Trane 4TXCB003CC3HCB, 4TXCB004CC3HCB, 4TXCC008CC3HCC, 4TXCC005CC3HCB, 4TXCD009CC3HCC Installer's Manual

...
Page 1
Installer's Guide
I llllll lllll
18-AH44D1 -6
llll
lllllll lllll
llll
111111111111111111111111111111111
Cased Aluminum 11Convertible
4TXCB003CC3HCB 4TXCC007CC3HCB 4TXCB004CC3HCB 4TXCC008CC3HCC 4TXCC005CC3HCB 4TXCD009CC3HCC 4TXCC006CC3HCB 4TXCD01
ALL
phases
IMPORTANT-This tion
pack
HIGH Contains System
pressure. before for
refrigerant refrigerants, ant
additives.
Failure of
non-approved frigerant injury,
A.
GENERAL
These coils or
horizontal furnace
cooling only outdoor section
ANT.
This
equipment
Code
of equivalent. "Suitable for Mobile Home use" the
Furnace,
less.
Inspection
Check carefully for reported company immediately. Check to nents
are
to
your
only.
B.
APPLICATION
1.
FURNACE AND COIL
The
coil MUST
of
the
furnace. direction application.
of
this
upon
completion
A WARNING
PRESSURE
Refrigerant!
contains
Recover
opening
refrigerant
to
follow
additives
or
equipment
are
designed for
has
Federal
supplier
Regulations,
Coil
and
to
and
claims
in
the
unit. at
once,
BE
installed
The
of
the
airflow, depending on horizontal left
installation
Document is
of
work.
HAZARD
oil
and
refrigerant
refrigerant
the
system.
type.
Do
not
substitutes,
proper
procedures
refrigerants,
could
result
damage.
use
with
in
combination
using
R-410A
been
evaluated
Chapter
discharge
any
Any
and
INFORMATION
coil apex
duct
shipping
made
against
missing
replaced
downstream
can
be
face into
must
comply
customer
to
relieve
See
unit
use
subsittutes,
in
an
upflow, downfiow,
with a heat
in
accordance
XX,
work
damage.
the
sure
parts
should
with
with
property
under
high
pressure
nameplate
non-approved
or
refriger-
or
the
or
death,
REFRIGER-
Part
The
must
all
authorized
(in
or
serious
pump
with
3280
or
height
be 7 ft.
This
must
transportation
major
compo-
be
reported
parts
the
outlet
away
from
or
11
OCC3HCC
NATIONAL, STATE
and
is
to
use
re-
or
the the
of
or
be
air)
the
right
remain
These coils fit without zontal left application.
requires section
2. INDOOR Indoor
pump
IMPORTANT: Review
Check the table
dimensions
C.
RECOMMENDATION
1.
If
Installer's sections, components.
It
2. ied
and selected clearance allowances for service
with
any
changes
D,
unit
or
cooling combinations approved for
a coil is
Guide packaged
and
is
recommended
dimensions properly noted
installation
of
the
Coils
AND
LOCAL
this
unit.
the
171h'', 21",
adapters
to
numbers 5 and
UNIT
AIRFLOW
must
provide
your
on
the outline drawings
for
your
coil
part
of
the
comfort control for physically
that
site.
coil.
CODES
Please
return
and
241h''
in
vertical upflow, downflow,
Horizontal
the
coil
6).
the
installation requirements.
before beginning the installation.
total
with
the
By
noting
installation
right
before
required
system
the
furnaces,
outline
and
in
installation,
and
to service informa-
"width
installation
airflow for
drawing
checked
advance
furnaces
or
configuration
the
these
coils.
and
note
all
use
and
outdoor
installing
be
stud-
against
proper
possible
future
hori-
(see
heat
the
those
A341869P20
Page 2
Installer's Guide
A CAUTION
Coll
ls~.,,,,
It»
Mlln
t:Ot9
on
-bebw-=tbistb8
Is
ftllelH¢
1116fttnMt llnlle
D.
INSTALLING
t:het:lc
...
f0to20~
It»
pr1111n r.p
fol,_.,
Dlfrlled
'lBll:
COILS
"""'9M-
to
nrtwe
tublngmpa. ltno,..
flfl
lnlfall
(0
,,,.
MllW
t:oll.
Rtmo-.
tire,,...
COf9
'""'
aftlr
J
I
Dr111
Screw I
1. UPFLOW GAS
a. 'l\1m
b. Apply
c.
d.
e. 'l\1m
rwn-
-&my.
gaaket
ALL
matlllg
Set
the
duetwQ!k
Replacethefurnaoe
andflmten
coil case on top of t'b8
to
it~
the
fumac8 powar
2. UPFLOW GAS
a. 'l\1m furnace
-&my.
b.
