Indicates a potentially hazardous situation which,
if ignored, can result in serious injury or substan
tial property damage.
NOTICE
Recommended Tools
• Adjustable Wrench / 10 mm Socket & Ratchet
• Phillips Head Screwdriver
• Flat Head Screwdriver
• Calibrated Combustion Analyzer
NOTICE
Indicates special instructions on installation, operation
-
or maintenance, which are important to equipment
but not related to personal injury hazards.
When converting the appliace from Natural to Propane ensure that the conversion is completed before fully installing the
air inlet piping.
WARNING
!
For your safety, turn o electrical power supply
at service panel and allow unit to cool before proceeding to avoid possible electrical shock and
scald hazard. Failure to do so can cause severe
personal injury or death.
WARNING
!
Failure to follow instructions below can result in
severe personal injury or damage if ignored.
• Instructions are for a qualied installer/ service technician only.
• Read all instructions before proceeding.
• Follow instructions in proper order.
NOTICE
Upon completion of the conversion from Natural to Propane, ax the new rating label included in the kit to the
unit adjacent to the existing rating label. DO NOT ax
the new label over the existing rating label. Add propane
conversion labeling to the gas valve.
NOTICE
These instructions cover NG to LP conversion for Instinct
boilers only. Each kit is supplied with one venturi suitable
for use with that particular boiler model.
223042 A02
Revision Date: 07/2019
2019-18 Instinct NG to LP Conversion
Page 2
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
1. Preliminary Instructions:
1. Verify that the \venturi replacement kit is correct
for the model of boiler. See page 1.
2. Turn o electrical power supply to the boiler.
3. Close the manual gas shut o valve to the unit.
4. Remove the front panel of the Instinct by removing
the screw along the bottom edge of the unit. Pull
the bottom of the panel forward and then lift to remove the front panel from the unit.
5. Using a voltmeter ensure there is no electrical power to the boiler by checking for power on the boiler’s high voltage terminals L and N.
WARNING
!
ELECTRICAL SHOCK HAZARD
Ensure power to the boiler has been disconnected prior to servicing the unit.
2. Install the Acoustic Foam (supplied);
1. Cut a 7" length of 3" diameter air inlet piping.
2. Insert the 7" pipe into the air inlet adaptor.
NOTICE
The the INSTINCT boiler has a length of acoustic foam already installed in the air inlet adaptor. DO NOT remove this
3. Insert the length of acoustic foam (supplied),
into the 7" pipe length.
4. Use either a straight coupling or elbow to continue the air inlet installation. Refer to the Vent
Supplement for full details on the installation of
air and vent pipes.
Acoustic
Foam
Acoustic
Foam
7" Air Inlet
Pipe
7" Air
Inlet
Pipe
Boiler
Air Inlet
Fig. 1: Installing the Acoustic Foam
Page 3
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
3. Removal of Natural Gas Venturi
1. Remove the silicone tube from the air inlet elbow,
then remove the air inlet elbow.
2. Rotate the venturi interface approximately 60°
clockwise to release the clamping mechanism and
remove the venturi interface.
3. Remove the gas valve to venturi pipe by loosening
the nuts at both ends of the pipe with an adjustable wrench.
NOTICE
Fig. 2: Instinct 110 Gas Train
Fig. 3: Instinct 155 Gas Train
There are gaskets at both ends of the gas valve to venturi
pipe. These gaskets must be reinstalled along with the pipe.
Use care not to damage the gaskets.
4. Using a 10 mm socket and ratchet, remove the
three (3) bolts securing the venturi to the fan assembly and remove the natural gas venturi from
the unit, making sure not to damage the blower
O-ring gasket.
4. Install the propane venturi
1. Verify the following when aligning the propane
venturi:
1. The UP arrow on the plastic housing is pointing
upward.
2. The threaded connection for the gas piping is in
the correct orientation for re-tting the gas pipe.
Fig. 4: Instinct 199 Gas Train
Page 4
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
WARNING
!
Failure to retain the O-ring gasket between the venturi and the blower will cause an improper seal resulting
in a potential risk of a gas leak. A gas leak can result in
substantial property damage, serious injury, or death.
WARNING
!
Ensure the proper venturi for the model is installed
per Table 1. Failure to comply will aect input rate
and combustion of the boiler which can result in substantial property damage, serious injury, or death.
NOTICE
Do not use adhesive on any gaskets or O-rings during the reassembly process.
1. Using a 10 mm socket and ratchet, reinstall the
three (3) bolts securing the venturi to the fan assembly
2. Reassemble the gas valve to venturi pipe to the
gas valve and venturi taking care to ensure that the
gaskets are seated properly before tightening the
nut.
