TriangleTube Prestige Excellence User Manual Part 1

Page 1
prestige
Water Boiler
Excellence
Part 1 of 2
* I N S T A L L A T I O N A N D M A I N T E N A N C E *
* I N S T A L L A T I O N A N D M A I N T E N A N C E *
NOTICE
WARNING
Revised Date: 06/9/10
Warranty Registration Card must be filled out by the custo mer and mail ed within thi rty (30 ) days of installation in order to gain warranty cov erage.
When receiving the PRESTIGE Excellence unit, an y claims for damage or shortage in sh ip ment must be filed immediately against the transportati on comp any by the consignee.
Leave all documentation received with appliance with owner for future reference.
If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or death.
FOR YOUR SAFETY
Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS
- Do not try to light any appliance
- Do not touch any electrical switch; do not use any phone in your building.
- Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
- If you cannot reach your gas supplier, call the fire department.
Installation and service must be performed by a qualified installer, service agency or the gas supplier.
Page 2
WARNING
WARNING
This manual outlines the requirements for installation of the PRESTIGE Excellence. Those require­ments include Boiler Piping, Venting/Combustion Air, Start-Up and Maintenance.
- For detailed instructions regarding the installation of the vent/combustion air system reference the PRESTIGE Vent Supplement and/or the various optional vent kit instructions.
- For instructions regarding the PRESTIGE Excellence Domestic Water Heater Installation require­ments and piping, reference the PRESTIGE Excellence Indirect Water Heater Manual beginning after page 70 of PRESTIGE Excellence Water Boiler Manual.
The PRESTIGE Vent Supplement is included in the unit’s installation envelope. For instructions or information regarding the various optional vent kits contact the Engineering Department at Triangle Tube.
Page 3
Table of Contents
PRODUCT AND SAFETY INFORMATION
Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Product and Safety Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
SECTION I - PRE-INSTALLATION ITEMS
Code Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Determining Product Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Boiler Replacement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Recommended Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Residential Garage Installations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Boiler Freeze Protection Feature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
SECTION II - COMBUSTION AIR AND VENTING
Combustion Air Contamination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Ventilation and Combustion Air Requirements - Direct Vent . . . . . . . . . . . 6
Ventilation and Combustion Air Requirements - Category IV . . . . . . . . . . 6
Methods of Accessing Combustion Air into a Space - Category IV . . . . . . 7
- Indoor Combustion Air. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
- Outdoor Combustion Air . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8
- Combination of Indoor and Outdoor Combustion Air. . . . . . . . . . 8-9
Combustion Air and Vent Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Removal of an Existing Boiler from a Common Vent System . . . . . . . . . . 10
Commonwealth of Massachusetts Installation . . . . . . . . . . . . . . . . . . . . . . . 11
SECTION III - UNIT PREPARATIONS
Handling Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Wall Mounting Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Wall Mounting Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Stud Walls - Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Wall Bracket Installation - Solid Walls . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Boiler Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
SECTION IV - BOILER PIPING
General Piping Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Pressure Relief Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Low Water Cut Off Device. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Additional Limit Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
i
Page 4
Table of Contents
Backflow Preventer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Boiler System Piping Applications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Expansion Tank and Makeup Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-17
Diaphragm Expansion Tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Closed-Type Expansion Tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Circulator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Sizing Primary Piping. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
System Piping - Zone Circulators. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
System Piping - Zone Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
System Piping - Through Boiler. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
System Piping - Radiant Heating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
System Piping - Special Applications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
System Piping - Multiple Units Installation . . . . . . . . . . . . . . . . . . . . . . . . . 18
Central Heating (CH) System Piping Diagrams. . . . . . . . . . . . . . . . . . . . . . 19-21
SECTION V - INSTALLING VENT / COMBUSTION AIR & CONDENSATE DRAIN
Installing Vent and Combustion Air . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Installing Condensate Drain Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22-23
SECTION VI - GAS PIPING
Gas Supply Piping Connection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Natural Gas
Pipe Sizing -Natural Gas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Natural Gas Supply Pressure Requirements. . . . . . . . . . . . . . . . . . . 25
Propane Gas
Pipe Sizing - Propane Gas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Propane Gas Supply Pressure Requirements . . . . . . . . . . . . . . . . . . 26
Gas Valve/Venturi Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
SECTION VII - INTERNAL WIRING
General Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Control Module Circulator AMP Ratings. . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Wiring Tool Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Internal Factory Wiring Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
SECTION VIII - EXTERNAL WIRING
Installation Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Line Voltage Connections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Thermostat Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
ii
Page 5
Table of Contents
System Circulator - Zone Valve Application . . . . . . . . . . . . . . . . . . . . . . . . 31
External Modulating Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Outdoor Reset Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Additional 24V Limit Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
External Wiring Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31-33
SECTION IX - START-UP PREPARATION
Check Boiler System Water Chemistry
Water pH Level 6.0 to 8.0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Water Hardness Less Than 7 Grains. . . . . . . . . . . . . . . . . . . . . . . . . 34
Chlorinated Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Flush System to Remove Sediment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Check and Test Antifreeze . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Use of Antifreeze in the Boiler System . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Filling the Boiler System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Check Low Water Cut-Off Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Check for Gas Leaks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Check Thermostat Circuit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Inspection of Condensate Drain Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . 36
SECTION X- START-UP PROCEDURES
Final Checks Before Start-Up. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
PRESTIGE Excellence Start-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
If PRESTIGE Excellence Does Not Start Correctly . . . . . . . . . . . . . . . . . 37
Check the PRESTIGE Excellence and System. . . . . . . . . . . . . . . . . . . . . . 37-38
Operating Instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Set Boiler CH Target Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Operation Verification - Space Heating . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40-41
Set DHW Storage Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Operation Verification - Domestic Hot Water . . . . . . . . . . . . . . . . . . . . . . . 41-42
Boiler Control Display
Standby Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42-43
Setting the Boiler Parameters
Parameter Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Accessing Boiler Information
Information Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
Error (Hard Lockout) Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
iii
Page 6
Table of Contents
SECTION XI - OUTDOOR RESET CONTROL
Mounting the Outdoor Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Wiring the Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Summer/Winter Switch at Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Adjusting Outdoor Reset Curve
CH Maximum Boiler Operating Setpoint (Parameter 4) . . . . . . . . . 48
CH Minimum Boiler Operating Setpoint (Parameter 10) . . . . . . . . 48
CH Reset Curve Coldest Day (Parameter 11) . . . . . . . . . . . . . . . . . 48
CH Reset Curve Warmest Day (Parameter 12) . . . . . . . . . . . . . . . . 49
Entering MCBA Access Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Changing a Parameter Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Outdoor Reset Curve Example. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
SECTION XII - EXTERNAL MODULATING CONTROL
Wiring the Modulating Controller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Parameter Adjustment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Programming of External Modulating Control . . . . . . . . . . . . . . . . . . . . . . 51
Factory Setting for Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
SECTION XIII - CHECK-OUT PROCEDURES
Check-Out Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
SECTION XIV - INSTALLATION RECORD
Installation Record . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
SECTIONS XV - MAINTENANCE SCHEDULE
Service Technician - General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Owner Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
SECTION XVI - MAINTENANCE PROCEDURES
Maintenance Procedures
Reported Problems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Check Surrounding Area. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Inspect Burner Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Check System Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Clean Condensate Drain Assembly . . . . . . . . . . . . . . . . . . . . . . . . . 57
iv
Page 7
Table of Contents
Check Ventilation Air Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Inspect Vent and Combustion Air Piping . . . . . . . . . . . . . . . . . . . . . 57
Check Boiler System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Check Expansion Tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Check Boiler Relief Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Inspection of Ignition Electrode . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Check Ignition Wiring and Ground Wiring . . . . . . . . . . . . . . . . . . . 58
Check Control Wiring. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Check Control Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Perform Start-Up and Checkout Procedure . . . . . . . . . . . . . . . . . . . 59
Check Burner Flame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Check Flame Signal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Check Combustion Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Check Flue Gas Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Clean Heat Exchanger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60-61
Review with Owner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Handling Previously Fired Combustion Chamber Insulation . . . . . 61
REPLACEMENT PARTS
Replacement Parts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62-65
PRODUCT SPECIFICATIONS
Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66-70
v
Page 8
Product & Safety Information
Definitions
The following terms are used throughout this manual to bring attention to the presence of potential hazards or important information concerning the product.
DANGER
Indicates the presence of a hazardous situation which, if ignored, will result in death, serious injury or substantial property damage.
WARNING
Indicates a potentially hazardous situa­tion which, if ignored, can result in death, serious injury or substantial property damage.
CAUTION
Indicates a potentially hazardous situa­tion which, if ignored, may result in minor injury or property damage.
NOTICE
Indicates special instructions on installa­tion, operation or maintenance, which are important to equipment but not related to personal injury hazards.
BEST PRACTICE
Indicates recommendations made by Triangle Tube for the installers which will help to ensure optimum operation and longevity of the equipment
NOTICE
Triangle Tube reserves the right to modify the technical specifications and components of its products without prior notice.
1
Page 9
Product & Safety Information
DANGER
Do not use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system which has been under water.
WARNING
WHAT TO DO IF YOU SMELL GAS
- Do not try to light any appliance
- Do not touch any electrical switch; do not use any phone in your building.
- Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
- If you cannot reach your gas suppli­er, call the fire department.
Installation and service must be per­formed by a qualified installer, service agency or the gas supplier.
WARNING
Should overheating occur or the gas supply fails to shut off, turn OFF the manual gas control valve external to the appliance.
WARNING
DO NOT add cold make up water when the boiler is hot. Thermal shock can cause potential cracks in the heat exchanger.
CAUTION
When servicing the boiler:
- Avoid electrical shock by discon­necting the electrical supply prior to performing maintenance.
WARNING
Qualified Installer:
Prior to installing this product read all instructions included in this manual and all accompanying manuals/documents with this appliance. Perform all installation steps required in these manuals in the proper order given. Failure to adhere to the guide­lines within these manuals can result in severe personal injury, death or substantial property damage.
Homeowner:
- This product should be maintained / serviced and inspected annually by a qualified service technician.
- This manual is intended for use by a qualified Installer/Service Technician.
NOTICE
Please reference the unit’s model num­ber and the serial number from the rat­ing label on the backside of the control panel when inquiring about service or troubleshooting.
NOTICE
Triangle Tube accepts no liability for any damage resulting from incorrect instal­lation or from the use of components or fittings not specified by Triangle Tube.
2
Page 10
Pre-Installation Items
SECTION I - Pre-Installation Items
Code Compliance
This product must be installed in accordance to the following:
- All applicable local, state, national and provincial codes, ordinances, regula­tions and laws.
- For installations in Massachusetts ­code requires the boiler to be installed by a licensed plumber or gas fitter, and if antifreeze is utilized, the installation of a reduced pressure backflow preven­ter device is required in the boiler’s cold water fill or make up water supply line.
- For installation in Massachusetts
All direct vented appliances must com­ply with the guidelines as outlined on page 11.
- The National Fuel Gas Code NFPA54/ ANSI Z 223.1 - Latest edition.
- National Electric Code ANSI/NFPA 70.
- Gas supply piping
- Electrical service
Ensure the boiler location allows the combus­tion air/vent piping to be routed directly through the building and terminate properly outside with a minimum amount of length and bends.
Ensure the area chosen for the installation of the PRESTIGE Excellence is free of any com­bustible materials, gasoline and other flamma­ble liquids.
WARNING
Failure to remove or maintain the area free of combustible materials, gasoline and other flammable liquids or vapors can result in severe personal injury, death or substantial property damage.
Ensure the PRESTIGE Excellence and its con­trols are protected from dripping or spraying water during normal operation or service.
- For installations in Canada -“Installation Code for Gas Burning Equipment” CGA/B149.1 or B149.2 Canadian Electrical Code Part 1 CSA C22.1.
- Standards for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1, when required.
NOTICE
The PRESTIGE Excellence boiler gas manifold and gas controls meet the safe lighting and other performance require­ments as specified in ANSI Z21.13 latest edition.
Determining Product Location
Before locating the PRESTIGE Excellence check for convenient locations to:
- Heating system piping
- Venting
The PRESTIGE Excellence should be installed in a location so that any water leaking from the boiler or piping connections or relief valve will not cause damage to the area sur­rounding the unit or any lower floors in the structure.
Boiler Replacement
If the PRESTIGE Excellence is replacing an existing boiler, the following items should be checked and corrected prior to installation:
- Boiler piping leaks and corrosion.
- Improper location and sizing of the expansion tank on the boiler heating loop.
- If applicable, level and quality of freeze protection within the boiler system.
3
Page 11
Pre-Installation Items
Recommended Clearances
The PRESTIGE Excellence is approved for zero clearance to combustibles, excluding vent and boiler piping.
- Vent & Boiler Piping - 1/4 inch from combustible materials.
BEST PRACTICE
To provide serviceability to the unit it is recommended that the following clear­ances be maintained:
Top boiler jacket - 24 inches.
Front - 24 inches.
Bottom boiler piping - 24 inches.
Rear - 0 inches
Sides - 6 inches
Residential Garage Installations
When installing the PRESTIGE Excellence in a residential garage, the following special precau­tions per NFPA 54/ANSI Z223.1 must be taken:
- Mount the unit with a minimum 18 inches above the floor level of the garage. Ensure the burner and ignition devices / controls are no less than 18 inches above the floor level.
- Locate or protect the unit in a matter so it cannot be damaged by a moving vehicle.
Boiler Freeze Protection Feature
The boiler control has an freeze protection fea­ture built in. This feature monitors the boiler temperature and responds as follows when no call for heat is present:
- 46ºF Boiler circulator is ON
WARNING
If the clearances listed above cannot be maintained or the enclosure in which the boiler is installed is less than 85 cubic feet, the space must be ventilated. See page 6 for ventilation requirements.
NOTICE
When maintaining zero clearance or less than recommended clearances, some product labeling may become hidden and unreadable
WARNING
When installing the PRESTIGE Excellence in a confined space, sufficient air must be provided for proper combus­tion and venting and to allow, under normal operating conditions, proper air flow around the product to maintain ambient temperatures within safe limits to comply with the National Fuel Gas Code NFPA 54 - latest edition.
- 38ºF Boiler circulator is ON and burner operates at low fire
- 50ºF Burner OFF and boiler circulator operates for approximately 10 minutes
CAUTION
The boiler freeze protection feature is disabled during a hard lockout, however the CH circulator will operate and the 3­way valve will open to the CH system.
CAUTION
The boiler freeze protection feature is designed to protect the boiler and should be installed in a primary/secondary pip­ing arrangement. If it is installed in an unheated space or exposed to water tem­peratures of 46ºF or less, see Section IV for primary/secondary piping examples. See Section IX for antifreeze guidelines.
4
Page 12
Combustion Air and Venting
SECTION II - Combustion Air and Venting
Combustion Air Contamination
WARNING
If the PRESTIGE Excellence combus­tion air inlet is located in any area likely to cause or contain contamination, or if products, which would contaminate the air cannot be removed, the combustion air must be repiped and terminated to another location. Contaminated com­bustion air will damage the unit and its burner system, resulting in possible severe personal injury, death or substan­tial property damage.
WARNING
Do not operate a PRESTIGE Excellence if its combustion air inlet is located near a laundry room or pool facility. These areas will always contain hazardous con­taminants.
Potential contaminating products
- Spray cans containing chloro/fluorocar­bons
- Permanent Wave Solutions
- Chlorinated wax
- Chlorine - based swimming pool chem­icals / cleaners
- Calcium Chloride used for thawing ice
- Sodium Chloride used for water soft­ening
- Refrigerant leaks
- Paint or varnish removers
- Hydrochloric acid / muriatic acid
- Cements and glues
- Antistatic fabric softeners used in clothe dryers
- Chlorine-type bleaches, detergents, and cleaning solvents found in household laundry rooms
- Adhesives used to fasten building prod­ucts and other similar products
Pool and laundry products and common household and hobby products often contain fluorine or chlorine compounds. When these chemicals pass through the burner and vent system, they can form strong acids. These acids can create cor­rosion of the heat exchanger, burner components and vent system, causing serious damage and presenting a possi­ble threat of flue gas spillage or water leakage into the surrounding area.
Please read the information listed below. If contaminating chemicals are located near the area of the combustion air inlet, the installer should pipe the combustion air inlet to an outside area free of these chemicals per SECTION V of this installation manual.
Areas likely to contain these products
- Dry cleaning / laundry areas and estab­lishments
- Beauty salons
- Metal fabrication shops
- Swimming pools and health spas
- Refrigeration Repair shops
- Photo processing plants
- Auto body shops
- Plastic manufacturing plants
- Furniture refinishing areas and estab­lishments
- New building construction
- Remodeling areas
- Garages with workshops
5
Page 13
Combustion Air and Venting
Ventilation and Combustion Air Requirements - Direct Vent
A Direct Vent appliance utilizes uncontaminat­ed outdoor air (piped directly to the appliance) for combustion)
For Direct Vent installations, involving only the PRESTIGE Excellence, in which the minimum service clearances are maintained as listed on page 4, no ventilation openings are required.
For Direct Vent, zero service clearance installa­tions involving only the PRESTIGE Excellence, the space / enclosure must provide two openings for ventilation. The openings must be sized to provide 1 square inch of free area per 1,000 BTUH of boiler input. The openings shall be placed 12 inches from the top of the space and 12 inches from the floor of the space.
For installations in which the PRESTIGE Excellence shares the space with air movers (exhaust fan, clothes dryers, fireplaces, etc.) and other combustion equipment (gas or oil) the space must be provided with adequate air openings to provide ventilation and combus­tion air to the equipment. To properly size the ventilation / combustion air openings, the installer must comply with the National Fuel Gas Code NFPA 54, ANSI Z223.1 for installa­tions in the U.S or CSA B149.1 and B149.2 for installations in Canada.
WARNING
The space must be provided with venti­lation / combustion air openings proper­ly sized for all make-up air requirements (exhaust fans, clothes dryers, fireplaces, etc.) and the total input of all appliances located in the same space as the PRES­TIGE Excellence, excluding the input of a Direct Vent PRESTIGE Excellence which uses combustion air directly from the outside, thus additional free area for the openings is not required. Failure to provide or properly size the openings could result in severe personal injury, death or substantial property damage.
Ventilation and Combustion Air Requirements - Category IV
A Category IV appliance utilizes uncontami­nated indoor or outdoor air (surrounding the appliance) for combustion.
BEST PRACTICE
In order to reduce the potential risks associated with indoor contaminates (listed on page 5), flammable vapors and tight housing construction (little or no infiltration air), it is recommended to pipe uncontaminated combustion air directly from the outdoors to the appli­ance. This practice also promotes higher system efficiency by reducing heated indoor air from being exhausted from the house and replaced by cold infiltra­tion air into the house.
