TriangleTube Solo 110, INSRKIT08, Solo 155, Solo 199, Combi 199 Conversion Instructions

...
Page 1
Instinct Solo/Combi
Natural to Propane Conversion Instructions
Kit Part Number
INSRKIT08 (Solo 110)
INSRKIT10 (Solo/Combi 155)
INSRKIT12 (Solo/Combi 199)
Kit Includes
Rating Label
Conversion Label
(1) Propane Gas Venturi
Acoustic Foam
WARNING
!
Indicates a potentially hazardous situation which, if ignored, can result in serious injury or substan tial property damage.
NOTICE
Recommended Tools
Adjustable Wrench / 10 mm Socket & Ratchet
Phillips Head Screwdriver
Flat Head Screwdriver
Calibrated Combustion Analyzer
NOTICE
Indicates special instructions on installation, operation
-
When converting the appliace from Natural to Propane ensure that the conversion is completed before fully installing the air inlet piping.
WARNING
!
For your safety, turn o electrical power supply at service panel and allow unit to cool before pro­ceeding to avoid possible electrical shock and scald hazard. Failure to do so can cause severe personal injury or death.
WARNING
!
Failure to follow instructions below can result in severe personal injury or damage if ignored.
Instructions are for a qualied installer/ ser­vice technician only.
Read all instructions before proceeding.
Follow instructions in proper order.
NOTICE
Upon completion of the conversion from Natural to Pro­pane, ax the new rating label included in the kit to the unit adjacent to the existing rating label. DO NOT ax the new label over the existing rating label. Add propane conversion labeling to the gas valve.
NOTICE
These instructions cover NG to LP conversion for Instinct boilers only. Each kit is supplied with one venturi suitable for use with that particular boiler model.
223042 A02 Revision Date: 07/2019
2019-18 Instinct NG to LP Conversion
Page 2
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
1. Preliminary Instructions:
1. Verify that the \venturi replacement kit is correct for the model of boiler. See page 1.
2. Turn o electrical power supply to the boiler.
3. Close the manual gas shut o valve to the unit.
4. Remove the front panel of the Instinct by removing the screw along the bottom edge of the unit. Pull the bottom of the panel forward and then lift to re­move the front panel from the unit.
5. Using a voltmeter ensure there is no electrical pow­er to the boiler by checking for power on the boil­er’s high voltage terminals L and N.
WARNING
!
ELECTRICAL SHOCK HAZARD Ensure power to the boiler has been disconnected pri­or to servicing the unit.
2. Install the Acoustic Foam (supplied);
1. Cut a 7" length of 3" diameter air inlet piping.
2. Insert the 7" pipe into the air inlet adaptor.
NOTICE
The the INSTINCT boiler has a length of acoustic foam al­ready installed in the air inlet adaptor. DO NOT remove this
3. Insert the length of acoustic foam (supplied), into the 7" pipe length.
4. Use either a straight coupling or elbow to con­tinue the air inlet installation. Refer to the Vent Supplement for full details on the installation of air and vent pipes.
Acoustic
Foam
Acoustic Foam
7" Air Inlet Pipe
7" Air
Inlet Pipe
Boiler
Air Inlet
Fig. 1: Installing the Acoustic Foam
Page 3
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
3. Removal of Natural Gas Venturi
1. Remove the silicone tube from the air inlet elbow, then remove the air inlet elbow.
2. Rotate the venturi interface approximately 60° clockwise to release the clamping mechanism and remove the venturi interface.
3. Remove the gas valve to venturi pipe by loosening the nuts at both ends of the pipe with an adjust­able wrench.
NOTICE
Fig. 2: Instinct 110 Gas Train
Fig. 3: Instinct 155 Gas Train
There are gaskets at both ends of the gas valve to venturi pipe. These gaskets must be reinstalled along with the pipe. Use care not to damage the gaskets.
4. Using a 10 mm socket and ratchet, remove the three (3) bolts securing the venturi to the fan as­sembly and remove the natural gas venturi from the unit, making sure not to damage the blower O-ring gasket.
4. Install the propane venturi
1. Verify the following when aligning the propane venturi:
1. The UP arrow on the plastic housing is pointing upward.
2. The threaded connection for the gas piping is in the correct orientation for re-tting the gas pipe.
Fig. 4: Instinct 199 Gas Train
Page 4
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
WARNING
!
Failure to retain the O-ring gasket between the ventu­ri and the blower will cause an improper seal resulting in a potential risk of a gas leak. A gas leak can result in substantial property damage, serious injury, or death.
WARNING
!
Ensure the proper venturi for the model is installed per Table 1. Failure to comply will aect input rate and combustion of the boiler which can result in sub­stantial property damage, serious injury, or death.
NOTICE
Do not use adhesive on any gaskets or O-rings during the re­assembly process.