Dieoonnect
and
N dw:twork
e.
burtall
d.
e.
£ 'l\1m
Rgure2
die
11trac:tion
Reconnect
Replace
and
the
faslm
the
eaaed
section
the
:!Umace
it
:!Umactt
J.l'UBNACB
JIOW9!'
Ol'F
and
remove
material
(d\d
lleal
aud'acM between t'b8
the
eoil
cue.
flu
J.l'UBNACB
~OFF
remove a
t.o
provide deUllDC8 for
coil
1011.owiDg
D·l
of
dumvurk
ftuo
IMICID'ely.
power
~-
pipeifithu
ON.
·Md-on
andl'EIDl.Cml
nfllcient
the IDlltallation
thMe
inatrw:tiou.
to
the
ccril
pipe
ilit
ON.
the
due
pipe
icld
supplied>
fanw:e
Cooling
portion
cue..
ha
Biid
Connect
been
1'811!0ved
the:Oue
of
tba
cued
been
removed
tha
pipeli
the •llP-
In·
FOR'VERllCAL
INSl'All.A110N8:
to
die
coll.
if
ooll
Stadofl'll
the
clearance alil"ment
par.
fanwle. The at.ando!!is
ment
tbrough
:Oauge.
air&w.
of
an
supported
_._.
iD
homoDtal.
3.
Whan a coll
lllld
-•(See
cased
coilll
for att.acllment to t.he
'holell
Drill
acren
are
uaed
ill.-ted
1mJa
(See
Figure
die
fh!nM!!I! t.llea
The coil
The
llhova
upflow
fanlace.
when
111'8 strictJ,y far
DOWNPLOW GAB PIJRNACB
is
ued
U.
not required
3).
'lb
is
alwQll placed downstream
intlnctimlB
The coil
used
iD the horizontal The lt:aDdo&
wuring
with
a downflmr fllrllace, a
betwam
dooring.
a.
Place
the
coil
cue
an
tbs
b.
Seeun1
c. Set the Canw:e
tbat
d.
Secure
4. DOWNPLOW GAB
a. 'l\1m the furnace
b.
Rai8CI
mount
reqainid
the
c.
P.bM:e
cl
Secure
e.
Set
that.
f.
JWimnM\
g.
'nlm
die
the
back
~the
t'b8 coil -
dillconrwt
the:111mace
die
to
funuu:e to
tbs
coil
t'b8
the:llmlace on
the
heek
~the
the
tbe
fimlace power
coil
cue
OD
top
ll1de
o!tbe
claet
thmce
J.l'UBNACB
powsr
the
tllal
to provide
mil
ca&& beneath
the
ezimng
be
railed.
C8ll8
on
con
-to
top
Iii.de
oft.he
claet
thmce
ilua
pipe
to
to
md
the
Figure
to
the
oi
of
2)
an
included
tlmw:e.
near the
acrewed
at
the
power
the
at
and
boUmn
engap
Udo
drill_._.
ildo
appl7
and
fulllace
alipmmt,
the
mil
iUrnace
planum.
die
coil
di8dwp
the
top
ibrnaca.
-Add
OFF,
-the
JiDes.
~t.deuan.ceto
it.
return
air
fanw:e
of
the
top
Sanges
the
cabinet aligu-
are
the
fiunace top
if
the
mil
:m.uat
not far
c:ue
and
mpply
cue,
making
opellillg
-
of
On Cooling
Modiflcalions
duetwmk
11111pply
plenum,
the
mil
cue,
melring
dillcbarp
the
the
openiq
top
-
of
bl
and power lines.
ON.
with
There are
the coil
of
wrap-
oitM
imarted
die
farmce
ill
on
top
be
fall1
md
aupport
1ubbue
combuatible
air
plenmn.
lllJl'e
is
&Diii
up
the
mil-.
:Bue
pipe,
and
will
be
to
permit.
air
plemun.
11ure
ill
a111
up
the
mil
eue.
02014Tiane
18-AH44DHS
Page 3
Installer's
Guide
5. FURNACE
IN
HORIZONTAL
A CAUTION
Both
the
coil
and
attempt
The
to
suspend
non-condensing furnaces
furnace
horizontal application.
The
condensing downflow/horizontal furnaces
Connection
with
may
brackets
the
furnaces.
only be
a. Horizontal left: As shipped,
the
horizontal left configuration.
In
horizontal left,
b.
apex
of
the
coil is
iary
drain
pan
is now on
c.