For installations in which the PRESTIGE Excellence shares the space with air movers (exhaust fan, clothes dryers, fireplaces, etc.) and other combustion equipment (gas or oil) the space must be provided with adequate air open­ings to provide ventilation and combustion air to the equipment. To properly size the ventilation / combustion air openings, the installer must comply with the National Fuel Gas Code NFPA 54, ANSI Z223.1 for installations in the U.S or CSA B149.1 and B149.2 for installations in Canada, as referenced in this section of the man­ual and titled Methods of Accessing Combustion Air into a Space.
WARNING
The space must be provided with venti­lation / combustion air openings proper­ly sized for all make-up air requirements (exhaust fans, clothes dryers, fireplaces, etc.) and the total input of all appliances, including the PRESTIGE Excellence when located in the same space as the PRESTIGE Excellence. Failure to pro­vide or properly size the openings could result in severe personal injury, death or substantial property damage.
6
Page 14
Combustion Air and Venting
Methods of Accessing Combustion Air Into A Space - Category IV
Indoor Combustion Air
NOTICE
The methods listed in this section for accessing Indoor Combustion Air assume that the infiltration rate is ade­quate and not less than .40 ACH. For infiltration rates less than .40 ACH, ref­erence the NFPA 54 National Fuel Gas Code for additional guidance.
Opening Size and Location
Openings used to connect indoor spaces shall be sized and located in accordance with the following. See Fig. 1:
inches of the bottom of the enclosure. The minimum dimension of air open­ings shall be not less than 3 inches.
- Combining spaces in different stories. The volumes of spaces in different sto­ries shall be considered as communicat­ing spaces where such spaces are con­nected by one or more openings in doors or floors having a total minimum free area of 2 sq. in./1000 Btu/hr of total input rating of all gas utilization equipment.
Outdoor Combustion Air
BEST PRACTICE
Isolating the combustion appliance room from the rest of the building and bring­ing in uncontaminated outside air for combustion and ventilation is always preferred.
Fig. 1:
All Combustion Air from Adjacent Indoor Spaces Through Indoor Combustion Openings
- Combining spaces on the same story. Each opening shall have a minimum free area of 1 sq. in./1000 Btu/hr of the total input rating of all gas utilization equipment in the space, but not less than 100 sq. inches. One opening shall com­mence within 12 inches of the top, and one opening shall commence within 12
Opening Size and Location
The minimum dimension of air openings shall be not less than 3 inches
Openings used to supply combustion and ven­tilation air shall be sized and located in accor­dance with the following:
One Permanent Opening Method. See Fig. 2
One permanent opening, commencing within 12 in. of the top of the enclosure, shall be provided. The equipment shall have clearances of at least 1 inch from the sides and 6 in. from the front of the appliance. The opening shall directly communi­cate with the outdoors or shall communicate through a vertical or horizontal duct to the out­doors or spaces that freely communicate with the outdoors and shall have a minimum free area of the following:
- 1sq. in./3000 Btu/hr of the total input rating of all equipment located in the enclosures, and
7
Page 15
Combustion Air and Venting
- Not less than the sum of the areas of all vent connectors in the space.
Fig. 2:
All Combustion Air from Outdoors Through One Permanent Air Opening
Two Permanent Openings Method.
Two permanent openings, one commencing within 12 in. of the top and one commencing within 12 in. of the bottom of the enclosure, shall be provided. The openings shall commu­nicate directly, or by ducts, with the outdoors or spaces that freely communicate with the out­doors, as follows:
- Where directly communicating with the outdoors or where communication to the outdoors is through vertical ducts, each opening shall have a minimum free area of 1 sq. in./4000 Btu/hr of total input rat­ing of all equipment in the enclosure. See Fig.3.
Fig. 3:
Fig. 4:
All Combustion Air from Outdoors Through Ventilated Attic
All Combustion Air from Outdoors through Horizontal Ducts
- Where communicating with the out­doors is through horizontal ducts, each opening shall have a minimum free area of not less than 1 sq.in./2000 Btu/hr of total input rating of all equip­ment in the enclosure. See Fig. 4.
Combination of Indoor and Outdoor Combustion Air
Indoor Openings: Where used, openings con­necting the interior spaces shall comply with the Indoor Combustion Air section on page 7.
8
Page 16
Combustion Air and Venting
Outdoor Opening(s) Location. Outdoor open­ing(s) shall be located in accordance with the Outdoor Combustion Air section.
Outdoor Opening(s) Size. Outdoor opening(s) shall be calculated in accordance with the following:
- The ratio of the interior spaces shall be the available volume of all communi­cating spaces divided by the required volume.
- The outdoor size reduction factor shall be 1 minus the ratio of interior spaces.
- The minimum size of outdoor open­ing(s) calculated in accordance with the above outdoor air section multiplied by the reduction factor. The minimum dimension of air openings shall not be less than 3 in.
DANGER
Do not install the PRESTIGE Excellence into a common vent with other gas or oil appliances. This may cause flue gas spillage or appliance malfunction, result­ing in possible severe personal injury, death or substantial property damage.
Combustion Air and Vent Piping
The PRESTIGE Excellence requires a Category IV venting system, which is designed for pressurized venting and condensate.
BEST PRACTICE
In order to reduce the potential risks associated with indoor contaminates (listed on page 5), flammable vapors and tight housing construction (little or no infiltration air), it is recommended to pipe uncontaminated combustion air directly from the outdoors to the appli­ance. This practice also promotes higher system efficiency by reducing heated indoor air from being exhausted from the house and replaced by cold infiltra­tion air into the house.
NOTICE
Install combustion air and vent pipe as detailed in the PRESTIGE Vent Supplement included in the boiler installation envelope. Refer to optional vent kit instructions for additional vent installation instructions.
DANGER
Verify installed combustion air and vent piping are sealed gas tight and meet all provided instructions and applicable codes, failure to comply will result in severe personal injury of death.
The PRESTIGE Excellence is certified per ANSI Z21.13 as a Category IV or Direct Vent (sealed combustion) appliance. A Category IV appliance utilizes uncontaminated indoor or outdoor air (surrounding the appliance) for combustion. A Direct Vent appliance utilizes uncontaminated outdoor air (piped directly to the appliance) for combustion.
9
Page 17
Combustion Air and Venting
Removal of an Existing Boiler from a Common Vent System
BEST PRACTICE
When an existing boiler is removed from a common venting system, the common vent­ing system is likely to be too large for proper venting of the remaining appliances. At the time of removal of an existing boiler, the fol­lowing steps shall be followed with each appliance remaining connected to the com­mon venting system placed in operation, while the other appliances remaining con­nected to the common venting system are not in operation.
1. Seal any unused openings in the common venting system.
2. Visually inspect the venting system for proper size and horizontal pitch and deter­mine there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.
3. Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remain­ing connected to the common venting sys­tem are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.
5. Test for spillage at the draft hood relied opening after 5 minutes of main burner operation. Use the flame of a match or can­dle, or smoke from a cigarette, cigar or pipe.
6. After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers, and any other gas-burning appli­ance to their previous condition of use.
7. Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or CAN/CGA B149, Installation codes. When resizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables in Part II of the National Fuel Gas Code ANSI Z223.1/NFPA 54 and/or CAN/CGA B149, Installation codes.
DANGER
Do not install the PRESTIGE Excellence into a common vent with other gas or oil appliances. This may cause flue gas spillage or appliance malfunction, result­ing in possible severe personal injury, death or substantial property damage.
4. Place in operation the appliance being inspected. Follow the lighting instructions. Adjust thermostat so appliance will oper­ate continuously.
10
Page 18
Combustion Air and Venting
Commonwealth of Massachusetts Installations Only
For direct-vent appliances, mechanical­vent heating appliances or domestic hot water equipment, where the bottom of the vent terminal and the air intake is installed below four feet above grade the following requirements must be satisfied:
1. If there is not one already present, on
each floor level where there are bed­room(s), a carbon monoxide detector and alarm shall be placed in the living area outside the bedroom(s). The car­bon monoxide detector shall comply with NFPA 720 (2005 Edition).
2. A carbon monoxide detector shall be
located in the room that houses the appliance or equipment and shall:
a. Be powered by the same electrical
circuit as the appliance or equip­ment such that only one service switch services both the appliance and the carbon monoxide detector;
b. Have battery back-up power;
c. Meet ANSI/UL 2034 Standards and
comply with NFPA 720 (2005 Edition); and
d. Have been approved and listed by
the Nationally Recognized Testing Laboratory as recognized under 527 CMR.
4. A metal or plastic identification plate shall be mounted at the exterior of the building, four feet directly above the location of vent terminal. The plate shall be of sufficient size to be easily read from a distance of eight feet away, and read “Gas Vent Directly Below”.
NOTICE
Installer must provide tag identification plate and ensure the lettering meets code requirements.
For direct-vent appliances, mechanical­vent heating appliances or domestic hot water equipment, where the bottom of the vent terminal and the air intake are installed above four feet above grade the following requirements must be satisfied:
1. If there is not one already present, on each floor level where there are bed­room(s), a carbon monoxide detector and alarm shall be placed in the living area outside the bedroom(s). The car­bon monoxide detector shall comply with NFPA 720 (2005 Edition).
2. A carbon monoxide detector shall:
a. Be located in the rooms that houses
the appliances or equipment;
b. Be either hard wired or battery
powered or both; and
3. A Product-approved vent terminal must be used, and if applicable, a Product­approved air intake must be used. Installation shall be in strict compliance with the manufacturer’s instructions. A copy of the installation instructions shall remain with the appliance or equipment at the completion of the installation.
c. Shall comply with NFPA 720 (2005
Edition)
3. A Product-approved vent terminal must be used, and if applicable, a Product­approved air intake must be used. Installation shall be in strict compliance with the manufacturer’s instructions. A copy of the installation instructions shall remain with the appliance or equipment at the completion of the installation.
11
Page 19
Unit Preparations
SECTION III - Unit Preparations
Handling Instructions
The PRESTIGE Excellence is generally easier to handle and maneuver once removed from the shipping carton and pallet.
To remove the shipping carton and pallet:
CAUTION
Use care not to lift the unit from, or place the unit on the front plastic control panel, damage can occur. Use care not to drop, bump or rotate the boiler upside down, as damage to the boiler will result.
1. Remove any shipping straps and open the side of the shipping carton.
2. Slide the unit with the foam inserts out of the carton.
3. Discard all packing materials.
Wall Mounting Installation
Due to the excessive weight, the PRESTIGE Excellence should be wall mounted using the bracket kit provided with the boiler. The PRESTIGE is not designed for floor installa­tion. If floor installation is required an optional floor stand is available through Triangle Tube.
WARNING
The wall used for mounting the PRES­TIGE Excellence must be vertically plumbed and capable of supporting a minimum 250 pounds [113 Kg]. Failure to comply with these requirements could result in personal injury, death or sub­stantial property damage.
secure mounting surface must be provided for installation of the bracket.
2. DO NOT mount or attempt to mount the wall bracket to hollow sheet rock or lathe walls using anchors. Only install boiler to studs or equivalent wood structure.
3. For applications using solid walls (rock, concrete, brick, cinder block, etc.), install the wall bracket using anchors (double expansion shields) and bolts with washers provided with the boiler.
4. The boiler is too heavy and bulky for a sin­gle person to lift and attempt to mount; a minimum of 2 people is required for mounting the boiler.
WARNING
Use extreme care not to drop the boiler or cause bodily injury while lifting or mounting the boiler onto the bracket. Once mounted verify that the boiler is securely attached to the bracket and wall. Failure to comply with the above guidelines could result in property dam­age, personal injury or death.
Stud Walls -Installation
1. To distribute the weight of the boiler even­ly when mounting onto a stud wall it is rec­ommended to use the PRESTIGE Wall Frame kit.
2. When using the wall frame to mount the boiler reference the kit installation instruc­tions and ensure the frame is securely fas­tened to the wall.
3. If the structure of wall is questionable, in supporting a minimum weight of 250 pounds [113 Kg.], it is recommended to use the optional floor stand.
Wall Mounting Guidelines
1. The wall frame kit is designed for stud spacing of 12 inch or 16 inch on centers. For unconventional stud spacing, a solid /
12
Page 20
Unit Preparations
Wall Bracket Installation - Solid Walls
1. Locate the general area of the boiler place­ment.
2. Place the wall-mounting bracket on the wall ensuring the upper edge of the bracket is away from the wall.
3. Level the bracket and use a pencil to mark the location of the mounting slots on the wall.
4. Remove the bracket from the wall and drill a 5/8” diameter hole by 1-3/8” deep posi­tioned in the center of each mark.
5. Install the anchors (provided) flush or slightly recessed in the drilled holes with threaded side facing down.
6. Reposition the bracket on the wall and align mounting slots/holes. Insert the two bolts (provided) through the mounting slots/holes and loosely tighten.
7. Level bracket and tighten bolts securely.
Boiler Mounting
1. Obtain assistance in lifting the boiler onto the wall bracket.
2. Install the boiler making sure the boiler mounting lip located along the upper edge of the rear jacket panel engages the wall­mounting bracket. Ensure the boiler is seated properly and is secure.
13
Page 21
Boiler Piping
SECTION IV - Boiler Piping
General Piping Requirements
- All plumbing must meet or exceed all local, state and national plumbing codes.
- Support all piping using hangers. DO NOT support piping by the unit or its components.
- Use isolation valves to isolate system com­ponents.
- Install unions for easy removal of the PRESTIGE Excellence from the system piping.
If plastic pipe is used for boiler water pip­ing, it must have a maximum oxygen diffu­sion rate of 0.1 mg/liter-day for boiler and water heater protection.
WARNING
Use a two wrench method when tighten­ing piping onto the boiler connections. Use one wrench to prevent the boiler piping from turning / twisting. Failure to support the boiler piping and connec­tions in this manner could cause damage to the boiler and its components.
Pressure Relief Valve
1. The PRESTIGE Excellence is supplied with a 30 psi pressure relief valve and must be piped using the PRV connection as shown in Fig. 5 page 15.
- Should be directed downward towards the floor at all times. The piping should terminate at least 6 inches above any drain connection to allow clear visibili­ty of the discharge.
- Should terminate with a plain end, not with a threaded end. The material of the piping should have a serviceable temperature rating of 250ºF or greater.
- Should not be subject to conditions where freezing could occur.
- Should not contain any shut-off valves or obstructions. No shut-off valve should be piped between the boiler and relief valve.
WARNING
Failure to comply with the guidelines on installing the pressure relief valve and dis­charge piping can result in personal injury, death or substantial property damage.
Low Water Cutoff Device
- The PRESTIGE Excellence is equipped with a factory installed pressure switch type Low Water Cut Off device.
- The minimum operating system pressure allowable with this device is 10 psig.
- Check local codes if a Low Water Cutoff Device is required. If so, determine if this device meets the requirements of the local codes.
2. To avoid potential water damage to the sur­rounding area or potential scalding hazard due to the operation of the relief valve, the discharge piping:
- Must be connected to the discharge out-
let of the relief valve and directed to a safe place of disposal.
- Length should be as short and direct as
possible. The size of the discharge line should not be reduced, maintain the same size as the outlet of the relief valve.
NOTICE
The PRESTIGE Excellence control sys­tem also uses the sensing of the system water temperatures entering and exiting the heat exchanger to provide protection against low water conditions Where local codes and jurisdiction do not accept a pressure device for low water protection, the jurisdictions may accept these PRESTIGE Excellence integral control functions as a means of provid­ing low water protection.
14
Page 22
Boiler Piping
CH Supply Connection
CH Return
Connection
Pressure Relief Valve
(Supplied with Boiler)
3/4" Street Elbow
Air Vent
Drain Piping Directed to a Suitable Place of Drainage
Fig. 5: Pressure Relief Valve Installation
15
Page 23
Boiler Piping
Additional Limit Control
If a separate LWCO device is required by cer­tain local jurisdictions or when the boiler is installed above the system piping, the follow­ing guidelines must be followed:
- The LWCO device must be designed
for water installations, electrode probe­type is recommended.
- The LWCO device must be installed in
a tee connection on the boiler supply piping above the boiler.
- Wiring of the LWCO device to the PRES-
TIGE Excellence is done directly onto the 24V terminal strip, reference Fig. 20 page 29 for available terminals for an external limit (manual or auto reset).
If the installation is to comply with ASME or Canadian requirements, an additional high temperature limit may be needed. Consult local code requirements to determine compli­ance. The limit should be installed as follows:
Boiler System Piping Applications
BEST PRACTICE
It is recommended on all piping applica­tions to utilize a primary/secondary pip­ing arrangement as a means to provide freeze protection of the boiler, which is an integral function of the boiler control. Maintain the minimum boiler flow rate, see Graph 2 on page 70. For other piping arrangements, consult the Engineering Department at Triangle Tube or consult other approved/recognized design arrangement.
BEST PRACTICE
On piping applications utilizing a single zone or other recognized piping design arrangements, it is recommended that the installer uses flow/check valves with weighted seats at or near the appliance to prevent gravity circulation.
- Install the limit in the boiler supply pip-
ing between the boiler and any isolation valve.
- Maximum set point for the limit is
194ºF.
- For wiring of the limit reference Fig. 20,
page 29, using the external limit/manual reset terminals on the 24V terminal strip. This will provide a "hard" lockout requiring a manual reset of the control.
Backflow Preventer
- Use a backflow preventer valve in the
make-up water supply to the unit as required by local codes.
Expansion Tank and Makeup Water
Ensure the expansion tank is properly sized for the boiler volume (5 gallons [19 L]) and the system volume and temperature.
CAUTION
Undersized expansion tanks will cause system water to be lost through the pres­sure relief valve and cause additional makeup water to be added to the system. Eventual boiler heat exchanger failure can result due to this excessive makeup water addition.
16
Page 24
Boiler Piping
The expansion tank must be located as shown in the piping diagrams on pages 19 through 21 or as per recognized design methods. Refer to the expansion tank manufacturer instructions for additional installation details.
Connect the expansion tank to an air separator only if the air separator is located on the suc­tion side (inlet) of the system circulator. Always locate and install the system fill con­nection at the same location as the expansion tank connection to the system.
Diaphragm Expansion Tank
Always install an automatic air vent on the top of the air separator to remove residual air from the system.
Closed-Type Expansion Tank
It is recommended to pitch any horizontal pip­ing upwards toward the expansion tank 1 inch per 5 feet of piping. Use 3/4” piping for the expansion tank to allow air within the system to rise.
