![](/html/47/472d/472d54e3a5c1aee8a504eca75e4f71c922ff8d13a1d605bf8cd18679850a75fe/bg1.png)
TBR
Dealer Display
Part# 015-CF D
3 Pipe Black Cardboard Floor Displ ay
Installation Instructions
1. Open box, remove contents and confirm that all parts
are there and identified.
2. Build base structure.
3. Build main structure by pushing inward at pipe box cut
outs as you set in triangular formation.
4. Lock-in place with the 5 puch pins provided on the back
Push pins - Fold outer tabs inward to make flat. Insert
one push-pin into each hole on the back of the main
structure and through folded tab. Use “RED” pin and
insert into the center of each push-pin hole to snap the
outer tabs back out. This will lock in position. Repeat
for all 5.
![](/html/47/472d/472d54e3a5c1aee8a504eca75e4f71c922ff8d13a1d605bf8cd18679850a75fe/bg2.png)
Installation Instructions
V.A.L.E.
V a r i a b l e a x i s l o c k i n g e x h a u s t
TM
TBR
Dealer Display
Part# 015-CF D
3 Pipe Black Cardboard Floor Displ ay
5. Inset main structure into base and lock bottom
tabs through holes.
6. Stand display upright. Fold and insert base tabs into sides of
main structure.
7. Fold top and insert Two Brothers Racing top sign.
8. Fold shelves down and insert pipe display boxes into shelves.