The
two piece baffle ships
required
d.
The the
for horizontal left applications. See
base
of
the
downflow/horizontal furnace. Upflow/horizontal
condensing furnaces
There
are
e.
furnace which together.
f.
Two
furnace The
three
See
brackets
and
rear
brackets
are
Figure
are
one
enclosure (two on each side rear bracket coil will be
g.
The
ter
as enclosure screws
brackets
and
front
possible
will
resting
furnace (see
used
to
attach
bracket
with
and
each
the
are
furnace. There
h.
guard guard nel of
the until is driven side
is a left is for horizontal left coil has a bend
of
the
coil case.
it
and
horizontal
rests
in
through
into
the
guard
must
the
coil
rotated
for coil/furnace
the
4TXC coil case
away
coil enclosure is placed flush
have
brackets
used
5.
used
to
bracket
will
be
attached
on
the
top
Figure
each
is positioned
the
wide edge
driven
packaged
which is
drain
The
guard
the
drain
the
coil case
splash
LEFT
be
fully
using
the brackets.
may
be
laid
and
onto
their
alignment
the
coil is
from
the
furnace
the
lower side.
installed
the
included
to connect
attach is
used
use
existing screws on
at
and
rear
narrow
coil
the
the with
bottom
6).
as
edge
on
match with
the
rear
to
attach
bottom).
the
Four bracket.
close to
against
into
the
coil enclosure
with
installation inserted pan
is
on
then
into
the
rotated
pan. One
duct
guard
flange on
side hole. See
POSITION
supported. Do
on
either
side for
upflow/horizontal
left side.
are
included
ready
when
is
rotated
the
and
coil
so
the
and
the
auxil-
is
Figure
against
the
top flange.
the
downflow
furnace
wide side
of
of
the
the
Each
the
horizontal
and
coil front. the
coil of
of
additional screws
the against the
cen-
the
furnace .
coil
Two
and
the
coil. This
only.
the
outlet
The
front chan-
air
side
downward
sheet
metal
screw
the
front
Figure
not
in
4.
coil
and
the
the
7.
TWO-PIECE BAFFLE
SHIPPED INSTALLED
ON
COIL
/DOWN
UPFLOW
CASED COIL CONNECTION
BRACKET FOR DOWNFLOW
FURNACE
FLOW HORIZONTAL
INSTALLATION READY
IN
HORIZONTAL
Figure 5
CASED
COIL
SHOWN
FURNACE
INSTALLED
AND
HORIZONTAL
Figure 6
"'
LEFT
0
HORIZONTAL
ALIGNMENT
Figure 4
"
"'
"'
"'
"'
"'...,'
~t"'"'
f'~
-
(.
/
0
LEFT
WITH A DOWN
BRACKETS
BRACKETS SHIP WITH
DOWNFLOW FURNACES.
REQUIRED FOR ALIGNMENT
ON
HORIZONTAL INSTALLATIONS.
FLOW
18-AH44D1-6
COIL
CASING
CHANNEL
Figure 7
3
Page 4
Installer's
Guide
6. FURNACE
IN
HORIZONTAL RIGHT POSITION
A CAUTION
Both the
attempt
The
The
Connection
a. Horizontal right:
b. Replacing
IMPORTANT:
The 4TXC cased furnace, with the apex the direction This placement supersedes previous furnace Installer's Guide stating the direction Figure
coil
and
to
furnace
suspend
non-condensing furnaces
the
must
coil
be
using
may
fully
supported. Do
only
the brackets.
be
laid
on
either
horizontal application.
condensing downflow/horizontal
furnaces
with
in baffle the CC006,
1. Remove bly (see the the
2. Replace previously (see
3. zontal
may
not
be
rotated
brackets
the
furnaces.
for coil/furnace
For
the
non-condensing furnaces only,
must
be removed
and
following models: 4TXCB004, 4TXCC005, 4TX-
4TXCC007,
Figure
5/16"
hex
the
the
head
and
4TXCC008.
factory
factory
4) from
installed
installed the
screws. Discard
baffle.
the
Figure
right
10.
top baffle
Figure
9 shows
application.
coil
must
of
the
airflow
install
of
"with the apex
airflow
using
8).
the
baffle change
be
of
the
coil
for
for
horizontal application." See
and
onto
upflow/horizontal
their
right
alignment
horizontal
the
right
the
two-piece factory
top baffle replaced for
baffle.
two-piece baffle assem-
apex
of
the
coil
the
bottom
the
screws removed
necessary
placed
downstream
always
horizontal
of
the
pointing
right
coil
by
side for
side.
are
included
configuration
removing
half
of
for hori-
of
the
opposite
installation. pointing
not
in
Figure
9
Figure 10
For Horizontal Right
Remove
and
UPFLOW
MODEL
HORIZONTAL
RIGHT
AIRFLOW
IN
POSITION
only
c.
