Turbo Air Speeds up the Pace of Innovation
Pizza Prep Table
Refrigerators
Installation and Operation Manual
Please read this manual completely before attempting to install or operate this equipment
Full Stainless Steel Visible Exterior
REFRIGERATORS
TPR-44SD
TPR-67SD
TPR-93SD
www.turboairinc.com
CONTENTS
SPECIFICATIONS
PAGE
............................................................................................
2
SERIAL NUMBER
............................................................................................
2
CUTTING BOARD & BRACKETS Installation Schematic Diagram ................. 3
INSTALLATION OF CASTERS & CASTER BRAKES ..................................... 4
INSTALLATION OF HOOD LID ..................................................................... 4~5
HOW TO CLEAN THE PAN AIR DUCT PANEL............................................... 6
HOW TO OPEN AND CLOSE THE HOOD LID ................................................6
INSTALLATION
CLEANING & CAUTION
BASIC OPERATION
TROUBLESHOOTING
WARRANTY
................................................................................................
..................................................................................
.........................................................................................
...................................................................................
.............................................................................................
7
8
9
10
11~13
SPECIFICATIONS
Pizza Prep Table
MODEL COMP H.P. V/Hz REFRIGERANT AMPS WEIGHT
TPR-44SD
TPR-67SD
TPR-93SD
1/4 115V/60Hz R-134A 6.3A 302lbs
2/3 115V/60Hz R-134A 10.4A 411lbs
2/3 115V/60Hz R-134A 11.0A 577lbs
SERIAL NUMBER
The serial number is located on the rating label which is on the left interior wall.
Please retain the unitʼs serial number for service purpose.
2
CUTTING BOARD & BRACKETS
PART LIST
Installation Schematic Diagram
PART NAMENO
SPECIFICATION
93”67”
67” 18.9” 0.5” 93.5” 18.9” 0.5”
2 CUTTING BOARD BRACKET STAINLESS STEEL 2 2
3 LID BRACKET LEFT STAINLESS STEEL 1 1
4 LID BRACKET CENTER STAINLESS STEEL 1 2
5 LID BRACKET RIGHT STAINLESS STEEL 1 1
QUANTITIES
11DRAOB GNITTUC1
210101*4MWERCS6
* Assemble CUTTING BOARD and BRACKETS as above drawing.
3
INSTALLATION OF CASTERS AND CASTER BRAKES
WASHER
SIDE VIEW OF
HOOD LID
SCREW
HANDLE
1) Screw the caster (in rear side) and the caster brakes (in front side) by using
caster wrench.
2) Use the caster shims to level the cabinet, if necessary, by inserting them to
stems of the casters.
DOOR(L)
CASTER (WITH BRAKE) (2EA)
DOOR(R)
CABINET
CASTER (2EA)
Rotation
INSTALLATION OF HOOD LID
1) HANDLE ASSEMBLY
DOOR(L)
CASTER
(WITH BRAKE) (3EA)
DOOR(R)
CASTER (3EA)
Rotation
DOOR(R)
CABINET
* Assemble the handle with washers and screws as above drawing.
4