Sizing Primary Piping
See Fig. 9 through 13, pages 19 - 21, for rec­ommended piping arrangements based on vari­ous applications.
Size the piping and system components required in the space heating system, using rec­ognized design methods.
System Piping - Zone Circulators
Connect the PRESTIGE Excellence to the sys­tem piping as shown in Fig. 9 page 19 when zoning with zone circulators.
The installer must provide a separate circulator for each zone of space heating.
NOTICE
To ensure adequate flow rate through the PRESTIGE Excellence, maintain a minimum 1 inch diameter on the system piping connecting to the boiler.
System Piping - Zone Valves
CAUTION
DO NOT install automatic air vents on a closed-type expansion tank system. Air must remain in the system and be returned to the expansion tank to pro­vide an air cushion. An automatic air vent would cause air to be vented from the system resulting in a water-logged expansion tank.
Circulator
The PRESTIGE Excellence is supplied with a boiler circulator that provides circulation for space (CH) heating and domestic (DHW) hot water production. See Graph 2 on page 70 for pressure drop and minimum flow rate through the boiler.
Connect the PRESTIGE Excellence to the sys­tem piping as shown in Fig. 10 page 19 when zoning with zone valves. The primary / sec­ondary piping ensures that the boiler loop has sufficient flow.
NOTICE
To ensure adequate flow rate through the PRESTIGE Excellence, maintain a minimum 1 inch diameter on the system piping connecting to the boiler.
17
Page 25
Boiler Piping
System Piping - Through Boiler
In applications in which primary/secondary piping is not utilized and the system is zoned with zone valves a circulator could pump through the boiler and system directly. When pumping through with more than one zone, a pressure differential bypass valve is required to avoid dead heading the pump through the post pump feature of the control. Consult Fig. 11 and 12 page 20 for piping diagrams and Graph 2 on page 70 for proper circulator sizing.
System Piping - Radiant Heating
The heat exchanger design of the PRESTIGE Excellence allows operation in a condensing mode. This feature requires no regulation of the return water temperature back to the boiler in radiant heating applications.
The boiler water supply temperature can be maintained by the PRESTIGE Excellence, eliminating the need for a mix system to achieve the desired temperature.
Size the system piping and circulator to provide the flow needed for the radiant system.
NOTICE
To ensure adequate flow rate through the PRESTIGE Excellence, maintain a minimum 1 inch diameter on the system piping connecting to the boiler.
System Piping - Special Application
If the boiler is used in conjunction with a chilled water/medium system, the boiler and chiller must be piped in parallel. Install flow/check valves to prevent the chilled medi­um from entering into the boiler.
If the boiler is used to supply hot water to the heating coils of an air handler where they may be exposed to chilled air circulation, install flow/check valves or other automatic means to prevent gravity circulation of the boiler water during cooling cycles.
The installer may consider adding a high tem­perature limit on the system piping to ensure that the primary supply temperature does not exceed the maximum allowable temperature for the radiant tubing.
BEST PRACTICE
The addition of the high temperature limit is important when the PRESTIGE Excellence has completed a DHW mode, which requires a high primary supply water temperature.
NOTICE
Due to the construction of the water heater, do not install the PRESTIGE Excellence if the boiler piping contains non-oxygen barrier tubing if the boiler piping is considered an “open system”. Exposing the outer tank of the PRES­TIGE Excellence water heater to oxygen contamination will lead to premature tank failure and denial of the warranty.
System Piping - Multiple Units Installation
It is recommended to use a balanced manifold system as the primary / secondary connection to the space heating piping.
Maintain a minimum of 6 inches of clearance between units to allow for servicing.
For the space heating piping refer to the appli­cations mentioned in this manual or use recog­nized design methods.
18
Page 26
Boiler Piping
5
5
4
6
1
2
3
3
3
3
9
8
10
1
1
4
4
4
4
4
4
Z
one Load
Additional
7
6
M
ax.
12"
Z
one Load
5
5
4
6
12
9
8
4
4
4
4
4
Zone Load
Additional
Max.
12"
Zone Load
1
2
10
11
4
7
6
Fig. 9: CH System Piping - Zoning with Zone Circulators
1. PRESTIGE Excellence boiler
2. CH circulator (provided)
3. Flow/check valve 4 Isolation valve
Fig. 10: CH System Piping - Zoning with Zone Valves
1. PRESTIGE Excellence boiler
2. CH circulator (provided)
3. Flow/check valve 4 Isolation valve
5. Zone circulator
6. Drain/purge valve
7. Pressure relief valve
8. Air separator
5. Zone valve
6. Drain/purge valve
7. Pressure relief valve
8. Air separator
9. Automatic air vent
10. Diaphragm expansion tank
11. Automatic fill valve
9. Automatic air vent
10. Diaphragm expansion tank
11. Automatic fill valve
12. System circulator
19
Page 27
Boiler Piping
7
4
4
5
4
4
5
12
P
Z
one Load
Additional
Zone Load
6
10
11
4
1
2
7
4
9
8
6
10
11
4
1
2
7
4
Single
Zone load
9
8
Note: Verify CH circula­tor is properly sized to overcome the system pres­sure drop and provide ade­quate flow through the boiler system.
Fig. 11: CH System Piping - Multiple Zone Valve with Single System/Boiler Circulator
1. PRESTIGE Excellence boiler
2. CH circulator 4 Isolation valve
5. Zone valve
6. Drain/purge valve
7. Pressure relief valve
8. Air separator
9. Automatic air vent
10. Diaphragm expansion tank
11. Automatic fill valve
12. Pressure differential valve
Note: Verify CH circula­tor is properly sized to overcome the system pres-
Fig. 12: CH System Piping - Single Zone System with Single System/Boiler Circulator
sure drop and provide ade­quate flow through the boiler system.
1. PRESTIGE Excellence boiler
2. CH circulator
3. Flow check valve 4 Isolation valve
6. Drain/purge valve
7. Pressure relief valve
8. Air separator
20
9. Automatic air vent
10. Diaphragm expansion tank
11. Automatic fill valve
Page 28
Boiler Piping
5
5
4
6
12
9
8
4
4
Radiant Zone
Additional
4
4
4
Radiant Zone
Max.
12"
1
2
10
11
4
7
6
Note: Manifold mounted valve actuators may be used in lieu of zone valves.
Fig. 13: CH System Piping - Radiant/Low Temp. Heating
1. PRESTIGE Excellence boiler
2. CH circulator (provided)
3. Flow/check valve 4 Isolation valve
5. Zone valve
6. Drain/purge valve
7. Pressure relief valve
8. Air separator
9. Automatic air vent
10. Diaphragm expansion tank
11. Automatic fill valve
12. System circulator
21
Page 29
Installation Vent/Combustion Air & Condensate
SECTION V - Installing Vent / Combustion Air & Condensate Drain
Installing Vent and Combustion Air
DANGER
The PRESTIGE Excellence must be vented and supplied with combustion air as shown in the PRESTIGE Vent Supplement, included in the boiler installation envelope. Refer to optional vent kit instructions for additional vent installation instructions. Once installa­tion is completed, inspect the vent and combustion air system thoroughly to ensure systems are airtight and comply with the instructions given in the venting supplement and are within all require­ments of applicable codes. Failure to comply with the installation require­ments on the venting and combustion air piping will cause severe personal injury or death.
WARNING
Ensure the condensate drain assembly contains the plastic seated ball. Do not install the condensate drain assembly if the ball is lost or missing, replace the entire assembly.
3. Remove the compression nut and rubber seal from the drain outlet.
4. Using 3/4” x 2’ flexible PVC tube provid­ed, slide the compression nut and rubber seal over the pipe.
NOTICE
The use of 3/4” PVC or CPVC pipe is also acceptable. If 3/4” pipe is used deburr and chamfer pipe to allow mat­ing onto the drain assembly.
5. Thread the rubber seal into the compres­sion nut to ease installation of the pipe to the drain assembly.
Installing Condensate Drain Assembly
1. Locate the condensate drain assembly and install as shown in Fig. 15 page 23.
NOTICE
The installer may want to fill the con­densate trap with water prior to assem­bling on the unit.
2. Remove the retaining nut and rubber seal from the condensate drain assembly and slide over the heat exchanger condensate drain nipple. Connect the condensate drain assembly to the retaining nut and tighten.
Hand tight only!
6. Seat the pipe onto the drain assembly and
tighten the compression nut. Hand tight
only!
NOTICE
The installer may opt to using 13/16" ID tubing in lieu of rigid piping.
NOTICE
The drain line materials must be an approved material by the authority hav­ing jurisdiction. In absence of such authority, PVC and CPVC piping must comply with ASTM D1785 or D2845. The cement and primer used on the pip­ing must comply with ASME D2564 or F493. For installations in Canada, use CSA or ULC certified PVC or CPVC pipe, fittings and cement/primer.
22
Page 30
Flexible Tubing
(or 3/4 PVC/ CPVC Piping
to Drain)
Compression
Nut with Rubber Seal
Fill Plug
with Vaccum
Break Port
Condensate
Drain Assembly
Plastic Ball
Retaining Nut with Rubber Seal (Hand Tight Only)
Heat Exchanger Condensate Drain Nipple
Installation Vent/Combustion Air & Condensate
7. Continue the pipe from the drain assembly to a floor drain or condensate pump.
The condensate drain must remain filled
NOTICE
When selecting and installing a conden­sate pump, ensure the pump is approved for use with condensing boilers and fur­naces. The pump should be equipped with an overflow switch to prevent prop­erty damage from potential condensate spillage.
8. The PRESTIGE Excellence will typically produce a condensate that is considered slightly acidic with a pH content below 3.0. Install a neutralizing filter if required by authority having jurisdiction.
and unobstructed and allow unrestricted flow of condensate. The condensate should not be subject to conditions where freezing could occur. If the con­densate is subjected to freezing or becomes obstructed , it can exit from the heat exchanger, resulting in potential water damage to the boiler and sur­rounding area.
CAUTION
Fig. 15: Condensate Drain Assembly
23
Page 31
Sediment Trap Min. Length of 3"
Union Fitting
Cap
Tee Fitting
External Manual Gas Shut Off Valve (Must Be Within 6' of the Boiler)
Gas Flow
Gas Piping
SECTION VI - Gas Piping
Gas Supply Piping Connection
The gas supply piping must be installed in accordance to all applicable local, state and national codes and utility requirements.
1. Install a 1/2” NPT pipe union at the factory supplied gas nipple, for ease of service.
2. Install a manual shutoff valve in the gas supply piping as shown in Fig. 16. For installations in Canada the installer must tag and identify the main shutoff valve.
3. Install a sediment trap (drip leg) on the gas supply line prior to connecting to the PRESTIGE Excellence gas train as shown in Fig. 16.
4. Support the gas piping using hangers. Do not support the piping by the unit or its components.
7. Use pipe dope compatible with natural and propane gases. Apply sparingly only to the male threads of pipe joints so that pipe dope does not block gas flow.
WARNING
Failure to apply pipe dope as detailed above can result in severe personal injury, death or substantial property damage.
WARNING
Use a two-wrench method of tightening gas piping near the unit and its gas pip­ing connection. Use one wrench to pre­vent the boiler gas line connection from turning and the second to tighten adja­cent piping. Failure to support the boil­er gas piping connection could damage the gas line components.
5. Purge all air from the gas supply piping.
6. Before placing the PRESTIGE Excellence into operation, check and test all connec­tions for leaks.
- Close the manual shutoff valve during
any pressure test with less than 13”w.c..
- Disconnect the PRESTIGE Excellence
and its gas valve from the gas supply piping during any pressure test greater than 13”w.c..
WARNING
Do not check for gas leaks with an open flame. Use a gas detection device or bub­ble test. Failure to check for gas leaks can cause severe personal injury, death or substantial property damage.
Fig. 16: Recommended Gas Supply Piping
24
Page 32
Gas Piping
NATURAL GAS
Pipe Sizing - Natural Gas
Refer to Table 1 for Schedule 40 metallic pipe length and diameter requirements for natural gas, based on rated PRESTIGE Excellence input (divide by 1,000 to obtain cubic feet per hour).
- Table 1 is based on Natural Gas with a spe­cific gravity of 0.60 and a pressure drop through the gas piping of 0.30”w.c..
- For additional gas piping sizing informa­tion, refer to ANSI Z223.1. For Canadian installations refer to B149.1 or B149.2.
Natural Gas Supply Pressure Requirements
1. Pressure required at the gas valve inlet supply pressure port:
- Maximum 13”w.c. at flow or no flow
conditions to the burner.
- Minimum 5”w.c. during flow conditions to the burner. Must be verified during start up and with all other gas appliances operating within the building.
2. Install 100% lockup gas pressure regulator in the gas supply line if inlet pressure can exceed 13”w.c at any time. Adjust the lock­up pressure regulator for 13”w.c maximum.
WARNING
DO NOT adjust or attempt to measure gas valve outlet pressure. The gas valve is factory-set for the correct outlet pres­sure. This setting is suitable for natural gas and propane and requires no field adjustment. Attempts by the installer to adjust or measure the gas valve outlet pressure could result in damage to the valve, causing potential severe personal injury, death or substantial property damage.
Table 1: Gas Piping Sizing - Natural Gas
25
Page 33
Gas Piping
PROPANE GAS
Pipe Sizing - Propane Gas
1. Contact the local propane gas supplier for recommended sizing of piping, tanks and 100% lockup gas regulator.
Propane Gas Supply Pressure Requirements
1. Adjust the propane supply regulator pro­vided by the gas supplier for 13”w.c. max­imum pressure
2. Pressure required at the gas valve inlet sup­ply pressure port:
- Maximum 13”w.c. at flow or no flow
conditions to the burner
- Minimum 5”w.c. during flow conditions
to the burner. Must be verified during start up and with all other gas appliances operating within the building.
NOTICE
The propane orifice requirement for PRESTIGE Excellence is 0.204” (#52)
WARNING
DO NOT adjust or attempt to measure gas valve outlet pressure. The gas valve is factory-set for the correct outlet pres­sure. This setting is suitable for natural gas and propane and requires no field adjustment. Attempts by the installer to adjust or measure the gas valve outlet pressure could result in damage to the valve, causing potential severe personal injury, death or substantial property damage.
WARNING
Prior to start up, ensure the unit is set to fire propane. Check the rating label for the type of fuel. Check the gas valve for propane conversion label. If there is a conflict or doubt on the burner set up, remove the gas valve and check for the propane orifice, see Fig. 17 page 27. Failure to ensure proper burner setup could result in severe personal injury, death or substantial property damage.
26
Page 34
Venturi
Inlet Supply
Pressure Port
Propane
Orifice
Gas Valve
Gasket
Gas Valve
Pipe Fitting
Gas Valve
Gas Piping
Fig. 17: Gas Valve / Venturi Assembly
27
Page 35
Terminal Block
Wiring Tool
Internal Wiring
SECTION VII - Internal Wiring
WARNING
ELECTRICAL SHOCK HAZARD. For your safety, disconnect electrical power supply to the unit before servicing or making any electrical connections to avoid possible electric shock hazard. Failure to do so can cause severe person­al injury or death.
CAUTION
Prior to servicing, label all wires prior to disconnection. Wiring errors can cause improper and dangerous operation. Verify proper wiring and operation after servicing.
General Requirements
- Wiring must be N.E.C Class 1.
- If original wiring as supplied with the unit must be replaced, use only Type T 90ºC (190ºF) wire or equivalent as a minimum.
Control Module Circulator AMP Ratings
- AMP draw of the CH circulator not to exceed 2 amps
Wiring Tool Instructions
1. Locate the wiring tool on the PRESTIGE Excellence just below the MCBA control in a plastic bag.
2. Locate the terminal blocks on the PRES­TIGE Excellence below the MCBA con­trol.
NOTICE
The 120V Terminals are located on the left set of Terminal Blocks. The 24V Terminals are located on the right set of terminal blocks.
3. Carefully pull down on the lower half of the terminal block to remove.
4. Hook the wiring tool into the desired slot of the terminal block as shown in Fig.19.
- The PRESTIGE Excellence must be elec­trically grounded as required by National Electrical Code ANSI/NFPA 70 - latest edi­tion and / or the Canadian Electrical Code Part 1, CSA C22.1, Electrical Code.
Fig. 19:
Using the wiring tool on the terminal blocks
5. Push wiring tool in towards the terminal block and insert wire in slot at bottom of terminal block.
6. Repeat steps 4 & 5 until all wiring is com­plete.
7. Re-connect the lower half of the terminal block to the upper half.
8. Place the wiring tool back into the plastic bag or leave tool hooked to a slot on the 24V terminal block.
BEST PRACTICE
When wiring the PRESTIGE Excellence allow additional length of wire for the access panel to swing open during servicing.
28
Page 36
External Input (+)
External Input (-)
Valve CH
Valve DHW
Internal Wiring
Fig. 20: PRESTIGE Excellence Boiler Factory Wiring
29
To properly connect wires to terminal block, use wiring tool included with PRESTIGE. See wiring tool instructions, page 28.
Note:
Page 37
External Wiring
SECTION VIII- External Wiring
Installation Compliance
All field wiring made during installation must comply with:
- National Electrical Code NFPA 70 and any other national, state, provincial or local codes or requirements.
- In Canada, CSA C22.1 Canadian Electrical Code Part 1, and any other local codes.
WARNING
ELECTRICAL SHOCK HAZARD. Before making any electrical connec­tions to the PRESTIGE Excellence, dis­connect electrical power supply at the service panel. Failure to comply can cause severe personal injury or death.
Line Voltage Connections
1. Connect 120 VAC/15 amp minimum power wire to the 120V terminal strip on the wiring panel below the PRESTIGE Excellence control module, as shown in Fig. 20, page 29.
2. Route the incoming 120 VAC power wire through the provided openings in the bot­tom jacket panel.
3. The unit is provided with a service switch located on the front panel, check local code requirements for compliance.
NOTICE
Thermostat Wiring
NOTICE
Isolate 120V wiring from 24V wiring to prevent any potential electrical “noise”.
1. Connect room thermostat or the end switch (isolated contact only) of a relay control panel to the 24V terminal strip on the wiring panel below the PRESTIGE Excellence control module, as shown in Fig. 20, page 29.
2. For proper operation install the room ther­mostat on an inside wall away from influ­ences of heat and cold, i.e. water pipes, areas of draft, lighting fixtures and fire­places.
3. Set the thermostat anticipator (if applica­ble) as follows:
- Set for 0.2 amps when wired directly to
the Room Thermostat.
- Set to match the total electrical power
requirements of the connected devices when wired to zone relays or other devices. Refer to the relay manufactur­ers’ specifications and the thermostat instructions for additional information on the anticipator setting.