When
the
noncondensing Upflow/Horizontal furnace
placed
on
its
right
side for
meets
the
flange fits inside
There
are
can
be
used furnace which
and
can
between
the
cased coil top flange.
of
the
furnace flange. See
three
holes
in
for pilot holes to connect
coil.
There
be
used
for
this
furnace
and
BAFFLE TOP PIECE
SHIPPED INSTALLED
ON
COIL
right
airflow,
the
The
coil flange
Figure
the
furnace top flange which
and
align
are
self
drilling screws included
connection.
Seal
coil.
Figure
furnace top
11.
the
all
gaps
8
is
UPFLOW
FURNACE
TOP
COIL
FLANGE
FITS INSIDE OF
UPFLOW FURNACE
TOP FLANGE FOR HORIZONTAL RIGHT APPLICATION
Figure
11
4
18-AH44D1 -6
Page 5
E.
INSTALLING
The
following
REFRIGERANT
steps
are
to
be
considered
refrigerant lines:
1. Determine
2. Consider types
the
most
of
bends
practical
to
be
tions.
NOTE:
bend
3. Determine
4.
5. Be
6.
7. Route
NOTE:
ture
installation.
F. The
1. More information concerning
Large
once
erant
tubing
TURE.
Provide a
both
liquid
hole
(if
which
is
sure
the
Uncoil
the
the
erly secure
These
and
the
FIELD
FABRICATED
diameter
it
has
been
the
best
--INSIDE OR OUTSIDE
pull
through
and
practical) should
resting
roll
tubing-
tubing
the
lines
holes
shaped.
starting
gas lines
on
the
of
tubing
do
not
making
tubing
must
must
tubing
hole of sufficient size
before malting final connections.
be
following procedure should
ing
to
the
coil
or
the
outdoor
ant
lines is covered
with
the
outdoor brazing procedures before
starting
in
unit.
are
the
installation
the
to
be
foundation.
is
kink
all required bends
be
sealed
INTERCONNECTING
Installers
Evacuation,
included
LINES
when
installing
way
to
run
the
lines.
made
and
space limita-
sizes
will
be
difficult
point for
routing
THE
the
STRUC-
to
clear.
The
location of
just
above
the
wall
of sufficient length.
or dent.
and
isolated.
be
from
weather
used
for connecting tub-
the
tight
unit.
the
installation ofrefriger-
Guide packaged
leak
testing
in
those
instructions
of
refrigerant lines.
refrig-
allow
this
plate
prop-
struc-
after
LINES
and
G.
the
BRAZING
IMPORTANT:
to
cut
and
There
is
TO
Do
fit
refrigerant
only a holding charge coil, therefore no loss when
the
sealing plugs
to
NOTE: wet heating characteristics
NOTE:
past tightening.
1.
2. Field supplied
3.
IMPORTANT: PAINTED AREAS SHIELDED DURING BRAZING.
4.
TXV
rag)
of
Torque
finger
Remove
are
soft soldered.
the
tube
ing
end.
from
Run
the
ets
of
Braze
and
bulb
or
removed,
the
sensing
specification
tight.
See
both
seals from
tubing
is
still
Clean
entering
refrigerant
the
indoor
evacuate according
installation instructions.
5.
li1ow a small
amount
while brazing.
6.
Use
good brazing technique
the
the
each
use
suction line
uninsulated
other.
7. Minimize
8.
Insulate
NOT allow
9. Do
with
10. Upon completion
ant
lines.
Installer's
EVAPORATOR
not
unseal refrigerant
lines.
of
operating refrigerant charge occurs
are
removed.
MUST
and
Figure
be
while
bulb
performance
Make
sure
12.
the
should
round
and
the
tubing
the
system.
tubing
unit
coil.
of
nitrogen
of
sharp
900
and
of
installation, evacuate
SECTION
of
dry
Nitrogen
protected
brazing
will
affect
of
for
TXV
to
backwrench
indoor coil.
be
cut
free
of
to
prevent
into
OF
THE UNIT MUST
to
indoor
through
to
make
bends.
its
fittings.
lines
to
Guide
tubing
(wrapped
the
tubing.
the
the
coil.
equals
The
squared-off,
burrs
at
contaminants
the
stub
and
the
leakproofjoints.
come
into
until
ready
in
the
indoor
with
Over-
functional
1/6
turn
when
braze
caps
ensuring
the
connect-
tube
BE
outdoor
tubing
contact
the
refriger-
sock-
18-AH4401-6
Figure 12
Do
Nm
frigerant checked. This or
open
lines
possible
discharge
A CAUTION
refrigerant valve
and
coil
hsvebeenbrszed, evacuated,
would
cause contamination
of
refrigerant
at
the
outdoor
of
to
the
unit
until
the
and
the
refrigerant
atmosphere.
re-
leak
5
Page 6
Installer's
H.
