Unpacking
Open the shipping carton of the Switch and carefully unpack its contents, the carton
should contain the following items:
z One 24+2G, 24 port Fast Ethernet Layer 2 Switch.
z Mounting Kit: 2 mounting brackets and screws
z Four rubber feet with adhesive backing.
z One AC power cord.
z One RS-232 cable
z This Quick Installation Guide and CD.
Note: for “Stacking” features, please install the optional Gigabit Module (purchased
separately).
Installation
Follow the guidelines below to install the Switch.
z Do not place any object weighted more than 3Kg (6.6 lb) on the Switch.
z Connect the power cord to the Switch and the power outlet.
z Leave at least 10 cm (4 inches) of space around the Switch for heat dissipation.
Desktop or Shelf Installation:
When installing the Switch on the desktop or shelf, please attach the rubber feet to the
Switch. Peel off the protective paper on the pads and attach them on the bottom of the
Switch (one at each corner).
Rack Installation:
The 24+2G Switch is rack-mountable and you can install the Switch on an EIA-19 inch
equipment rack. To do this, first install the mounting brackets on the Switch’s side panels
(one on each side), secure them with the included screws, and then use the screws
provided with the equipment rack to mount the Switch on the rack.
2