using the supplied zip ties, secure the Juice Box Pro to the stock ECU as shown in Figure A.
5. Route the wiring harness from the Juice Box Pro between the frame and the fork tube on the right hand side of the bike.
Juice Box Pro
harness
unplug
6. Continue to route the Juice Box Pro harness down the right side of the bike.
7. Route the harness to the inside of the frame and go towards the throttle body as shown in Figure B.
8. Unplug the stock wiring harness from the injector as shown in Figure C.
9. Unplug the stock Throttle Position Sensor (TPS) connector as shown in Figure C.
The TPS connector is a grey 3-pin connector.
unplug
ITBR001-225 www.twobros.com 2009-2010 Suzuki RMZ450 - 3
Page 4
Figure DFigure E
10. Attach the connectors from the Juice Box Pro to the stock injector and the stock wiring harness as shown in Figure D.
11. Attach the Juice Box Pro harness to the stock TPS connectors as shown in Figure E.
12. Using one of the mounting bolts for the ignition coil, attach the ground wire from the Juice Box Pro as shown in Figure F.
The coil is on the right hand side of the bike behind the radiator.
13. Reinstall the front number plate.
14. Reinstall the fuel tank.
15. Reinstall the seat.
Figure F
ground wire
ITBR001-225 www.twobros.com 2009-2010 Suzuki RMZ450 - 4
Loading...