NOTICE
When making low voltage connections to the PRESTIGE Excellence, ensure no external voltage is present in the thermo­stat circuits. If external voltage is pre­sent, provide an isolated contact to pre­vent damage to the boiler control.
If local electrical codes or conditions require an additional service switch, the installer must provide and install a fused disconnect or 15 amp (minimum) service switch.
30
Page 38
24 V
Trans former
by Others
Honeywell V8043
Zone Valves
or Equivalent
Honeywell R8285D Transformer / Relay or Equivalent
24V Terminal Strip
System Circulator
24V Low Voltage Wiring
120V High Voltage Wiring
Room The rmostats
H
N
120V
R
C
G
1
3
4
6
7
8
To Prestige
External Wiring
System Circulator - Zone Valve Application
To energize the system circulator shown as item 12 in Fig. 10 page 19 reference Fig. 21. Installer to provide a Transformer / Relay such as Honeywell R8285 or equivalent and Zone Valves with isolated end switch such as Honewell V8043 or equivalent.
External Modulating Control
The Prestige EXCELLENCE firing rate can be controlled by an external modulating boiler controller. See page 29 for wiring and page 51 for control module setup.
Outdoor Reset Control
1. The PRESTIGE Excellence may operate with a variable boiler operating tempera­ture using the Triangle Tube outdoor sen­sor, see pages 47 through 50 for installation and setup.
NOTICE
If the installer opts for a fixed operating temperature for the boiler system, the outdoor sensor is not required and should not be installed.
Additional 24V Limit Wiring
The PRESTIGE Excellence provides 24V ter­minal connections for additional limit controls as shown in Fig. 20 page 29. These limit ter­minal connections will provide a "hard" lock­out requiring a manual reset of the PRESTIGE Excellence control, or a “soft” lockout in which the PRESTIGE Excellence will auto­matically reset.
Fig. 21: Secondary System Circulator Wiring
31
Page 39
H
N
High Voltage
120
V. A . C .
24
V. A . C .
Room
Thermostat
Room
Thermostat
Zone 1
Zone 2
Additional zones
Additional zones may
be added as shown above
To Prestige
24V Terminal Strip
Transformer
(Power)
Zone
Va l ve
Zone Valve
7
8
To Prestige
24V Terminal Strip
H
N
High Voltage
120
V.A.C.
24
V.A.C.
Room
Thermostat
Room
Thermostat
Zone 1
Zone 2
Additional zones
Additional zones may
be added as shown above
Transformer
(Power)
Zone
Valve
Zone Valve
* Isolation relay
7
8
*Use isolation relay on 3-wire zone valve with non-isolated end switch. Transformer and the Prestige MCBA control can burn out if isolation relay is not used.
NOTICE
External Wiring
4 Wire Zone Valve
3 Wire Zone Valve
Fig. 22: Multiple Zone Field Wiring Using Zone Valves
32
Page 40
T
T
To Prestige
24V Terminal Strip
C
irculator Zone 1
Thermostat
zone 1
H
oneywell R
845A
Relay
120
H
VA C
N
C
irculator
Zone 2
Thermostat
zone 2
Additional zones may be
added as shown above
7
8
6
2
1
4
3
5
6
2
1
4
3
5
T
T
TT
Thermostat
Zone 1
Zone 1 Circulator
120V
N
To Prestige
24V Terminal Strip
Zone 2 Circulator
Zone 3 Circulator
Thermostat
Zone 2
Thermostat
Zone 3
R
C
T1 T1 T2T2T3T3
C3
C3
C2C2C1C1PRPR
X2X1L1L2ZC
H
7
8
External Wiring
Fig. 23: Field Wiring with Zone Circulators.
Fig. 24: Typical Zone Relay Panel Wiring
33
Page 41
Start-Up Preparation
SECTION IX - Start-Up Preparation
Check Boiler System Water Chemistry
WARNING
Do not use petroleum-base cleaning or sealing compounds in the boiler system. Damage to seals and gaskets in the sys­tem components could occur, resulting in substantial property damage.
NOTICE
System water including additives must be practically non-toxic, having a toxicity rating or Class of 1, as listed in Clinical Toxicology of Commercial Products.
Water pH Level 6.0 to 8.0
Maintain the boiler water pH between 6.0 and
8.0. Check using litmus paper or contact a water
treatment company for a chemical analysis.
Flush System to Remove Sediment
The installer must flush the boiler system to remove any sediment to allow proper operation of the PRESTIGE Excellence .
Flush the systems until the water runs clean and is free of sediment.
For boiler zoned systems, each zone should be flushed through a purge valve. Purge valves and isolation valves should be installed on each zone to allow proper flushing of the system.
Check and Test Antifreeze
For boiler systems containing antifreeze solu­tions, follow the antifreeze manufacturer’s instructions in verifying the inhibitor level and to ensure the fluid characteristics are within specification requirements.
Due to the degradation of inhibitors over time, antifreeze fluids must be periodically replaced. Refer to the manufacturer of the antifreeze for additional instructions.
If the pH does not meet this requirement, do not operate the PRESTIGE Excellence or leave the unit filled until the condition is corrected.
Water Hardness Less Than 7 Grains
For areas with unusually hard water (hardness above 7 grains) consult a water treatment company.
Chlorinated Water
Do not use the PRESTIGE Excellence to heat a swimming pool or spa directly.
Maintain the chlorine level of the water at lev­els considered safe for drinking.
NOTICE
System water including additives must be practically non-toxic, having a toxicity rating or Class of 1, as listed in Clinical Toxicology of Commercial Products.
34
Page 42
Star-Up Preparation
Use of Antifreeze in the Boiler System
WARNING
NEVER use automotive or ethylene gly­col antifreeze or undiluted antifreeze in the primary system as freeze protection. This can cause severe personal injury, death or substantial property damage if ignored.
Determine the antifreeze fluid quantity using the system water content volume and following the antifreeze manufacturer instructions.
The water volume of the PRESTIGE Excellence is approximately 5 gallons (includes Boiler and DHW outer tank). Remember to include the vol­ume of the expansion tank.
Check with local codes requirements for the installation of backflow preventers or actual disconnect from the boiler’s cold water fill or make up water supply line.
CAUTION
Ensure the domestic inner tank of the PRESTIGE Excellence water heater is properly filled and pressurized prior to filling the boiler system. Reference the PRESTIGE Excellence water heater for proper guidelines on filling the inner tank. Failure to comply could result in damage of the inner tank.
Filling the Boiler System
1. Close the boiler drain valve located on the bottom of the unit and any manual or auto­matic air vent in the system.
2. Open all system isolation valves.
3. Fill the boiler system to correct system pressure. Correct pressure will vary with each application.
NOTICE
NOTICE
Massachusetts Code requires a pressure reducer/backflow preventer if antifreeze is used.
Ensure the concentration of antifreeze to water does not exceed a 50/50 ratio.
NOTICE
System water, including additives, must be practically non-toxic, having a toxicity rating or Class of 1, as listed in Clinical Toxicology of Commercial Products.
Typical residential system fill pressure is 12 psi. System pressure will increase when system temperature increases. Operating pressure of the system should never exceed 25 psi.
4. Purge air and sediment in each zone of the boiler system through the purge valve. Open air vents to allow air to be purged in the zones.
5. Once the system is completely filled and purged of all air and sediment, check the system pressure and check/repair any leaks.
WARNING
Unrepaired system leaks will cause con­tinual makeup water to be added to the boiler. Continual makeup water could cause mineral buildup within the heat exchanger, reducing the heat transfer, causing possible heat buildup and even­tual heat exchanger failure.
35
Page 43
Start-Up Preparation
Check Low Water Cut-Off Device
- The PRESTIGE Excellence is provided with a factory installed LWCO device that measures system pressure of more than 10 psi.
- Remove the front jacket panel and check for continuity across the low water cut-off device wire terminals. The contacts should be closed when system pressure is greater than 10 psi. See item 5, on Fig. 27 page 63.
Check For Gas Leaks
WARNING
Prior to start-up and during initial opera­tion, smell near the floor and around the unit for gas odorant or any unusual odor. Do not proceed with the start-up if there is any indication of a gas leak. Any leaks found must be repaired immediately.
WARNING
Propane installations only - The propane supplier mixes an odorant with the propane to make its presence detectable. In some cases the odorant can fade and the gas may no longer have an odor.
Prior to start-up of the unit and periodi­cally after start-up have the propane supplier check and verify the odorant level.
Check Thermostat Circuit
- Disconnect the external thermostat wires from the 24V terminal strip on the wiring panel.
- Connect a voltmeter across the wire ends of the external thermostat wiring.
- There should NEVER be voltage measured
at the wire ends.
- If voltage is measured at the panel under any condition, check and correct the external wiring.
NOTICE
In systems using 3-wire zone valves, backfeed of voltage to the unit is a com­mon problem. Use an isolation relay to prevent voltage from the external circuit entering the PRESTIGE Excellence con­trol panel.
- Reconnect the external thermostat
wires to the 24V terminal strip on the wiring panel.
Inspection of Condensate Drain Assembly
1. Inspect and ensure the condensate drain assembly is properly installed as described on page 22 and shown in Fig. 15 on page 23.
2. Remove the plug from the condensate drain assembly and fill the trap with fresh water.
NOTICE
The condensate drain assembly must be filled with water when the PRESTIGE Excellence is in operation. The conden­sate drain assembly prevents flue gas emissions from entering the condensate line. Failure to ensure trap is filled with water could result in severe personal injury or death.
3. Re-Install plug in condensate drain assem­bly.
- Close each thermostat, zone valve and relay in the external circuit one zone at a time and check the voltage reading across the wire ends.
36
Page 44
Start-Up Procedures
SECTION X - Start-Up Procedures
Final Checks Before Start-Up
c Read page 42 through 45 regarding the
operation of the PRESTIGE Excellence control.
c Verify the PRESTIGE Excellence and the
boiler system is full of water and all system components are correctly set for operation, including the minimum flow rate through the boiler, see page 70.
c Verify Start-Up Preparation items outlined on
pages 34 thru 36 have been completed.
c Verify all electrical connections are correct
and securely fastened.
c Inspect vent piping and combustion air inlet
piping for signs of deterioration from corro­sion, physical damage or sagging. Verify combustion air piping and vent piping are intact and correctly installed and supported. Reference the PRESTIGE Vent Supplement.
c Verify burner configuration - Propane only.
- Check for proper labeling on the gas valve and the rating label for propane configuration.
- If there is doubt on the burner configu­ration, remove the gas valve and check for proper propane orifice size 0.204” (#52). Refer to Fig. 17, page 27 for location of the propane orifice.
If PRESTIGE Excellence Does Not Start Correctly
1. Verify DHW (parameter 2) and CH (para­meter 3) Systems are turned ON or set to “01”. Read the Boiler Display Standby and Parameter Section of the manual starting on page 42 for more information.
2. Check for loose electrical connections, blown fuse (external or internal to the MCBA Control) or open service switch.
3. Check continuity across the L.W.C.O device for a closed circuit. See item 5 on Fig. 27, page 63.
4. Is the external limit control (if applicable) open? Ensure the external limit is reset to the closed position.
5. Is the gas supply valve(s) open at the unit and meter?
6. Is incoming gas supply pressure at the unit more than 5”w.c. and less than 13” w.c. for natural or propane with all gas appliances operating ON or OFF
7. Are the heating thermostats set below room temperature?
If none of these conditions correct the problem, refer to the PRESTIGE Trouble-Shooting Guide or contact Triangle Tube Tech Service.
Check the PRESTIGE Excellence and System
c Ensure the Condensate Drain Assembly is
filled with water.
PRESTIGE Excellence Start-Up
1. Turn the ON-OFF switch located on the front control panel to the OFF position. Turn the electrical supply or any service switch to the unit in the ON position.
2. Read and follow the Operating Instructions outlined on page 39.
c Check Boiler Piping.
Check Boiler system piping and com­ponents for leaks. If found, shut down the unit and repair immediately.
Purge any remaining air from the system piping. Air in the system piping will interfere with circulation creating heat distribution problems and system noise.
c Check Vent Piping and Combustion Air
Piping.
Check for gas-tight seal at every con­nection and seam of the venting and combustion air inlet piping.
37
Page 45
O2 Min.
O2 Max.
CO2 Min.
CO2 Max.
CO Max
Natural Gas
2.30%
5.30%
8.80%
10.50%
100 ppm
Propane
2.70%
4.70%
10.70%
12.00%
100 ppm
Start-Up Procedures
WARNING
Venting system must be sealed gas-tight to prevent flue gas spillage and potential carbon monoxide emissions, which will result in severe personal injury or death.
c Check Gas Piping
Check around the unit for gas odor fol­lowing the procedure outlined in this manual on Page 36.
WARNING
If any gas leaks are found or suspected, shut the unit down immediately. Use a gas detection device or bubble test to locate the source of the gas leak and repair at once. Do not operate the unit until the leak is corrected. Failure to comply with this procedure could result in severe personal injury, death or sub­stantial property damage.
WARNING
The combustion levels should be mea­sured at high firing rate, refer to page 42 of the PRESTIGE Excellence control section on how to set the firing rate. If the combustion levels are not within the range given in Table 2 for the firing rate, shut the boiler down and contact Triangle Tube Engineering Department. Failure to comply with this requirement could result in severe personal injury, death or substantial property damage.
c Measure Input - Natural Gas Only
Table 2: Recommended Combustion Levels
c Verify Flame Pattern and Combustion
Check the flame pattern through the inspection port of the heat exchanger. The flame should be blue and stable. The flame should be the length of the burner head openings.
WARNING
The combustion testing and adjustments must be performed by a qualified installer, service agency or the gas suppli­er. All combustion measurements must be perform with calibrated equipment to ensure proper reading and accuracy.
Test for CO2 or O2 and for CO during high firing rate. To manually place the boiler into high fire mode, reference page 42, the combustion reading should be within the range listed in Table 2.
The CO level should not exceed 100 ppm when combustion is correct.
1. Ensure the boiler is firing at maximum firing rate. To manually place the boiler into high fire mode, reference page 42.
2. Operate the unit for approximately 10 minutes.
3. Turn off all gas appliances within the build­ing, except the PRESTIGE Excellence.
4. At the gas meter, record the time required to use one cubic foot of gas.
5. Calculate Natural gas input using the fol­lowing equation:
3600 x 1000 / number of second recorded for one cubic foot of gas = BTU/H.
6. The BTU/H calculated should approximate the input rating listed on the unit.
38
Page 46
Start-Up Procedures
FOR YOUR SAFETY READ BEFORE LIGHTING
WARNING
A. This appliance does not have a pilot. It is
equipped with an ignition device which automat­ically lights the burner. DO NOT try to light the burner by hand.
B. BEFORE OPERATING, smell all around the
appliance area for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor.
WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electric switch; do not use any phone in your building
•Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
may result causing property damage, personal injury or loss of
OPERATING INSTRUCTIONS
1. STOP! Read the safety information above. This
appliance is equipped with an ignition device which automatically lights the burner. DO NOT try to light the burner by hand.
2. Set room thermostat(s) to lowest setting. Turn the external manual gas valve handle clockwise
“CLOSE” (valve handle shall be perpen-
dicular to gas piping).
3. Turn the service switch on the PRESTIGE Excellence control panel OFF.
4. Remove the front jacket panel on the unit.
5. Turn the external manual gas valve handle counter clockwise to “OPEN” gas supply (valve handle shall be parallel to gas piping).
6. Wait five (5) minutes to clear out any gas. If you then smell gas in the jacket enclosure or around the unit, STOP! Follow “B” in the safety infor­mation above. If you don’t smell gas, go to the next step.
If you do not follow these instructions exactly, a fire or explosion
• If you cannot reach your gas supplier, call the fire department.
C. Use only your hand to turn the external manual gas
valve. Never use tools. If the valve will not turn by hand, don’t try to repair it; call a qualified ser­vice technician. Force or attempted repair may result in a fire or explosion.
D. Do not use this appliance if any part has been
under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas con­trol which has been under water.
7. Turn the service switch on the PRESTIGE con­trol panel “ON”.
8. Set room thermostat(s) to desired setting(s).
9. The PRESTIGE Excellence control panel display will show a sequence of numbers (0,1, 2,3, 4,etc.) as the left digit. Sequence digit 3 or 4 indicates the boiler is firing. Sequence digit 0 means there is no call for heat (all external thermostats are satis­fied).
10. If the unit will not operate with a call for heat and the system piping is not hot, follow the instructions “To Turn Off Gas to Appliance”, below and call your ser­vice technician or gas supplier.
11. Replace the front jacket panel. Make sure the panel is seated firmly in place and all mounting screws are tight­ened.
TO TURN OFF GAS TO APPLIANCE
1. Set the room thermostat to lowest setting.
2. Turn the service switch on the PRESTIGE Excellence control panel to “OFF”
3. Turn the external manual gas valve handle clock­wise to “CLOSE”.
39
Page 47
Start-Up Procedures
Set Boiler CH Target Temperature
1. Press the MODE button until the display shows PARA. This is the parameter mode of the control.
2. Press the STEP button until the first digit on the display shows "4". The last three digits on the display shows the outlet water temperature setting (high limit).
3. Press the "+" or "-" button to change the setting of the outlet temperature (high limit).
NOTICE
If an outdoor sensor is used, then the set­ting of the Boiler CH Target temperature is the target temperature when the out­door temperature is at or below 0ºF. When the outdoor temperature is higher than 0ºF the PRESTIGE Excellence con­trol will calculate the target temperature between the minimum and maximum temperature settings.
4. Press the "STORE" button to save the setting.
4. The following displays should occur:
U1.22] Software version
[
A140] Self check on power up
[
0140] No call for heat
[
NOTICE
If the water heater storage temperature is below the setpoint of Parameter 1, the boiler will operate in DHW mode until setpoint is reach. Once the DHW mode is complete, proceed to step 5.
5. Initiate a call for heat by raising the set point of the room thermostat to the highest setting. The following display should occur.
5140] This is a fan / air flow check. The
[ burner blower will be energized momentar­ily prior to the prepurge cycle.
1140] This is the prepurge cycle. The
[ boiler blower and the CH (Central Heating) circulator become energized. The blower has a 10 second prepurge cycle.
Operation Verification - Space Heating
NOTICE
Digits and characters shown as [ in the following outline, represent the control panel display. The last three dig­its on the display is the measured boiler water temperature and may differ from what is shown in the manual.
