Twitoplast OPAL EL Installation And Operating Instructions Manual

2
®
EL
NEW
ELECTRICAL OPERATION
(FOR DAMPER)
INSTALLATION AND OPERATING
INSTRUCTIONS
Twitoplast Company thanks you for purchasing the Opal
El –Electrical Operation.The Opal EL device enables
zone/room temperature control, by means of adjusting
the airflow through the damper. The Opal EL device
was designed for optimal use to insure both quick
installation and comfortable & perfect air condition
temperature.
INSTALLATION AND OPERATING
INSTRUCTIONS
1. Stand Alone:
The Opal EL controls one
Damper.
9 Drezner St. Segula Industrial Zone, Petach Tikva 49277, ISRAEL Tel: 972-3-9345888 Fax: 972-3-9042729 e-mail:export@twitoplast.co.il
®
http/www.twitoplast.co.il
®
Containing :
Opal EL – Dimmer.
RJ-11 Cable.
Red & Black ±Cable.
Electrical Motor C508-TW .
Installation & Operating
Instructions.
Please note: 12 VAC Only Transformer
not included.
Can be purchased separately.
1 OPAL EL
2 Transformer 12 vac only
3 C508 Motor
4 RJ-11 cable
5 Motor cable±
WALL
MOUNT
The Opal EL controls one Damper, but has also an affect on the A/C operation it self through the Zone Control System ZC207
System Configurations
2. As an Integral part of ZC-107 system.
1
2
3
5
®
9 Drezner St. Segula Industrial Zone,
Petach Tikva 49277, ISRAEL
Tel: 972-3-9345888 Fax: 972-3-9042729
e-mail:export@twitoplast.co.il
Put back the front panel of the Opal EL to the plastic box. Assemble the front panel of the Opal EL to its base using the screw. put back the round knob.
Take out the wires from the designate place in the plastic box (by cutting the plastic with a knife or drilling)
( Step 6 )
6
8
7
C508-TW Motor
5
Remove the round knob and the screw. fasten the plastic box to the well. (step 1,2,3)
1
Cut Here
4
Entry of the motor damper
3
Plastic Box
2
Entry of the AC 12v
(Step 7 & 8)
Connecting Scheme Stand alone
Connection of the OPAL EL to the Zone control System OPAL ZC-207
Step1:
Connect the RJ-11 Cable from the Opal EL to one of the channels on ZC-207
Step2:
Connect one Black & Red Cable ± from the motor damper to the ZC­207 channel near the RJ­11 (Red wire one+).
Step3:
Remove Black covering from jumpers JP2 and JP3. and add one of them to Jumper J4 (see pic. 4).
Repeat steps 7&8
Repeat step 1&2 (stand alone).
CH1
CH2
CH2CH2
CH2
CH2
CH2
CH2
ZC 207
+
-
Motor
Connect the:
12 v power supply cable from the transformer to the Opal EL. Red & Black ±cable from the Opal EL to the motor (Red one+). (step 4 & 5).
PLEASE NOTE: There are two jumpers JP2 & JP3. Do not Remove the Black Covering.
1.
2.
1
3
Step
Step
Step
Step
Step
Step
Step
Step
Installation of the Opal EL
+
-
Motor
J4
RJ 11
C191
J2 J3
12Vac Transformer
J4
RJ 11
C191
J4
J2 J3
RJ11
Loading...
+ 1 hidden pages