1. Using a 10 mm socket and ratchet, reinstall the three (3) bolts securing the venturi to the fan as­sembly
2. Reassemble the gas valve to venturi pipe to the gas valve and venturi taking care to ensure that the gaskets are seated properly before tightening the nut.
6. Attach the propane conversion label to the gas valve and the propane conversion rating label next to the existing rating label
7. Enter the propane (LP) appliance code from the propane rating label supplied in the conversion kit:
1. Press and hold the UP and DOWN buttons to­gether see Fig. 5.
Fig. 5: CTRLMax Navigation Control
2. Enter the installer access code “054” by using the LEFT and RIGHT buttons to select a digit and the UP and DOWN buttons to change the digit. Press the center button to enter the access code.
3. With the CH/DHW Settings icon highlighted, press the center button.
3. Install the venturi interface on the venturi and ro­tate counterclockwise until locked into place.
4. Install the air inlet elbow then attach the silicone tube.
WARNING
!
Failure to properly install the air inlet elbow and at­tach the silicone tube can aect combustion of the boiler which can result in substantial property dam­age, serious injury, or death.
5. Open the manual gas shut o valve to the unit. Before placing the boiler back into operation, test all gas connections for leaks and repair if leaks are found.
WARNING
!
Do not check for gas leaks with an open ame. Use a bubble test. Failure to test for gas leaks can result in substantial property damage, serious injury, or death.
4. Press the DOWN button to highlight the Boiler Settings icon then press the center button.
5. Scroll down to highlight Appliance Setting then press the center button.
6. Enter the propane (LP) appliance code from the rating label by using the LEFT and RIGHT buttons to select a character and the UP and DOWN but­tons to change the character. Press the center button to enter the appliance code.
Page 5
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
5. Combustion Test and Adjustments
NOTICE
The installer MUST perform a complete combustion check to ensure the following combustion levels are met at high and low input ring rates and the burner is operating at op­timum conditions.
WARNING
!
The combustion testing and adjustments must be per­formed by a qualied installer, service agency or the gas supplier. All combustion measurements must be performed with calibrated equipment to ensure prop­er readings and accuracy.
WARNING
!
NOTICE
An adequate CH load must be present to dissipate the heat generated during the combustion test. If an adequate CH load is not available, an indirect water heater can be used to dis­sipate the heat by creating a DHW call which will enable the DHW circulator.
5. Press the RIGHT button to adjust the ring rate to 100% (high re). Hold down the RIGHT button to rapidly increase the ring rate.
6. If the combustion levels during high re are outside the recommended combustion settings (see Table 1), adjust the THROTTLE SCREW (see Fig. 7) using a at­blade screwdriver as follows:
Counter-clockwise adjustment of the THROTTLE SCREW at High Fire (100% ring rate):
Failure to perform a complete combustion test at both high and low input rates may result in incomplete combustion and the production of carbon monoxide, which can cause severe personal injury, death or sub­stantial property damage.
1. Touch simultaneously on the up and down soft keys for 3 seconds to access the functions for the installer. See Fig. 5.
2. Enter the installer access code “054” by using the LEFT and RIGHT buttons to select a digit and the UP and DOWN buttons to change the digit. Press the CENTER button to enter the access code.
3. Press the RIGHT button to highlight the Manual Operation icon then press the CENTER button.
Manual Operation
FAN
CH1
DHW
CH2
Released
O
O
O
O
decreases and CO2 increases
2
Clockwise adjustment of the THROTTLE SCREW at High Fire (100% ring rate):
O
increases and CO2 decreases
2
7. Once the combustion level is set at high re, manu­ally place the boiler into low re mode by pressing the LEFT button to adjust ring rate down to 1% (low re).
8. If the combustion level (O
or CO2) during low re is
2
not are outside the recommended combustion set­tings in Table 1 contact Triangle Tube Technical Sup­port.
9. Press the CENTER button while the fan icon is high­lighted to shutdown the burner.
10. Press the LEFT or RIGHT button to highlight the home screen icon to exit the service mode.
11. Replace the front panel and put the boiler back into operation.
Fig. 6: CTRLMax Manual Operation
4. Press the CENTER button while the FAN icon is highlighted to manually re the burner and power the CH circulator. See Fig. 6
Page 6
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
Table 1: Combustion Settings
Propane (All Models)
CO2 Range 10.4 - 11.0%
Range 5.1 - 4.2%
O
2
High Fire
CO Max 200 ppm
CO2 Range 10.4 - 11.0%
Ensure CO2 values measured are less than or equal to
High Fire CO2 measurements
O
Range 5.1 - 4.2%
2
Low Fire
Ensure O2 values measured are higher than or equal to
High Fire O2 measurements
CO Max 10 ppm
Throttle Screw
Fig. 7: Throttle Screw Location
Loading...