1. Refer to Set DHW Storage Temperature outline on page 41 and set the DHW to 68 from the factory setting of 140.
2. Set the room thermostat to the lowest setting.
3. Turn off power to the boiler, wait a few seconds and turn on power to the boiler.
0000
2140] This is the ignition cycle. The con-
[ trol module will energize and open the gas valve and begin the spark for ignition.
- If the burner flame proves the burner will continue to fire at an ignition fan speed for approximately 10 seconds to
],
stabilize the flame.
- If the burner flame is not proven the control module will repeat the ignition sequence. If the flame is not proven after 5 attempts the control will lockout and the display will show [
- To verify flame failure lockout, close the manual shut off valve on the gas supply piping to the boiler and repeat ignition sequence. When verification is completed, ensure the manual shut off valve is returned to the open position.
E-02]
40
Page 48
Start-Up Preparation
[3140] This is the normal CH operation cycle. After the flame is proven and stabi­lized the burner will fire at low input for approximately 1 minute. After this time period, the control module will begin to modulate the burner firing rate based on actual boiler outlet temperature and the set point temperature.
6. Allow the boiler to operate and allow the boiler outlet temperature to reach the set point temperature.
6180] This begins the burner shutdown
[ and post purge cycle. The CH circulator will continue to run until the room thermo­stat is satisfied.
7. Lower the room thermostat set point below the room temperature to end the call for heat.
1180] This begins a post purge cycle.
[ When the room thermostat is satisfied, the boiler will shutdown. The control module will close the gas valve and the blower will continue for 30 seconds for a post purge cycle before shutting down. If another call for heat is initiated, the boiler will remain off for an additional 30 seconds before starting a new ignition sequence.
7180] The CH circulator will continue
[ for a 1 minute post pump cycle.
8. Verify the operation of the boiler by repeat­ing the operational sequence several times.
9. Return the room thermostat to a desired set­ting.
Set DHW Storage Temperature
3. Press the “+” or “-” button to change the setting of the DHW storage temperature.
NOTICE
The DHW outlet temperature is con­trolled by the factory supplied mixing valve. A low DHW storage temperature will affect the overall listed DHW perfor­mance.
4. Press the “STORE” button to save the set­ting. Press the “MODE” button until the display shows “STBY”
Operation Verification - Domestic Hot Water
1. As outlined in the verification for space heating, repeat STEPS 2 through 4.
2. Reference Set DHW Storage Temperature outline and set the DHW to the factory set­ting of 140ºF. A DHW call for heat should be initiated and the following display should occur.
5180] This is a Fan/Air Flow Check. The
[ burner blower will be energized momentar­ily prior to the pre-purge cycle.
1180] The prepurge cycle. The boiler
[ blower and CH circulator become ener­gized and the 10 second pre-purge cycle begins.
2180] The boiler will begin the ignition
[ sequence. The same sequence of establish­ing flame, trail for ignition and attempts for ignition as described in the space heating applies for domestic hot water.
1. Press the mode button until the display shows “PARA”. This is the Parameter mode of the control.
2. Press the STEP button until the first digit on the display shows “1”. The last three digits on the display shows the DHW stor­age temperature setting.
4180] This indicates normal operation
[ for DHW. The burner will begin modulat­ing its input based on the length of demand by the DHW setting. The burner will not go into the low input rate for the 1 minute flame stabilization period that occurs in CH mode.
41
Page 49
S
tb
Y
Start-Up Procedures
3. Lower the DHW storage temperature as outlined in Set DHW Storage Temperature to satisfy the call for heat.
[1180] The post purge cycle begins. The control module closes the gas valve and the blower continues for a 30 second post purge.
8180] The DHW will continue for a 30
[ second post pump cycle. If another DHW call for heat is initiated the boiler ignition sequence will begin immediately.
0180] Boiler is in standby MODE wait-
[ ing for a CH or DHW call for heat.
4. Verify the DHW operation of the boiler by repeating the outline operation sequence several times.
5. Return the DHW storage temperature and room thermostat to the desired setting.
Boiler Control Display
Standby Mode
This is the standard mode for the PRESTIGE Excellence. The control automatically returns to this mode after 20 minutes if no keys have been pressed on the display. Any parameters that were modified are then stored.
The first character shows (on left side of dis­play) the current status of the boiler depending on the condition of both the boiler and the burner. The last 3 characters indicate the boiler supply temperature.
If the burner is blocked due to a “soft” lockout, the display alternates between a 9 followed by the boiler supply temperature and a “b” with a two digit error code.
TO TEMPORARILY PLACE THE BURN­ER INTO HIGH FIRE TEST MODE: press
the MODE button until “ Then press and hold both the MODE and “+” button simultaneously until the first digit flash­es “H”.
StbY” is displayed.
While in the test mode:
- high limit will function
- boiler circulator will function
- Internal 3-way valve will be diverted to CH MODE.
- the test mode will time out in approxi­mately 10 minutes
42
Page 50
STANDBY, no demand for heat
F
an prepurge or post purge cycle
Ignition sequence
Burner ON for space heating (CH)
Burner ON for domestic hot water (DHW)
Pre-check for air flow prior to prepurge cycle
Burner OFF due to reaching temperature setpoint
Domestic hot water (DHW) post pump cycle
Space Heating (CH) post pump cycle
Burner blocked:
Supply temperature too high (202 F) . Burner will remain OFF until temperature drops below 200 F
Return temperature too high (202 F). Burner will remain OFF until temperature drops below 200 F
Return temperature is higher than supply temperature. Burner will remain OFF until corrected.
Supply temperature increased too quickly. Burner will remain OFF for a 10 minute period. Burner will recycle, increasing waiting period 1 minute for a max. 15 minutes
Factory supplied LWCO device or external limit (terminals 15 & 16) is OPEN. Burner off for 150 seconds, auto reset.
0 1
1 8
0
1 8
0
1 8
0
1 8
0
1 8
0
1 8
0
1 8
0
1 8
0
1 8
0
1 8
0
2 3 4
5 6 7 8 9
1
8
b
1
9
b
2
4
b
2
5
b
2
6
b
2
D
isplay
Boiler function
No blower signal
Blower signal present with no demand, Burner will remain OFF until condition terminates
Temperature difference between the supply and return is more than 72 F. Burner will remain OFF for 150 seconds. Burner will recycle increasing wating period 1 minute for a max. 20 cycle.
Flue temperature sensor is short-circuited. Burner OFF until corrected
Flue temperature senor is “open” Burner OFF until corrected.
Flue temperature greater than 240 F but less than 250 F. Burner off for 150 seconds
Wait for the blower to start
8
b
2
2
9
b
3
0
b
3
5
b
4
0
b
Indirect water heater temperature sensor is short-circuited. Burner OFF until corrected.
Indirect water heater temperature sensor is “open” or disconnected. Burner OFF until corrected.
3
3
b
3
8
b
5
2
b
6
5
b
Power frequency deviation
1
1
6
b
Flame current signal lost
1
8
b
1
Test function: Burner on, high fire mode
Test function: Burner on, low fire mode
18
0
18
0
H
L
Display
Boiler function
Start-Up Procedures
TO TEMPORARILY PLACE THE BURN­ER INTO LOW FIRE TEST MODE: press
the MODE button until “ Then press and hold both the MODE and “-” button simultaneously until the first digit flash­es “L”.
TO DEACTIVATE THE HIGH OR LOW FIRE TEST MODE: Press and hold the “+”
and “-” button simultaneously to deactivate the high or low fire test mode. While in the
StbY” mode:
NOTICE
If the “+” button is held in the CH sys­tem (parameter 3) will be turned OFF and the display will show Press and hold the “+” button to turn the CH system back ON, the display will show “c” followed by CH set point tem­perature (parameter 4) or CH target temperature. If the “-” button is held in while in the system (parameter 2) will be turned OFF and the display will show Press and hold “-” button to turn the domestic system back ON, the display will show “d” followed by domestic set point temperature (parameter 1)
Standby Mode Display
StbY” is displayed.
cOFF”.
StbYmode domestic
dOFF”.
43
Page 51
AR
A
P
AR
A
P
MODE
NF
O
I
MODE
Key:
Display
Pressing MODE once
Pressing MODE twice
Domestic Hot Water Setting (See Note 1)
Domestic Hot Water Setup (See Note 2)
Space Heating Mode (See Note 3)
Maximum temperature in space heating (CH) mode. In applications using an outdoor sensor, this is the boiler outlet target temperature at an outdoor temperature of 0 F or below.
1. 2
1 4
0
0
1
0
1
8
1
0
3
4
.
.
.
.
STEP
STEP
STEP
STEP
Key:
Display
Description of parameters
AR
A
P
MODE
Key:
Display
Pressing MODE once
Start-Up Procedures
Setting The Boiler Parameters
Parameter mode
Note 1: This parameter is factory set to 140ºF.
It is important to note the control adds 46ºF to this setting, therefore the actual domestic hot water setting is 140ºF + 46ºF = 186ºF.
To access PARAMETER mode when the sys­tem is in STANDBY mode, press the MODE button once.
To scroll through the list of parameters, simply press the “STEP” button. The first digit is the parameter number followed by the parameter value. To modify a parameter value, use the + or - keys. Then press “STORE” to save the value you just changed. The display flashes once to confirm the data has been stored.
To activate the parameters you changed, press RESET. However, if you do not press a key, the system returns to STANDBY mode after 20 minutes and automatically stores the changes.
Note 2: This parameter should not be changed from the factory setting of “01”. The perfor­mance of the DHW will be affected and can become unreliable.
Note 3: This parameter should not be changed from the factory setting of “01”. The perfor­mance of the CH (Central/Space Heating) will be affected and can become unreliable.
44
Page 52
Start-Up Procedures
NF
O
I
AR
A
P
MODE
NF
O
I
MODE
Key:
Display
Pressing MODE once
Pressing MODE twice
J
1
2
.3
4
.5
6
Accessing Boiler Information
Information mode
To switch from STANDBY mode to INFOR­MATION mode, press MODE twice.
Press STEP until the system displays the infor­mation you need. The point located behind the first position flashes to indicate that the boiler is in INFO mode.
Information Mode Items
NOTICE
The ignition counters and burner hours are split into three two digit numbers. For example:
Write the numbers down from left to right to arrive at 123,456 CH ignitions.
NOTICE
In the INFO Mode a temperature read­ing of -22 typically indicates an “open” circuit. A temperature reading of 240 typically indicates a short-circuit.
Display Digit
Segments
45
Page 53
G
as valve harness not properly connected
Failed ignition after 5 attempts
Power supply lost after lockout occured
Internal control failure
Internal control failure
E E
0
2 03 0
4
0
8
0
9
E E
E
Display
H
ard Lockout
Internal control failure
0
5
E
Internal control failure
0
6
E
Internal control failure
0
7
E
F
lame detected prior to burner startup
E
0
0
Internal control failure
E
xternal limit (terminals 13 & 14) is OPEN
Blower signal does not reset to zero
No blower signal present
Supply Temperature sensor is short circuited
1
1
1
2
1
5 1
6
2
9
2
8
E
E E
E
E
E
Flue Temperature exceeds 250 F
5
2
E
Internal control error - failure to read parameters
6
1
E
Return Temperature sensor is short circuited
Supply Temperature sensor is OPEN
Return Temperature sensor is OPEN
Internal control failure
Internal control failure
Inadequate power supply to the fan
E E
3
1
32
3
6
3
7
4
4
60
6
5
E
E
E
E E
Flue Temperature sensor is short circuit
4
0
E
Return Temperature exceeds 212 F
Supply Temperature increased too rapidly
Internal control failure
Contact Triangle Tube Service Department
I
nternal control failure
Internal control failure
Internal control failure
1
7
1
9
2
5
1
3
E
E
E
E
Supply Temperature exceeds 212 F
1
8
E
Return Temperature is higher than supply temperature
2
4
E
E
1
4
Flue Temperature sensor is OPEN
3
5
E
E
Internal control failure
1
5
E
Supply or Return Temperature sensor drift
2
3
Invalid power frequency
Supply or Return Temperature failure
Supply or Return Temperature not changing
1
31 1 1 1 1
22
2
4
E
E E
Start-Up Procedures
Error (Hard Lockout) Mode
If a system fault occurs while the boiler is run­ning, the system goes into lockout and the dis­play starts to flash with the first digit as an E and the next two digits give the code for this fault.
For a detailed description of the error codes, ref­erence the PRESTIGE Troubleshooting Guide.
CAUTION
The boiler freeze protection feature is disabled during a Hard Lockout, howev­er the CH circulator will operate and the 3-way valve will open to the CH system.
CAUTION
During a hard lockout or low water con­dition the boiler will not re-start without service. If the heating system is left unat­tended in cold weather appropriate safe­guards or alarms should be installed to prevent property damage.
46
Page 54
Outdoor Reset Control
SECTION XI - Outdoor Reset Control
The boiler setpoint for a heating call can be fixed or vary with the outdoor temperature. If the application requires a constant supply tem­perature from the boiler, the outdoor tempera­ture sensor should not be connected to the boil­er. If an outdoor temperature sensor is con­nected to the boiler, the outdoor reset function is automatically enabled and will vary the CH setpoint with the change in outdoor tempera­ture. The outdoor reset function has no affect on the DHW setpoint during a domestic call.
4. Mount the sensor enclosure at an elevation on the exterior wall to prevent accidental damage or tampering.
5. Avoid mounting the enclosure in areas sub­jected to excessive moisture.
6. Once an area on the exterior wall has been determined, to affix the enclosure use the enclosure as a template to mark the location of the mounting screws.
7. Using a 3/16” drill bit, drill 2 pilot holes on the marked locations.
8. Tap the enclosed plastic anchors into the pilot holes. Use care not to damage the anchors.
9. Mount the sensor enclosure using the screws provided.
Wiring the Sensor
1. Remove the sealing nut and sealing gasket from the sensor enclosure.
Fig. 25: Sensor Enclosure and Components
Mounting the Outdoor Sensor
1. Remove the front cover and mounting screws / anchors from the sensor enclosure.
2. When mounting the enclosure the exterior wall selected should represent the heat load of the building. Typically a northern or northeastern wall will suit most buildings. A southern facing wall may suit buildings that have large glass walls or windows on the southern face.
3. Ensure the sensor enclosure is shielded from direct sunlight or the effects of heat or cold from other sources (exhaust fans, appliance vents...) to prevent false temper­ature sensing.
2. Route two 18 gauge wires through the seal­ing nut and gasket. Connect the wires to the sensor terminals 1 and 2.
3. Re-insert the sealing gasket and tighten the sealing nut to the sensor enclosure.
4. Route the sensor wire back to the PRES­TIGE Solo boiler, ensuring the wires are not run parallel to telephone or power cables.
NOTICE
If the sensor wires are located in an area with sources of potential electromagnetic interference (EMI) the sensor wires should be shielded or the wires should be routed in a grounded metal conduit. If using shielded cable, the shielding should be connected to the common ground of the unit.
5. Connect the sensor wires to the outdoor sen­sor terminals on the 24V terminal strip locat­ed inside the boiler enclosure (see boiler wiring diagram, Fig. 20 page 29).
47
Page 55
Outdoor Reset Control
Summer / Winter Switch at Boiler
If required the CH (Central Heating) system can be turned off at the boiler, similar to manual summer / winter switch by press/hold the “+”
button while in will show “cOFF”. Press/hold the “+” button to
turn the CH system back on, the display will show “c” followed by CH set point temperature (Parameter 4) or CH target temperature.
WARNING
If a parameter setting is changed but the STORE button is not pressed to save the setting, the MCBA will automatically store the setting after 20 minutes. Ensure all parameters are at their factory set­tings or appropriately revised for the application prior to commissioning the boiler. Failure to comply could result in erratic or unreliable operation of the Prestige boiler.
the “StbY” mode, the display
CH Maximum Boiler Operating Setpoint (Parameter 4)
If an outdoor temperature sensor is not con­nected to the boiler, the boiler setpoint for a heating call will be set to the CH Maximum Boiler Operating Setpoint. If an outdoor tem­perature sensor is connected, the CH Maximum Boiler Operating Setpoint becomes the boiler setpoint on the CH Reset Curve Coldest Day. The outdoor temperature can be monitored on the boiler display via item 4 of the INFO menu.
CH Minimum Boiler Operating Setpoint
(Parameter 10)
NOTICE
Once a parameter setting has been revised and stored pressing the STEP button will display the setting of the next parameter without showing P_XX. To avoid confusion, it is advisable to contin­ue pressing the STEP button until Parameter 46 is reached. The next press of the STEP button will cause the display to roll over to Parameter 1. Continue pressing the STEP button until the next parameter to be adjusted is reached and revise the setting.
Adjusting Outdoor Reset Curve
Parameters 4, 10, 11, & 12 define the settings of the outdoor reset curve. See Graph 1 and Table 3, page 50 for an example of modifying the outdoor reset curve.
This parameter is not applicable if an outdoor sensor is not connected to the boiler. When an outdoor temperature sensor is connected, the CH Minimum Boiler Operating Setpoint becomes the boiler setpoint on the CH Reset Curve Warmest Day.
CH Reset Curve Coldest Day (Parameter 11)
This parameter is not applicable if an outdoor sensor is not connected to the boiler. When an outdoor temperature sensor is connected, the CH Reset Curve Coldest Day is the coldest design temperature of the heating system.
48
Page 56
Outdoor Reset Control
CH Reset Curve Warmest Day (Parameter 12)
This parameter is not applicable if an outdoor sensor is not connected to the boiler. When an outdoor temperature sensor is connected, the CH Reset Curve Warmest Day is the warmest design temperature of the heating system.
Entering MCBA Access Code
The installer must enter the MCBA Access Code to adjust the advanced parameter settings of the MCBA. The Access Code can be entered as follows:
1. Press the MODE button until the display shows
2. Press and hold the MODE and STEP but­tons together for 2 to 3 seconds until the display shows
3. Press the STEP button once and the display will show random number.
4. Press the “+” or “–“ buttons to change the number displayed to read and hold the “+” or “–“ button to rapidly change the number.
STbY.
C_
CODE.
XX
where
XX
represents a
C_54.. Press
Press STEP once­Press STEP x2 - 2_01 Press STEP x3 - 3_01 Press STEP x4 - 4186 Press STEP x5 - P_10
Press STEP x6 - P_11 Etc......
After Parameter 4, the display will show P fol­lowed by the parameter number. Once a par­ticular parameter is reached, the display will change to show the current setting of that para­meter.
NOTICE
The actual parameter values displayed on the display may vary depending on the application, but the sequence will always occur in the order shown.