6. Attach the propane conversion label to the gas
valve and the propane conversion rating label next
to the existing rating label
7. Enter the propane (LP) appliance code from the
propane rating label supplied in the conversion kit:
1. Press and hold the UP and DOWN buttons together see Fig. 5.
Fig. 5: CTRLMax Navigation Control
2. Enter the installer access code “054” by using
the LEFT and RIGHT buttons to select a digit and
the UP and DOWN buttons to change the digit.
Press the center button to enter the access code.
3. With the CH/DHW Settings icon highlighted,
press the center button.
3. Install the venturi interface on the venturi and rotate counterclockwise until locked into place.
4. Install the air inlet elbow then attach the silicone
tube.
WARNING
!
Failure to properly install the air inlet elbow and attach the silicone tube can aect combustion of the
boiler which can result in substantial property damage, serious injury, or death.
5. Open the manual gas shut o valve to the unit.
Before placing the boiler back into operation, test
all gas connections for leaks and repair if leaks are
found.
WARNING
!
Do not check for gas leaks with an open ame. Use a
bubble test. Failure to test for gas leaks can result in
substantial property damage, serious injury, or death.
4. Press the DOWN button to highlight the Boiler
Settings icon then press the center button.
5. Scroll down to highlight Appliance Setting then
press the center button.
6. Enter the propane (LP) appliance code from the
rating label by using the LEFT and RIGHT buttons
to select a character and the UP and DOWN buttons to change the character. Press the center
button to enter the appliance code.
Page 5
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
5. Combustion Test and Adjustments
NOTICE
The installer MUST perform a complete combustion check
to ensure the following combustion levels are met at high
and low input ring rates and the burner is operating at optimum conditions.
WARNING
!
The combustion testing and adjustments must be performed by a qualied installer, service agency or the
gas supplier. All combustion measurements must be
performed with calibrated equipment to ensure proper readings and accuracy.
WARNING
!
NOTICE
An adequate CH load must be present to dissipate the heat
generated during the combustion test. If an adequate CH load
is not available, an indirect water heater can be used to dissipate the heat by creating a DHW call which will enable the
DHW circulator.
5. Press the RIGHT button to adjust the ring rate to
100% (high re). Hold down the RIGHT button to
rapidly increase the ring rate.
6. If the combustion levels during high re are outside
the recommended combustion settings (see Table 1),
adjust the THROTTLE SCREW (see Fig. 7) using a atblade screwdriver as follows:
Counter-clockwise adjustment of the THROTTLE
SCREW at High Fire (100% ring rate):
Failure to perform a complete combustion test at both
high and low input rates may result in incomplete
combustion and the production of carbon monoxide,
which can cause severe personal injury, death or substantial property damage.
1. Touch simultaneously on the up and down soft
keys for 3 seconds to access the functions for the
installer. See Fig. 5.
2. Enter the installer access code “054” by using the
LEFT and RIGHT buttons to select a digit and the UP
and DOWN buttons to change the digit. Press the
CENTER button to enter the access code.
3. Press the RIGHT button to highlight the Manual
Operation icon then press the CENTER button.
Manual Operation
FAN
CH1
DHW
CH2
Released
O
O
O
O
decreases and CO2 increases
2
Clockwise adjustment of the THROTTLE SCREW at
High Fire (100% ring rate):
O
increases and CO2 decreases
2
7. Once the combustion level is set at high re, manually place the boiler into low re mode by pressing
the LEFT button to adjust ring rate down to 1% (low
re).
8. If the combustion level (O
or CO2) during low re is
2
not are outside the recommended combustion settings in Table 1 contact Triangle Tube Technical Support.
9. Press the CENTER button while the fan icon is highlighted to shutdown the burner.
10. Press the LEFT or RIGHT button to highlight the home
screen icon to exit the service mode.
11. Replace the front panel and put the boiler back into
operation.
Fig. 6: CTRLMax Manual Operation
4. Press the CENTER button while the FAN icon is
highlighted to manually re the burner and power
the CH circulator. See Fig. 6
Page 6
INSTINCT NATURAL TO PROPANE CONVERSION INSTRUCTIONS
Table 1: Combustion Settings
Propane (All Models)
CO2 Range10.4 - 11.0%
Range5.1 - 4.2%
O
2
High Fire
CO Max200 ppm
CO2 Range10.4 - 11.0%
Ensure CO2 values measured are less than or equal to
High Fire CO2 measurements
O
Range5.1 - 4.2%
2
Low Fire
Ensure O2 values measured are higher than or equal to
High Fire O2 measurements
CO Max10 ppm
Throttle Screw
Fig. 7: Throttle Screw Location
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.