Tucker Murphy Pet™ TXI1491 Assembling Instruction

Page 1
Aufbauanleitung/Assembling Instruction/Instruction de montage
Assembling Instruction
Work Steps:
First Step
Please use a stud finder (or other technique) and a pencil. After locating the stud mark the center of the stud, which will hold the product.
Second Step
Third Step
Bring the products in final position and mark the screw-point on the center of the studs. Use a spirit level or have someone eyeball to make sure the holes are levelled.
Fourth Step
Use your drill and the 1/16“ bit to make pilot holes for maximum 2 inch to all markings.
Fifth Step
Mount the metal holder with enclosed screws to the stud and make sure the screws are fastened securely. Mount the small platform with the wooden screws directly to the stud.
Final Step
Connect the large platform and steps with the holders in the wall.
Advice:
Please note the secure assembly and mounting requires one adult person. The holder need to be fixed to the wooden studs at 12 or 16 inch. For drywalls with metal studs, please use 2 inch. metal screws (not included). For connection to rocksheet only, please use drywall anchors and screws with ample load capacity
.
Loading...