Changing a Parameter Setting
1. Use the “+” or “–“ button to change the parameter setting.
2. Press the STORE button to save the change. The display should flash to indi­cate that the change was saved.
3. Press the RESET button to leave the Access Code mode.
1140
5. When the display reads STORE button to save the Access Code. The display should flash to indicate that the Access Code was saved.
After the Access Code has been entered, the advanced parameters can be accessed by press­ing the MODE button until the display shows
C_54, press the
PARA. Once the display shows PARA, press
the STEP button to reach the appropriate para­meter. The display should follow the following sequence:
49
Page 57
90
20
60
100
140
180
70
64
50
30
10 0
-10
86
Boiler Temperature ( F)
Outdoor Air Temperature ( F)
Parameter 4 Set Point
Parameter 10
Set Point
Parameter 12 Setting
Parameter 11 Setting
Outdoor Reset Control
Graph 1: Outdoor Air Temperature Reset Curve (Example)
Table 3: Outdoor Air Temperature Reset (Example)
Graph 1 illustrates Parameter 4 adjusted to 140ºF target temperature at 0ºF outdoor air temperature.
Note: Factory setting of Parameter 4 is 186ºF.
50
Page 58
External Modulating Control
SECTION XII - External Modulating Control
The boiler can directly accept an analog 0-10 VDC signal to control the firing rate from an external modulating boiler controller.
Wiring the Modulating Controller
Run two 18 gauge wires from the external modulating boiler controllers 0-10 VDC boiler output to the external input terminals on the low voltage terminal strip inside the boiler. (see boiler wiring diagram, Fig. 20 page 29). This signal will both enable and modulate the boil­er. No wiring is required at the thermostat (T­T) terminals 7 and 8 of the boiler.
NOTICE
Ensure that the polarity of the connec­tions from the external modulating boil­er controller to the boiler is correct. Reversed polarity could lead to erratic and/or no response from the boiler con­troller.
NOTICE
Ensure that Parameter 4 is set above the highest setpoint of the external modulat­ing control. Parameter 4 is a boiler high temperature limit when using an exter­nal modulating controller.
Programming of External Modulating Control
The external modulating control must be pro­grammed to send 1.8 VIC to enable the boiler and run it at low fire, and 10 VIC to run the boiler at high fire. Once the control enables the boiler, it must wait 2 minutes to allow the burn­er to stabilize before modulating the boiler.
Parameter Adjustment
The Prestige MCBA control module must be programmed to accept the 0-10 VDC signal from the external modulating boiler control.
CH Operating Signal Section (Parameter 45)
Follow the procedure for entering the MCBA Access Code on page 49, and then change the setting of Parameter 45 from the factory setting of 00 to 02.
51
Page 59
External Modulating Control
Factory Setting Parameters
52
Page 60
Check-Out Procedures
SECTION XIII- Check-Out Procedures
NOTICE
Perform the following check-out proce­dures as outlined and check off items as completed. When procedures are com­pleted, the installer should complete the installation record on page 53.
Check-out Procedures
c Boiler system water chemistry checked and
verified as outlined on page 34.
c The boiler air vent and any automatic air
vents placed within the system are open one full turn.
c Air is purged from the heating zones and
boiler system piping.
c Burner has been confirmed as properly
configured for Propane application, as out­lined on page 26 (If applicable).
c Checked and verified room thermostat(s)
function properly and the thermostat(s) heat anticipator (if used) was properly set.
c Observed several operating cycles for
proper operation of the PRESTIGE Excellence and the system.
c Set the room thermostat(s) to the desired
room temperature.
c Reviewed all instructions shipped with the
PRESTIGE Excellence with the homeown­er or maintenance personnel.
c Completed the Installation Record on page
54.
c Ensure all manuals and other documentation
are returned to the Installation envelope and given to the owner for safekeeping.
c Thermostat circuit wiring checked and ver-
ified that no voltage is present to the low voltage terminals as outlined on page 36.
c Operating Instructions on page 39 were fol-
lowed during start-up.
c Combustion levels and flame pattern veri-
fied as outlined on page 38.
c Measured the rate of input on Natural Gas
as outlined on page 38.
c Checked the incoming gas pressure to the
PRESTIGE to ensure a minimum pressure of 5”w.c during flow conditions to all gas appliances and a maximum pressure of 13”w.c during non-flow conditions for Natural and Propane.
c Adjusted balancing valves and system limit
controls to provide design temperatures to the primary space heating system.
c In multiple zone applications, adjusted for
correct flow of boiler water to each zone.
53
Page 61
PRESTIGE Excellence Model Number:
Serial Number:
Date of Installation:
Fuel: Natural Gas Propane
Measured Rate of Input:
Combustion Readings:
CO
2
O2
CO
The following items were completed during installation:
Installation instructions have been followed and completed
Check-out procedures have been followed and completed
Information regarding the unit and installation received and left with owner / maintenance personnel.
Installer Information
(Company)
(Address)
(Address)
(Phone Number)
Btu/hr
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
_________________________________________________________________
%
%
ppm
Installation Record
SECTION XIV - Installation Record
54
Page 62
Maintenance Schedule
SECTION XV - Maintenance Schedule
Service Technician
At least on an annual basis the following main­tenance should be performed by a qualified ser­vice technician:
General
- Attend to any reported problems.
- Inspect the interior of the boiler jacket area; clean and vacuum if necessary.
- Clean the condensate drain assembly and fill with fresh water.
- Check for leaks: water, gas, flue and con­densate.
- Verify flue vent piping and air inlet piping are in good condition, sealed tight and properly supported.
- Check boiler water pressure, piping and expansion tank.
- Check control settings.
Owner Maintenance
Periodically:
- Check the area around the unit.
- Check and remove any blockage from the combustion air inlet and ventilation open­ings.
- Check the temperature/pressure gauge.
Monthly:
- Check vent piping.
- Check combustion air inlet piping.
- Check the pressure relief valve.
- Check the condensate drain system.
Every 6 months:
- Check boiler piping and gas supply piping for corrosion or potential signs of leakage.
- Operate the pressure relief valve.
- Check ignition electrode (sand off any white oxide; clean and reposition).
- Check ignition wiring and ground wiring.
- Check all control wiring and connections.
- Check burner flame pattern (stable and uni­form) and flame.
Additional items if combustion or performance is poor:
- Clean heat exchanger and flue ways.
- Remove burner assembly and clean burner head using compressed air only.
Once the maintenance items are completed, review the service with the owner.
WARNING
Follow the maintenance procedures given throughout this manual. Failure to perform the service and maintenance or follow the directions in this manual could result in damage to the PRES­TIGE Excellence or in system compo­nents, resulting in severe personal injury, death or substantial property damage.
55
Page 63
Maintenance Schedule
SECTION XVI - Maintenance Procedures
Maintenance Procedures
WARNING
The PRESTIGE Excellence should be inspected and serviced annually, prefer­ably at the start of the heating season, by a qualified service technician. In addi­tion, the maintenance and care of the unit as outlined on page 55 and further explained on pages 56 through 61 should be performed to assure maximum effi­ciency and reliability of the unit. Failure to service and maintain the PRESTIGE Excellence and the system components could result in equipment failure, caus­ing possible severe personal injury, death or substantial property damage.
NOTICE
The following information provides detailed instruction for completing the maintenance items outline in the mainte­nance schedule on page 55. In addition to this maintenance, the PRESTIGE Excellence should be serviced at the beginning of the heating season by a qualified service technician.
Reported Problems
Verify that combustion air inlet area is free of any contaminates. Refer to the list of potential materials listed on page 5 of this manual. If any of these products are in the area from which the unit takes its combustion air, they must be removed immediately or the combus­tion air intake must be relocated to another area.
Inspect Burner Area
Remove the boiler front jacket panel and ven­turi inlet elbow.
Vacuum any dirt or debris from the burner/blower components.
Re-install venturi inlet elbow and front jacket panel when completed.
WARNING
Do not use solvents to clean any of the burner components. The components could be damaged, resulting in unreli­able or unsafe operation.
Check System Piping
Inspect all piping (water and gas) on the boiler system for leaks and verify that the piping is leak free and properly supported.
Inspect the fittings and components on the unit and verify they are leak free.
Any problems reported by the owner should be checked, verified and corrected before pro­ceeding with any maintenance procedures.
Check Surrounding Area
Verify that the area surrounding the PRES­TIGE Excellence is free of combustible / flam­mable materials or flammable vapors or liq­uids. Remove immediately if found.
WARNING
Eliminate all boiler water system leaks. Continual fresh make-up water will reduce the heat exchanger life causing boiler failure. Leaking water may also cause severe property damage to the sur­rounding area. Inspect the gas supply piping using the procedure outlined on Page 38.
56
Page 64
Maintenance Procedures
Clean Condensate Drain Assembly
1. Loosen the slip ring nut from the conden­sate drain assembly disconnecting the assembly from the boiler.
2. Empty any water from the trap and drain assembly. Flush with fresh water as neces­sary to clean.
3. Check the drain piping from the condensate drain assembly to the drain. Flush to clean as necessary.
4. Reassemble the condensate drain assembly onto the boiler by tightening the slip ring nut with rubber seal onto the boiler. Hand tight only.
5. Remove the fill plug on the condensate drain assembly and fill with water. See Fig. 15 on page 23.
6. Replace the fill plug on drain assembly.
Check Ventilation Air Openings
Inspect Vent and Combustion Air Piping
Visually inspect the venting system and com­bustion air piping for blockage, deterioration or leakage. Repair any deficiencies.
Verify that the combustion air inlet piping is connected, sealed and properly supported.
WARNING
Failure to inspect the vent system and combustion air inlet piping and to have any conditions repaired, can result in severe personal injury or death.
Check Boiler System
Verify all system components are correctly installed and operating correctly.
Check the cold fill pressure for the system, typ­ical cold water fill pressure is 12 psig.
Verify that all ventilation openings to the mechanical room or building are open and unobstructed. Check the operation and wiring of any automatic ventilation dampers.
Check and verify the vent discharge and the combustion air intake are free of debris and obstructions.
Verify the system pressure, as the unit operates at high temperature, to ensure the pressure does not exceed 25 psig. Excessive pressure reading indi­cates expansion tank sizing is incorrect or system performance problems.
Inspect air vent and air separators in the sys­tem. Remove the caps on automatic air vents and briefly depress the valve stem to flush vent. Replace the cap when completed. Ensure vents do not leak, replace any leaking vents.
57
Page 65
Maintenance Procedures
Check Expansion Tank
Refer to Section IV - Boiler Piping for rec­ommended location of the expansion tank and air eliminators.
Closed -Type Tank:
- Ensure tank is partially filled with
water leaving an air gap as a cushion. Refer to the manufacturer’s instruction for proper fill level.
- Ensure the tank is fitted with a device
that reduces gravity circulation of air­saturated tank water back into the sys­tem. This device prevents air from bubbling up through the water as it returns from the system.
- Ensure no automatic air vents are used
in the system. This will allow air to escape from the system instead of returning to the tank.
Diaphragm Tank:
- Ensure the system contains a minimum of
one automatic air vent. Recommended location of the air vent should be atop an air eliminator.
- Remove the tank from the system and
check the charge pressure. For residen­tial applications the charge pressure is typically 12 psig. If tank does not hold a charge pressure, then the membrane is damaged and the tank should be replaced.
WARNING
Before manually operating the pressure relief valve, ensure the discharge piping is directed to a suitable place of disposal to avoid a potential scald hazard. The dis­charge piping must be full size without restriction and installed to permit com­plete drainage of both the valve and line.
If after closing the valve, the valve fails to seat properly or continually weeps, replace the relief valve. Ensure the cause of the relief valve to weep is the valve itself, not due to sys­tem over-pressurization caused by an expan­sion tank that is waterlogged or undersized.
Inspection of Ignition Electrode
Remove the ignition electrode from the burner mounting plate.
Remove any white oxides accumulated on the electrode using fine grit sandpaper or steel wool. If the electrode does not clean to a satisfactory condition, replace the ignitor .
When replacing the ignition electrode, ensure the gasket is in good condition and correctly positioned. Replace gasket if necessary.
Check Ignition Wiring and Ground Wiring
Inspect the burner wiring from the burner con­trol module to the ground terminal behind the control panel.
Check Boiler Relief Valve
Inspect the relief valve and lift the lever to ver­ify flow at least annually or as recommended on the warning tag of the valve.
Ensure wiring is in good condition and secure­ly connected.
Check ground continuity of the wiring to the boiler jacket or piping using a continuity meter.
Replace and correct ground wire if ground con­tinuity is not completed and satisfactory.
58
Page 66
Maintenance Procedures
Check Control Wiring
Inspect all control wiring. Ensure wiring is in good condition and properly connected.
Check Control Settings
1. Set the control display to PARAMETER mode and check all boiler settings. Adjust setting as necessary see page 44.
2. Check any external limit control settings (if used). Adjust settings as necessary.
Perform Start-Up and Checkout Procedures
Start the unit and perform the start-up proce­dure as listed in this manual.
Verify the cold water fill pressure is correct and the operating pressure of the boiler is within normal operating range.
Complete the checkout procedures as refer­enced in this manual.
Check Burner Flame
Carefully remove the burner mounting plate assembly from the heat exchanger. Ensure combustion chamber insulation is not damaged during removal of burner mounting plate assembly. See WARNING on page 61.
Remove the burner head mounting screws and remove the burner head. Inspect the burner head for deterioration. Use compressed air or a vacuum to clean the burner head.
Remove the venturi and gas valve assembly from the blower.
Use a vacuum cleaner or compressed air to clean the interior of the blower assembly. Inspect the blower blades to ensure they are clean and not damaged.
Re-assemble the venturi and gas valve onto the blower. Ensure the venturi gasket is in good condition, positioned correctly and replace gas­ket if necessary.
Re-assemble the burner head onto the burner mounting plate. Ensure the burner head gasket is in good condition, positioned correctly and replace gasket if necessary.
Inspect the burner flame through the observa­tion port on the heat exchanger.
If flame pattern is not fully blue and covers the entire burner surface during high fire, shut the unit down and allow it to cool thoroughly before disassembly.
Close the external manual gas valve on the gas supply line and disconnect the gas piping and rectifier plug.
Disconnect the wiring harness connectors from the blower and remove the blower retaining screws. Remove the blower from the unit.
Remove the mounting nuts securing the burner mounting plate to the heat exchanger and set aside.
Re-assemble the burner mounting plate assem­bly onto the heat exchanger. Ensure the burner plate gasket and combustion chamber insula­tion is in place and not damaged, replace gas­ket and insulation if necessary. See WARNING on page 61.
Re-assemble the blower onto the burner mounting plate and reconnect the wiring har­ness connectors.
Re-assemble the gas supply connection and rectifier to gas valve. Open the external manu­al gas valve. Check gas piping for any leaks as outlined on page 38 and repair if necessary. Place the unit back into service.
59
Page 67
Maintenance Procedures
Check Flame Signal
The flame signal should be a min. 3μ Α −DC.
Check the ignitor for fouling or damaged insulation if a low flame signal is read.
Check ground wiring and continuity as a cause for low flame signal. Replace ignitor if condi­tions are satisfactory.
Check Combustion Levels
Refer to page 38 of this manual for measuring combustion levels and burner adjustments.
Check Flue Gas Temperature
1. Adjust the boiler to fire at HIGH fire, see page 42. Place the control display to INFOR­MATION mode, see page 44 for procedures.
2. The flue gas temperature is indicated on the display when the first digit is 5. The measured temperature (shown as the last 3 digits) should not be more than 54ºF high­er than the measured supply water temper­ature.
3. The measured supply water temperature is indicated on the information display when the first digit is 1 and the temperature shown as the last 3 digits.
4. If the measured flue gas temperature is higher than 54ºF over the supply water temperature, shut the boiler down and fol­low the procedures listed below to clean the heat exchanger.
Clean Heat Exchanger
1. Shut down the boiler:
- Follow the instructions on page 39 "To Turn Off Gas to Appliance"
- Do not drain the boiler unless the boil­er will be subject to freezing condi­tions.
2. Allow the boiler to cool down to room tem­perature before servicing.
3. Disconnect the gas piping and rectifier plug to the gas valve.
4. Disconnect the wiring harness connectors from the blower and remove the blower retaining screws. Remove the blower from the unit.
5. Remove the mounting nuts securing the burner mounting plate to the heat exchang­er and set aside.
6. Carefully remove the burner mounting plate assembly from the heat exchanger. Ensure combustion chamber insulation is not damaged during removal of burner mounting plate assembly. See WARNING on page 61.
7. Carefully remove the combustion chamber insulation from the heat exchanger and set aside. See WARNING on page 61.
8. Use a vacuum cleaner, compressed air or water to remove any accumulation from the heat exchanger flue ways. Do not use any solvent.
9. Re-install the combustion chamber insula­tion onto the heat exchanger.
10. Re-assemble the burner mounting plate assembly onto the heat exchanger. Ensure the burner plate gasket and combustion chamber insulation is in place and not dam­aged, replace gasket and insulation if nec­essary. See WARNING on page 61.
11. Re-assemble the blower onto the burner mounting plate and reconnect the wiring harness connectors.
12. Reconnect the gas piping and rectifier to gas valve. Check for gas leaks, repair if necessary.
13. Close isolation valves on the boiler water piping to isolate the boiler from the heating system.
- Do not drain the boiler if freeze protec­tion fluid is used in the system.
60
Page 68
Maintenance Procedures
14. Attach a hose to the boiler drain valve and flush the boiler thoroughly with fresh water by using the purge valves to allow water to enter through the make-up water line to the boiler.
15. Once the boiler has been completely flushed, return the boiler and system piping back to operation.
16. Perform the required startup and checkout procedures as outlined on pages 34 to 46.
Handling of Previously Fired Combustion Chamber Insulation
Review With Owner
Ensure the owner understands the impor­tance to perform the maintenance schedule specified in this manual.
Remind the owner of the importance to call a licensed contractor should the unit or sys­tem exhibit any unusual behavior.
WARNING
The combustion chamber insulation contains ceramic fibers, which are clas­sified as a possible human carcinogen. When exposed to extremely high tem­peratures, the ceramic fibers, which contain crystalline silica, can be con­verted into cristobalite.
Avoid Breathing and Contact with Skin and Eyes
When removing or repairing the combustion chamber insulation follow these precaution measures:
1. Use a NIOSH approved respirator which meets OSHA requirements for cristobalite dust, similar to N95. Contact NIOSH at 1-800-356-4676 or on the web at www.cdc.gov/niosh for latest recommen­dations.
