Trim-Tex Demarcation User Manual [es, en]

INC.
Demarcation Bead
Installation Instructions
Designed for clean rooms.
Finishing Compound
Create a separation between drywall finish and a different substrate, such as an epoxy floor.
Mesh Tape
Epoxy Floor
LENGTH
2010'DM10
INSTALLATION INSTRUCTIONS (Epoxy Floor Example)
Measure the height you would like to separate your 2 surfaces and the length at which you will need to cut the bead. Cut and dry fit the bead into place. Install the Demarcation Bead with 847 Spray Adhesive and mesh tape. For the strongest bond, spray both the back of the bead and the surface you want the bead attached to. Pour the epoxy floor up to the nose of the Demarcation Bead. Once epoxy floor has dried, mud and sand the other side of the Demarcation bead.
INC.
Instrucciones de Instalación
Del Esquinero de Demarcación
Diseñado para habitaciones mas definidas.
Crea una separación entre un acabado de tabla roca con un sustrato diferente, como, por
Cinta de Malla
ejemplo, piso epóxico.
Perfecto para separaciones rectas de tratamientos de superficie.
Piso Epóxico
Instrucciones de Instalación (Ejemplo de piso epóxico)
Tome la medida que le gustaría separar las dos superficies y la distancia al cual ocuparía cortar el esquinero. Corte y ponga el esquinero en su lugar. Instale el Esquinero de Demarcación con Adhesivo en Aerosol 847 y cinta de malla. Para una mejor adherencia, aplique 847 en el esquinero y en la superficie donde lo quiere aplicar. Agregue el piso epóxico hasta la nariz del Esquinero de Demarcación. Ya que el piso epóxico se haga secado, ponga el compuesto y lije el otro lado del Esquinero de Demarcación.
Compuesto para acabado
LENGTH
2010'DM10
Contact us today! Phone: 800-874-2333 / Fax: 800-644-0216 / www.trim-tex.com
Loading...