
EM/3+ Meter Panel Mounting Kit
Important: Retain these instructions
UNPACKING
INSTALLATION
Installation Instructions
ACC/EM3+ PANEL KIT
ACC/EM3+ PANEL KIT
Installation Instructions
TG200202
Dimensions (mm)
1
80
Remove bezel
3
Remove DIN rail
5
141
160
90
front bezel
foam gasket
7
DIN rail
frame
60
4
Panel thickness
2
Remove screws
8 mm max
using screws
provided
ACC/EM3+ PANEL KIT Installation Instructions TG200202 Issue 1/A 13/4/99
1

ACC/EM3+ PANEL KIT Installation Instructions
INSTALLATION (continued)
Cut holes in panel
6
a use frame as template
140 mm
125 mm
45 mm
b cut and drill
Screw frame to panel
7
frame
panel
Place DIN rail on temporary
9
support tabs
plastic cup
tighten
2 screws
8
10
a
c
Clip on bezel
Clip meter to rail
b
ACC/EM3+ PANEL KIT Installation Instructions TG200202 Issue 1/A 13/4/992

Installation Instructions ACC/EM3+ PANEL KIT
INSTALLATION (continued)
Connect and configure
11
EM3+ Installation Instructions
TG100779
Step 4 to 14
Install rail and meter
13
assembly
12
b remove meter and rail
Remove rail and meter
assembly
a switch off
14
Bend fixing tabs
O
I
Close panel
15
ACC/EM3+ PANEL KIT Installation Instructions TG200202 Issue 1/A 13/4/99 3
16
Configure IQ and test system
EM3+ Installation Instructions TG100779
Step 16 to 17

ACC/EM3+ PANEL KIT Installation Instructions
Trend Control Systems Ltd reserves the right to revise this publication from time to time and make changes to the content
hereof without obligation to notify any person of such revisions or changes.
Trend Control Systems Ltd P.O. Box 34 Horsham Sussex RH12 2YF Tel:+44 (0)1403 211888 Fax:+44 (0)1403 241608 www.trend-controls.com
4
ACC/EM3+ PANEL KIT Installation Instructions TG200202 Issue 1/A 13/4/99