2. Wear long sleeved, loose fitting clothing, gloves and eyes protection.
3. Assure adequate ventilation.
4. Wash with soap and water after contact.
5. Wash potentially contaminated clothes separately from other laundry and rinse washing machine thoroughly.
6. Discard used insulation in an air tight plastic bag.
NIOSH Stated First Aid:
Eye/Skin: Immediately irrigate Breathing: Clean fresh air
61
Page 69
5
10
9
2
1B
1
3
1A
5
6
7
8
Replacement Parts
Fig. 26: PRESTIGE Excellence Jacket Components
62
Page 70
1
5
13
1
1
8
15
10
12
14
9
3
2
Replacement Parts
Fig. 27: PRESTIGE Excellence Internal Components
63
Page 71
Replacement Parts
Fig. 28: PRESTIGE Excellence Burner Components
64
Page 72
Replacement Parts
Fig. 29: PRESTIGE Excellence Electronic Components
65
Page 73
7.2"
183 mm
1/2” NPSC Boiler Drain
16"
405 mm
18.9" - 479 mm
1/2” NPT Gas Connection
12"
305 mm
1” NPT Boiler Return
1” NPT Boiler Supply
12"
306 mm
14.8"
377 mm
3/4” NPSC Pressure Relief Valve Connection
3” Combustion Air Inlet
20.4"
516 mm
3” Vent Outlet
24.7"
6
28 mm
Product Specifications
Front View
66
Page 74
2.4" - 61 mm
1/2” NPT Gas Connection
37.2” 945 mm
8.0"
205 mm
16"
406 mm
1/2” NPSC Boiler Drain
1” NPT Boiler Supply 1” NPT Boiler Return
1
1.4"
289 mm
3” Vent Outlet 3” Combustion Air Inlet
15"
381 mm
3/4” NPSC Pressure Relief Valve Connection
20.8"
529 mm
Product Specifications
Side View
67
Page 75
3.4”
87 mm
4.1”
105 mm
8”
204 mm
3/4” NPT DHW Inlet
7.3"
1
86 mm
3/4” NPSC Aux. Connection (Rear) 1/2” NPSC Air Vent Connection
3/4” NPT DHW Outlet
11.3 "
286 mm
Product Specifications
Top View (Domestic Connections)
68
Page 76
Fuel
DOE
Heating Capacity
Note 1 & 4
I
nput
Note 4
DOE Seasonal
E
fficiency AFUE
Note 3
Net IBR
Rating Note 2
99,000
110 ,000
95%
Shipping
Weight
Lbs / Kg
190 / 86
Natural
B
oiler
Model
Excellence
Excellence
86,000
8
7,000
9
7,000
95%
1
90 / 86
Propane
76,000
Product Specifications
Note 1: The heating capacity of the PRESTIGE
Excellence is based on the test requirements of the U.S. Department of Energy.
Note 2: The IBR rating is based on a piping and pick
up allowance of 1.15. This allowance should be sufficient for the standard radiation require­ments for a building load.
Note 3: Based on the given AFUE the PRESTIGE
Excellence meets the energy efficiency guide­lines established by Energy Star.
Note 4: Input and output ratings are shown for sea
level applications. The PR ESTIGE Excellence automatically derates the input at approximately 2% for every 1,000 Ft. of alti­tude. No alterations to the boiler or burner system is required.
DOE
69
Page 77
Product Specifications
Graph 2: Pressure Drop Comparison Excellence 110 vs Grundfos UPS 15-58F-FC
Note: Minimum allowable flow rate at full input: 5.0 gpm
70
Page 78
Additional Quality Water Heating Equipment Available
from Triangle Tube
Maxi-Flo and Spa Heat Exchangers
Smart Indirect Fired Water Heaters
- Construction of high quality corrosion resistant stainless steel (AISI 316) or titanium
- Specially designed built-in flow restrictor to assure maximum heat exchange
- Compact and light weight
- Available in 5 sizes that can accommodate any size pool or spa
TTP Brazed Plate Heat Exchangers
- Exclusive Tank-in-Tank design
- Stainless steel construction
- Available in 8 sizes and 2 models
- Limited LIFETIME residential warranty
- 15 year limited commercial warranty
- Self cleaning/self descaling design
- For domestic water, snow melting, radiant floor, refrigeration
- Plates made of stainless steel, with a 99.9 % copper and brazed, ensuring a high resistance to corrosion
- Self cleaning and self descaling
- Computerized sizing available from Triangle Tube/Phase III
- Available in capacities from 25,000 BTU/hr to 5,000,000 BTU/hr
Freeway Center - 1 Triangle Lane - Blackwood, NJ 08012 Tel: (856) 228 8881 - Fax: (856) 228 3584 http://www.triangle tube.com E-mail: Info@triangle tube.com
Member of
Group
Page 79
prestige
Excellence
Indirect Water Heater
Part 2 of 2
* I N S T A L L A T I O N A N D M A I N T E N A N C E *
* I N S T A L L A T I O N A N D M A I N T E N A N C E *
M A N U A L
M A N U A L
WARNING
IMPORTANT
Before proceeding with installation and operation, read entire manual care­fully. Failure to do so can cause injury or property damage.
When receiving the PRESTIGE Excellence, any claims for damage or shortage in shipment must be filed immediately against the transporta­tion company by the consignee.
Warranty Registration Card must be filled out by the customer and mailed within thirty (30) days of installation in order to gain warranty coverage.
Retain and affix this manual near the water heater for future reference
Installation and service should only be performed by a qualified installer or service technician.
Installations and service should be performed by a license plumber or gas fitter in the Commonwealth of Massachusetts.
Revised 6/9/10
2010-28 Manual Prestige Excellence_IWH
Page 80
Tables of Contents
Product & Safety Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
Pre-Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
Installation - Domestic Piping
Temperature & Pressure (T&P) Relief Valve . . . . . . . . . . . . . . . . . .5
Drain Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Automatic Air Vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Thermal Expansion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Water Hammer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Vacuum Breaker . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
General Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Domestic Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Thermostatic Mixing Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Recirculation Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Storage Tank Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Installation - Piping Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-10
Water Heater Start-Up
Filling the Inner (Domestic Water) Tank . . . . . . . . . . . . . . . . . . . . .11
Filling the Outer (Boiler Water) Tank . . . . . . . . . . . . . . . . . . . . . . .11
Setting the Thermostat Mixing Valve . . . . . . . . . . . . . . . . . . . . . . . .11
General Notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
Program Access of the MCBA . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Activating the Access Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13-14
DHW Storage Temperature Setting . . . . . . . . . . . . . . . . . . . . . . . . .15
Setpoint Value Addition for DHW . . . . . . . . . . . . . . . . . . . . . . . . . .15
DHW ON Differential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15-16
DHW OFF Differential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16-17
Additional DHW Feature
Frost Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Factory Setting for Parameters . . . . . . . . . . . . . . . . . . . . . . . . .18
Water Heater Maintenance
Maintenance Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Filling Water Heater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Draining Water Heater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19-20
Draining Inner (Domestic Water) Tank . . . . . . . . . . . . . . . . . . . . . . .20
Draining Outer (Boiler Water) Tank . . . . . . . . . . . . . . . . . . . . . . . . .20
i
Page 81
Tables of Contents
Replacement Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
Water Heater Specifications
Excellence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
Performance
Excellence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
ii
Page 82
Product & Safety Information
Definitions
The following terms are used throughout this manual to bring attention to the presence of poten­tial hazards or important information concerning the product.
DANGER
Indicates the presence of a hazardous situ­ation which, if ignored, will result in death, serious injury or substantial property damage.
WARNING
Indicates a potentially hazardous situation which, if ignored, can result in death, seri­ous injury or substantial property damage.
CAUTION
Indicates a potentially hazardous situation which, if ignored, may result in minor injury or property damage.
NOTICE
Indicates special instructions on installa­tion, operation or maintenance, which are important to equipment but not related to personal injury hazards.
BEST PRACTICE
Indicates recommendations made by Triangle Tube for the installers which will help to ensure optimum operation and longevity of the equipment
NOTICE
Triangle Tube reserves the right to modify the technical specifications and components of its prod­ucts without prior notice.
1
Page 83
Product & Safety Information
WARNING
Bacteria can develop in the domestic water system if certain minimum water tempera­tures are not maintained.
DANGER
HOT WATER CAN SCALD!
Water temperature over 125ºF can cause severe burns instantly or death from scalds.
Children, disabled and elderly are at highest risk of being scalded.
- Never leave them unattended in or
near shower, bathtub or sink.
- Never allow small children to use a hot
water faucet or draw their own bath.
To avoid any potential scald hazard or if codes require specific water temperatures at the hot water faucet, the installer must:
CAUTION
Protection must be taken against exces­sive temperature and pressure!
TO PROTECT AGAINST EXCESSIVE TEMPERATURE AND PRESSURE
Check if the Temperature & Pressure (T&P) relief valve is installed in the loca­tion provided (DHW Side).
Check if the 30 psi relief valve supplied is installed in the location provided (CH Side)
To avoid injury, install the relief devices to comply with local code requirements.
- Install the factory supplied thermostatic mixing valve at this appliance and ensure it is working property
and
- Set the domestic storage temperature to the lowest temperature which satisfies your hot water needs.
- Feel and adjust water temperature before bathing or showering.
- Water drained from the system drain valves may be extremely hot.
TO AVOID INJURY:
- Make sure all connections are tight.
- Direct water flow away from any person.
CAUTION
To prevent damage to the inner tank, the Installer must:
Always fill inner tank prior to outer tank and always drain outer tank prior to inner tank.
Relieve primary system pressure below 15 psig prior to draining inner tank.
2
Page 84
Pre-Installation
Codes Compliance
Installation of the Excellence Water Heater must conform with the instructions in this manual and where applicable:
local, state, provincial, and national codes, laws, regulations and ordinances.
in Canada - CAN / CGA B149.1 or B149.2 Installation Code.
Excellence water heater is exempt from ASME Section VIII, Division 1 Code construction per Interpretation VIII-86-136. Check with local codes for applicability.
NOTICE
The Excellence water heater will absorb less than 200,000 BTU/hr when domestic water outlet temperature is 194ºF and boiler water supply temperature is 240ºF. Listed outputs are based on ASME Section VIII Interpretation VIII-1-86-136.
Where recommendations in this manual differ from local, or national codes, the local or national codes take precedence.
2. The pressure of the heat transfer medium is maintained less than the normal minimum operating pressure of the potable water system
Exception: Steam complying with sec-
tion #1 above.
3. The equipment is permanently labeled to indicate that only additives recognized as safe by the FDA shall be used in the heat transfer medium.
Other heat exchanger designs may be permitted where approved by the Administrative Authority.
Operating Restrictions
Maximum DHW outlet temperature is 120ºF, when factory supplied mixing valve is installed.
Maximum boiler water temperature is 194ºF.
Maximum working pressure for inner (domestic water) tank is 150 psig.
Maximum working pressure for outer (boiler water) tank is 30 psig.
pH and chloride limits for water heaters are:
Codes Restrictions
Single wall heat exchanger in the Excellence water heater complies with National Standard Plumbing Code, provided that:
– boiler water (including additives) is practically
non-toxic, having toxicity rating or class of 1, as listed in Clinical Toxicology of Commercial Products, and
– boiler water pressure is limited to maximum
30 psig by approved relief valve.
Single wall heat exchangers are permitted under the Uniform Plumbing Code - Paragraph L3.2. and L3.3 if they satisfy all of the following requirements.
1. The heat transfer medium is potable water or contains only substances which are recog­nized as safe by the U.S. Food and Drug Administration.
- chloride, less than 150 mg/l
- pH value min. 6 - max. 8
NOTICE
Any water conditioning system must be installed and maintained in accordance with manufacturer’s specifications.
NOTICE
Do not install the Excellence water heater on any application if the boiler piping contains non-oxygen barrier tubing or if the boiler piping is considered an “open system”. Exposing the outer tank of the Excellence water heater to oxygen contamination will lead to premature tank failure and denial of the warranty.
3
Page 85
Pre-Installation
Locating Water Heater
The Excellence is not intended for outdoor installations.
Locate Excellence so that any leakage from the tank or water connections will not cause dam­age to the area adjoining the water heater or to lower floors in the structure.
Recommended Clearances
The Excellence is approved for zero clearance to combustibles, excluding vent and boiler piping.
- Vent & Boiler Piping - 1/4 inch from com-
bustible materials.
BEST PRACTICE
To provide serviceability to the unit it is rec­ommended that the following clearances be maintained:
NOTICE
When maintaining zero clearance or less than recommended clearances, some prod­uct labeling may become hidden and unreadable
WARNING
When installing the Excellence in a confined space, sufficient air must be provided for proper combustion and venting and to allow, under normal operating conditions, proper air flow around the product to main­tain ambient temperatures within safe limits to comply with the National Fuel Gas Code NFPA 54 - latest edition. Reference the Excellence Boiler Manual for additional guidelines.
Residential Garage Installations
Top boiler jacket - 24 inches.
Front - 24 inches.
Bottom boiler piping - 24 inches.
Rear - 0 inches
Sides - 6 inches
When installing the Excellence in a residential garage, the following special precautions per NFPA 54/ANSI Z223.1 must be taken:
- Mount the unit with a minimum 18 inches above the floor level of the garage. Ensure the burner and ignition devices / controls are no less than 18 inches above the floor level.
- Locate or protect the unit in a matter so it cannot be damaged by a moving vehicle.
4
Page 86
Installation - Domestic Piping
Temperature & Pressure (T&P) Relief Valve
CAUTION
To reduce risk of excessive pressures and tem­peratures in the water heater, install tempera­ture and pressure protective equipment required by local codes, but no less than a com­bination temperature and pressure relief valve certified by a nationally recognized testing lab­oratory that maintains periodic inspection of production of listed equipment or materials, as meeting the requirements for Relief Valves and Automatic Gas Shutoff Devices for Hot Water Supply Systems, ANSI Z21.22. This valve must be marked with a maximum working pressure of the water heater.
The Excellence water heater must be protected with a T&P relief valve.
Size the Excellence T&P relief valve by the following specifications, unless they conflict with local codes: 3/4” NPT with an AGA Rating of 100,000 BTU/hr (Watts 100XL-8 or equivalent).
Install the T&P in the run (straight through leg) of a tee located at the domestic hot water out­let. Use a long element T&P relief valve, as shown in Fig. 3 page 8.
T&P Relief Valve Discharge Piping
T&P relief valve discharge piping must be:
- made of material serviceable for tempera­tures of 250ºF or greater.
- directed so that hot water flows away from all persons.
- directed to a suitable place for disposal.
- installed so as to allow complete draining of the T&P relief valve and discharge line.
T&P relief valve discharge piping must not
- excessively long. Using more than 2 elbows or 15 feet of piping can reduce dis­charge capacity.
- directly connected to a drain. Terminate discharge piping within 6” from drain. Refer to local codes.
- plugged, reduced or restricted.
- subject to freezing.
be:
NOTICE
For proper operation of the T&P and to pre­vent the T&P from activating due to boiler water temperature, use a T&P relief valve with extended element. A 8” minimum length is recommended.
Standard Installation
Install T&P relief valve in the Auxiliary con-
nection located behind the air vent on the top of the water heater as shown Fig. 2 page 8.
Commonwealth of Massachusetts Installation
Follow this procedure for jurisdictions requiring a vacuum breaker to be installed on the domestic
cold water inlet.
WARNING
Do not install any valve between T&P relief valve and tank connection or on T&P relief valve discharge piping. Do not plug T&P relief valve or discharge piping. Improper placement and piping of T&P relief valve can cause severe personal injury, death or substantial property damage.
5
Page 87
Installation - Domestic Piping
Drain Valve
Drain valve and fittings are supplied by others.
Standard Installation
Install a tee connection at the domestic cold water inlet, as shown in Fig. 4, pages 9.
Pipe the drain piping with drain valve from the tee connection to:
- a suitable place for disposal or
- terminate within 12” of the floor
Commonwealth of Massachusetts Installation
Thread a 3/4” close nipple onto the Auxiliary connection and insert an open­end dip tube into the Auxiliary connection on top of water heater. As shown in Fig. 3, page 8.
Install a 3/4” NPT elbow to the Auxiliary connection.
Pipe the drain piping with drain valve from the elbow connection to:
- a suitable place for disposal or
- terminate within 12” of the floor
CAUTION
T&P relief valve is not intended for constant duty, such as relief of pressure due to repeated normal system expansion. Correct this condition by installing a properly sized expansion tank in domestic water system. Refer to expansion tank manufacturer’s installation instructions for proper sizing.
Water Hammer
Dishwashers, clothes washers and fast-closing pos­itive shut-off valves incorporated in the system all contribute to creating water shock. Install a water hammer arrester to prevent damage to pipes and appliances. See device manufacturer’s instructions for application and installation.
NOTICE
Water hammering within the domestic pip­ing system can cause premature failure of the inner tank of the water heater. This type of failure is NOT covered under warranty.
Automatic Air Vent
1. Install automatic air vent provided using suitable pipe dope or tape in the air vent con­nection as shown in Fig. 2 and 3 page 8.
2. Unscrew vent cap on air vent one full turn. Leave cap unscrewed one turn for normal venting.
Thermal Expansion
If a backflow preventer, check valve or pressure
reducing valve is piped on cold water supply piping of water heater, install an expansion tank on cold water supply line to prevent normal thermal expan­sion from repeatedly forcing open T&P relief valve.
Vacuum Breaker
Installing a vacuum breaker on the domestic cold water outlet will prevent damage to the inner tank if a negative pressure is developed in the domestic supply line. See manufacturer’s instructions for application and installation of the vacuum breaker.
General Piping
For domestic water piping diagrams, see pages 9 and 10.
All plumbing must meet or exceed all local, state and national plumbing codes.
Use pipe dope or tape suitable for potable water systems.
Use isolation valves to isolate system compo­nents.
6
Page 88
Installation - Domestic Piping
C
o
l
d
H
o
t
Adapter
Check Valve
Mixed
Domestic Piping
Union on domestic hot water outlet should be piped at a higher elevation than domestic water drain valve. This will make draining the water heater easier.
Use dielectric unions or couplings to protect hot and cold water fittings from corrosion when connecting dissimilar materials such as copper and galvanized iron pipe.
If copper pipe is used for domestic water con­nections, first solder pipe to a threaded adapter and then screw adapter into cold water inlet on top of Excellence. Cold Water Inlet contains an internal plastic dip tube which can be dam­aged by heat from soldering.
NOTICE
Do not apply heat to the cold water inlet when making sweat connections to water heater. Sweat tubing to adapter before fit­ting adapter to cold water inlet of heater. It is imperative that no heat be applied to the cold water inlet, as it contains a non metal­lic dip tube.
When the water supply pressure is higher than 70 psig, it is recommended to install a pressure reducing valve on cold water supply line to prevent water loss through T&P relief valve.
DANGER
For proper operation of the thermostatic mixing valve and to prevent potential scald­ing hazards, the recirculation loop should be controlled by an aquastat. DO NOT use continuous recirculation.
Fig. 1: Mixing Valve Assembly
Recirculation Piping
Recirculation piping must be installed in the cold water inlet as shown Fig. 5, page 9.
A stainless steel or bronze circulator is recom­mended.
Thermostatic Mixing Valve
The Excellence is factory supplied with a thermo­static mixing valve with built-in check valve. The mixing valve must be installed as shown in Fig. 1.
The operating range of the thermostatic mixing is 90ºF to 120ºF.
For applications with a domestic recirculation loop, the recirculation pump should be controlled
by an aquastat. The maximum recommended set­ting of the aquastat is 10ºF lower than the thermo­static mixing valve setting.
Storage Tank Application
For applications requiring large volumes of domes­tic hot water in a relative short period, the installer may include a storage type tank (see Fig. 6 page 10) in the domestic piping.
The installer must:
1. Relocate the thermostatic mixing valve from the Excellence to the outlet of the storage tank.
2. Provide recirculation from the storage tank back to the Excellence using a bronze type circulator. Maximum recommended recircu­lation flow rate is 1 gpm.
7
Page 89
Installation - Domestic Piping
DHW Aux.
Connection
DHW Cold Water Inlet
Air Vent
Connection
DHW
Hot Water
Outlet
T
&P Valve
(Drain Piping Not Shown)
Drain Dip Tube
3/4” Brass Close Nipple
DHW Aux. Connection
DHW Hot Water Outlet
DHW Cold Water Inlet
Air Vent
Connection
3/4” Brass
Te e
T&P Valve
(Drain Piping Not Shown)
Fig. 2: Standard Installation of the T&P Relief Valve
Fig. 3: Commonwealth of Massachusetts Installation
8
Page 90
Cold Water
Inlet
6
1
12" min.
Heat Trap
Loop
(Optional)
12" Min.
Heat Trap
Loop
(Optional)
5
4
9
8
3
M
H
C
Installation - Piping Diagrams
Fig. 4:
Fig. 5:
1. Shut-off valve
2. Flow check valve
3. Mixing valve with check valve
4. Vacuum Breaker *
5. Unions
Standard Installation Domestic Piping Excellence Series
Standard Installation Domestic Piping with Optional Recirculation Excellence Series
6. Backflow preventer or pressure reducing valve(*)
7. Circulator (controlled by aquastat) 8 Domestic drain valve
9. Thermal expansion tank (potable)
(*) Optional devices may be required by local codes.
9
Page 91
Installation - Piping Diagrams
Optional 12" Heat trap
Optional recirculation
8
1
H
C
M
3
Cold water
inlet
4
3
3
6
9
2
7
2
7
Fig. 6:
Domestic Piping with Optional Storage Tank
1. Mixing valve with check valve
2. Flow check valve
3. Shut-off valve
4. Backflow preventer or pressure reducing valve(*)
6. Thermal expansion tank
7. Circulator (controlled by aquastat) 8 Domestic drain valve
9. Vacuum Breaker *
(*) Optional devices may be required by local codes.
10
Page 92
Water Heater Start-Up
Filling the Inner (Domestic Water) Tank
CAUTION
Never use the Excellence unless inner and outer tank of the water heater is completely filled with water.
Inner tank of the Excellence water heater must be completely filled and pressurized before pressurizing outer tank.
1. Close domestic water drain valve.
2. Open domestic water isolation valves on the water heater piping.
3. Vent air from inner (domestic water) tank by opening nearest hot water faucet. Fill domes­tic water tank completely by allowing water to run until there is a constant flow of water.
4. Close hot water faucet.
Filling the Outer (Boiler Water) Tank
WARNING
Do not use automotive, ethylene glycol or petroleum-based antifreeze. Do not use any undiluted antifreeze. This can cause severe personal injury, death or substantial property damage.
Setting the Thermostatic Mixing Valve
NOTICE
The thermostatic mixing valve controls the outlet hot water temperature delivered to the faucets.
WARNING
POTENTIAL SCALD HAZARD. The mix­ing valve must be installed on the Excellence. Removal of the mixing valve will create a potential scald hazard resulting in severe personal injury or death.
CAUTION
Never use the Excellence unless inner and outer tank of the water heater is completely filled with water.
Inner tank of the Excellence water heater must be completely filled and pressurized before pressurizing outer tank.
NOTICE
Reference the PRESTIGE Excellence boiler manual for boiler start-up and guidelines for filling the boiler.
If antifreeze is used in boiler water, check concen-
tration. Boiler water (including additives) must be practically non-toxic, having toxicity rating or class of 1, as listed in Clinical Toxicology of Commercial
Products.
If any adjustment needs to be made on the valve:
- Use a L-Key to remove the set screw securing the knob to the valve.
- Remove the knob and lock ring from the valve.
- Replace the knob and adjust the set tempera­ture of the valve to the desired temperature.
NOTICE
To calibrate the outlet temperature, allow the water to run for approximately 2 min­utes and measure the water with a ther­mometer. To adjust the valve setting, rotate the knob clockwise to decrease the water temperature or counter-clockwise to increase the water temperature.
- Once the desired temperature is achieved, remove the knob and refit the lock ring onto the valve’s “Mix” marking.
- Locate the tab on the inner face of the knob into the retainer in the locking ring. Secure the knob with set screw.
11
Page 93
Water Heater Start-Up
DANGER
HOT WATER CAN SCALD!
Water temperatures over 125ºF can cause severe burns instantly, or death from scalds.
Feel water before bathing or showering.
Consumer Product Safety Commission and some states recommend temperatures settings of 130ºF or less. Setting thermostat higher than 130ºF will increase risk of scald injury and cause severe personal injury or death.
Water heated to a temperature suitable for clothes washing, dish washing and other sanitiz­ing needs will scald and cause permanent injury.
Children and elderly, infirm, or physically handicapped persons are more likely to be injured by hot water. Never leave them unat­tended in or near a bathtub. If anyone using hot water in the building fits this description, or if state laws or local codes require certain water temperatures at hot water faucets, take special precautions.
- Install the factory supplied automatic mix­ing valve at water heater and/or install a point of use mixing valve at each hot water faucet, bath and shower outlet. Selection and installation of point of use mixing valves must comply with valve manufactur­er’s recommendation and instructions.
- Use the lowest practical temperature setting.
- Check water temperature after any adjust­ment of the mixing valve.
General Notes
Household water usage patterns will affect water temperature at any faucet or shower. Occasionally check temperature at each point of use, then adjust the mixing valve setting accordingly. Always recheck temperature after adjusting the mixing valve.
Lowering the automatic mixing valve as indicat­ed in these instructions will reduce water tem­perature levels. Consult your installer or service technician.
12
Page 94
Water Heater Start-Up
Important Information - Read Before Proceeding
WARNING
This document is intended to be used by a factory trained and qualified heating con­tractor or service technician only. Read all instructions within this document and with­in the PRESTIGE Excellence Boiler Installation and Maintenance Manual, before proceeding. It is recommended to follow the procedures in the steps given, skipping or missing procedural steps could result in severe personal injury, death or substantial property damage.
Program Access of the MCBA CONTROL
To adjust the factory parameter setting of the Prestige MCBA Control, the installer must enter into the Parameter menu of the control.
WARNING
Activating the Access Code
To enter the parameter listing of the MCBA con­trol, the installer must enter the service code as fol­lows:
1. Press and hold the MODE button
2. Continue holding the MODE and press STEP
button until
STBY appears and hold both STEP
and MODE buttons for 2 to 3 seconds.
The display should read
CODE
3. Release the STEP and MODE buttons on the control panel.
4. Press STEP once.
The display should read
XX
(XX
C_
should be a random number from 00 to 99)
5. Press the + or - button to change the display
number
C_
XX
to read C_54. Press and release
the + or - to change the display one number at a time. Press and hold the + or - to rapidly change the display number.
Do not attempt to revise any other control parameter setting except those listed in this supplement. Perform only those parameter revisions described in this supplement. Failure to comply could result in erratic or unreliable operation of the Prestige result­ing in severe personal injury, death or sub­stantial property damage.
NOTICE
For additional information on revising the Prestige MCBA Control Module operational parameter settings, reference the Prestige Control Supplement.
6. When the display reads C_54 press STORE to
save the service code. The display C_54 should flash when the code is entered and saved.
After the service code is entered press the MODE
button until the display shows
PARA. At this point
the installer can access the parameters required for application.
Once in the parameter mode, press the STEP repeatedly to reach the appropriate parameter set­ting. The display should show the following sequence, as the STEP button is press repeatedly:
Press STEP once- 1140 Press STEP x2 - 2_01 Press STEP x3 - 3_01 Press STEP x4 - 4186
13
Page 95
Water Heater Start-Up
Press STEP x5 - P_10 Press STEP x6 - P_11
Etc......
After Parameter 4 the display will show P followed by a two-digit number that increases with each press of the STEP button.
NOTICE
The actual parameter values displayed on the unit may vary depending on the applica­tion. The parameter sequence will always occur in the order shown.
Once a particular parameter is reached, release the STEP button. Wait a second and the display will show the current setting for that parameter in the right two display digits.
To Change a Parameter Setting
Use the + or - button to change the value of the display.
Press the STORE button once to save the change.
WARNING
If a parameter setting is changed from the factory default and the STORE button is not pressed to save the setting, the MCBA mod­ule will automatically store the setting after 15 minutes. Ensure all parameters settings are either factory default or revised based on the application. Review all parameters settings on page 18 when completed and prior to commission of the boiler. Failure to comply could result in erratic or unreliable operation of the Prestige boiler.
NOTICE
Once a parameter setting value has been revised and stored, if the STEP button is pressed for the next parameter setting the value setting of that parameter will appear. The display will not show P_XX of the next sequential parameter. The sequence of parameters may be scrolled through, as the display will roll over from parameter 46 to parameter 1.
BEST PRACTICE
If sequential parameters are being revised and since the display will not show P_XX of the sequential parameter, it is recommended to press and hold the STEP button to scroll through the entire list of parameters before making any additional changes to avoid any potential confusion.
14
Page 96
Water Heater Start-Up
DHW Storage Temperature Setting
The parameter setting for the DHW storage tem­perature is Parameter 1 and is accessible without having to enter the service code.
To revise the parameter setting within the Prestige Control Module for the set point of the Domestic Storage temperature, the installer can access the parameter setting by entering the Parameter Mode
PARA during normal operation, the service code is
not required.
1. Press MODE once until the display shows
PARA.
To revise the parameter setting within the Prestige Control Module for the Setpoint Value Addition for DHW, the installer must activate the service code for the control module as previously described in the Program Access of the MCBA section.
1. Enter into the service code mode.
2. Once the service code has been entered and accepted, press MODE until the display shows
PARA.
3. Press STEP until the display shows This parameter setting is the Setpoint Value Addition for DHW parameter. After releasing the STEP button the display will show the cur­rent setting.
P_21.
2. Press STEP until the display shows 1XXX (where XXX is a setting other than the factory setting).
3. Press the + or - button until the desired DHW storage temperature setting is achieved. Press STORE to save the setting. The display will flash when the revised setting is accepted.
Setpoint Value Addition for DHW
To achieve the boiler operating temperature during a DHW request for heat, the MCBA Control uses Parameter 1 and a second parameter, Parameter 21 Setpoint Value Addition for DHW. Parameter 1 plus Parameter 21 will establish the boiler operat­ing temperature limit.
If Parameter 1 is set below 134ºF, it is recom­mended that Parameter 21 be reset to a higher set­ting. The request for DHW is based on the tem­perature reading of the DHW sensor and its rela­tionship to Parameter 1. The operating boiler tem­perature setpoint is based on Parameter 1 plus Parameter 21 with a maximum operating tempera­ture of 194ºF.
1140 or
4. Press the + or - button until the desired setting is achieved. Press STORE to save the setting. The display will flash when the revised setting is accepted.
5. Once the desired parameter setting has been revised and stored within the Prestige Control module, press RESET to exit the CODE mode.
DHW ON Differential
The MCBA Control Module has 2 differential set­tings for the burner operation. The first differential setting the installer has the option of adjusting, is Parameter 38 DHW ON Differential. This parame­ter sets the DHW storage temperature low limit. The burner operation will respond when the DHW stor­age temperature drops below Parameter 1 minus Parameter 38 setting.
A minimum DHW ON Differential parameter setting will create a quicker burner operation response to any domestic water draws from the Excellence tank. In contrast, a maximum DHW ON Differential set­ting will result in a delay response to domestic draws.
15
Page 97
Water Heater Start-Up
DANGER
The DHW ON Differential setting of Parameter 38 greatly affects the production of domestic hot water. A minimum setting of Parameter 38 could result in a rapid response to a DHW request for heat resulting in a potential scald hazard. It is strongly recommended that the installer utilize the factory supplied thermostatic mixing valve on the DHW outlet of the Excellence. Failure to comply could result in severe personal injury, death or substantial property damage.
To revise the parameter setting within the Prestige Control Module for DHW ON Differential control, the installer must activate the service code for the control module as previously described in the Program Access of the MCBA section.
1. Enter into the service code mode.
2. Once the access code has been entered and accepted, press MODE until the display shows
PARA.
3. Press STEP until the display shows This parameter setting is the DHW ON Differential parameter. After releasing the STEP button the display will show the current setting.
P_38..
DHW OFF Differential
The second differential setting is Parameter 39 DHW OFF Differential. This parameter sets the DHW storage temperature high limit. The burner operation will cease when the DHW storage tem­perature rises above Parameter 1 plus Parameter
39. A maximum DHW OFF Differential parameter set­ting will result in an extended burner firing cycle when responding to any domestic water draws from the Excellence. This extended burner firing cycle could result in a final storage temperature of the domestic hot water that is higher than the desired storage temperature setting.
DANGER
The DHW OFF Differential setting of Parameter 39 greatly affects the production of domestic hot water. A maximum setting of Parameter 39 could result in an excessive domestic storage temperature resulting in a potential scald hazard. It is strongly recom­mended that the installer utilize the factory supplied thermostatic mixing valve on the hot water outlet of the Excellence. Failure to comply could result in severe personal injury, death or substantial property damage.
4. Press the + or - button until the desired setting is achieved. Press STORE to save the setting. The display will flash when the revised setting is accepted.
5. Once the desired parameter setting has been revised and stored within the Prestige Control module, press RESET to exit the CODE mode.
To revise the parameter setting within the Prestige Control Module for DHW OFF Differential con­trol, the installer must activate the service code for the control module as previously described in the Program Access of the MCBA section.
1. Enter into the service code mode.
2. Once the access code has been entered and accepted, press MODE until the display shows
PARA.
3. Press STEP until the display shows This parameter setting is the DHW OFF Differential parameter. After releasing the STEP button the display will show the current setting.
16
P_39.
Page 98
Water Heater Start-Up
4. Press the + or - button until the desired setting is achieved. Press STORE to save the setting. The display will flash when the revised setting is accepted.
5. Once the desired parameter setting has been revised and stored within the Prestige Control module, press RESET to exit the CODE mode.
Additional DHW Features
Troubleshooting
Error Codes
b_38 alternating with a status code of 9
The IDWH Sensor is not properly connect­ed to the Prestige low voltage terminal strip. Check for proper connections and proper terminals
b_33 alternating with a status code of 9
The IDWH Sensor is short-circuited. Check for proper connections to the Prestige low voltage terminals.
Frost Protection
Through the use of the IDWH sensor, the Prestige Excellence Control module will now provide a Frost Protection feature to the water heater.
The Frost Protection feature is designed to protect the Excellence water heater from a potential freeze up. The protection is activated once the IDWH sensor records a domestic temperature below 38ºF. At that time the Prestige Excellence will begin the burner function at low input, the circulator will begin circulating and the internal 3-way valve will open. The burner will continue operating at min­imum input with circulator energized until the sen­sor senses a domestic water temperature above 50ºF. At that point the boiler will shut down the
burner function and circulator. This feature is always active even if the DHW operation is in the OFF mode and cannot be overridden.
Once the condition is corrected, the errors will automatically reset and the Prestige Excellence will return to normal operation.
17
Page 99
Water Heater Start-Up
FACTORy SETTING FOR PARAmETERS
18
Page 100
Water Heater Maintenance
Maintenance Schedule
Annual service by qualified service technician
should include the following:
Any procedure required by local codes.
Check air vent operation.
Verify system pressure. Air venting proce­dure may require adding water to bring sys­tem up to pressure, typically 12 psig.
Manually operate T&P relief valve at least once a year. This will release some hot water.
WARNING
Before operating T&P relief valve, make sure no one is in front of or around T&P relief valve discharge piping. Hot discharge water can cause severe personal injury or substantial property damage.
Move operating lever to open position for a few seconds and then move it back, allowing it to snap closed. After T&P relief valve is operated, if it continues to release water, close cold water inlet to water heater imme­diately. Follow draining instructions, and replace T&P relief valve. If T&P relief valve weeps periodically, it may be due to thermal expansion see Thermal Expansion, page 6. Do not plug T&P relief valve or discharge piping.
Check function of field-installed controls and valves. See component manufacturer’s instructions.
Review homeowner’s maintenance responsi­bilities and their frequencies, including any not listed in the following section.
Homeowner monthly maintenance to include:
Check air vent operation.
Automatic air vent - remove cap. Briefly push in valve and release it to clean valve seat. Screw cap on completely, then unscrew one full turn. If air vent does not operate, call qualified service technician.
Visually check valves, pipes and fittings for leaks. Call qualified service technician to repair leaks.
Filling Water Heater
See “Filling the Outer (Boiler Water) Tank” and “Filling the Inner (Domestic Water) Tank on page
11.
Draining Water Heater
Drain water heater if it will be shut off and exposed to freezing temperatures. Freezing water will expand and damage water heater.
If boiler water contains sufficient antifreeze, then only the domestic water needs to be drained.
WARNING
Plugging T&P relief valve or discharge pip­ing can cause excessive pressure in water heater, resulting in severe personal injury, death, or substantial property damage.
Follow instructions on circulator to oil it, if required.
Check mixing valve, valves, pipes and fit­tings for leaks.
WARNING
Close boiler water isolation valves and relieve system pressure to below 15 psig in outer tank before draining inner tank to prevent damage to inner tank.
If boiler water does not contain sufficient antifreeze, then the boiler water and domestic water must be drained.
19