LEAK
1. Using a manifold
2. Pressurize
Leak
3.
4. Evacuate
L CONDENSATE
Condensate at
the threaded ternal
1. The
Insulate
2.
It
is
installed
90% rate
IMPORTANT:
used.
CHECK
gauge,
dry
nitrogen to
PSIG
maximum.
the
gauge
the
connecting lines
check brazed line connections using soap bubbles.
Repair
packaged
leaks
and
with
(if
any)
charge
the
the
outdoor unit.
DRAIN
drain
connections
bottom
of
the
coil/enclosure assembly. The female
fitting protrudes outside
connection.
drain
hole
in
the
drain
insulation.
the
drain
line to
always recommended
under
a horizontally installed evaporator coil
gas
furnace. Connect
drain
line (no
Do NOT
trap
Plug
use
is
all
heat
Guide
connect
after
system
prevent
that
the
needed
drain
or
an
port
on
and
relieving pressure.
per
PIPING
are
located of
the
pan
must
sweating
an
auxiliary
auxiliary
in
this
line
connection(s)
torch
near
external supply
the
liquid line.
indoor coil
the
in
to
instructions
the
drain
enclosure for ex-
be
cleared
drain
and
drain
line
of
dripping.
pan to
line).
drain
fittinp.
of
150
pan
all
be
or
a sepa-
not
J.
INSPECTING
The
two piece door (3-piece
of
removal refrigerant removed
the
or
the allow inspection removed
to
the
THE
COIL
on
24.5" wide models) allows
outer
casing doors
without
condensate lines. Once
split
inner
coil panels
of
the
inside
of
the
outside where
it
can
interference from
the
outer
can
be
moved to easily
coil.
The
be
washed
doors
coil can
with
a
hose. See Service Guide UN-SVGOOlA-EN for details.
The
foil covered insulation wiped down up
to
and
maintain
residual
good
air
on
the
dirt
and
quality.
4TXC coils should
dust
should
be
See
Figure
14.
vacuumed
are
be
water
be
Field fabricated trap
Figure 13
PRESSURE DROP CHARACHTERISTICS
Model
4TXCB003CC3HCB 4TXCB004CC3HCB 465 685 865 1015 1155 1280 1395 1505 4TXCC005CC3HCB 4TXCC006CC3HCB 4TXCC007CC3HCB 4TXCC008CC3HCC 4TXCD009CC3HCC 4TXCD010CC3HCC
CAP
OR
PLUGJ'(
Close
as possible 1
Trap
must
be
of
furnace
condensate
within
I air
handler
drain
PRESSURE DROP (INCHES
.05 0.1
510
550
460 550 680 670 670
1111(1)1io11111(,..
4'
connection.
AIRFLOW (CFM)
I
715 875 1005 1125 1230 1325 1415
820 1030 1210 1375 1525 1665 1795 715 930 1115 1290 1450 1600 1740 820 1030 1210 1375 1525 1665 1795 965 1190 1375 1540 1685 1820 1950
1000 1250 1470 1670 1850 2020 2180
1000 1250 1470 1670 1850 2020 2180
K.
DUCT
The
unit connections openings
CONNECTIONS
supply
with
and
a flame
are
of
the
L OPERATIONAL AND CHECKOUT
"Operational Procedure" for
found
in
the
outdoor
patible
FOR
COOLING AND HEAT PUMP COILS
VS. PRESSURE DROP
OF
WATER COLUMN)
0.15 0.2 0.25
with
this
Figure 14
return provided
air
retardant
at
duct
should be connected to
duct both supply
coil .
the
system installation
unit
Installer
coil
0.3 0.35 0.4
connectors.
Guide
the
Duct
flange
and
discharge
PROCEDURES
can
and
will
be
com-
be
6
18-AH44D1-6
Page 7
......
~
~ ~
0
......
o,
li
lJC
T
F
LA~GE-
-i------~~-~~
SC
HRA
liE~
\'AL'I
GAS
CONNECTI
LIClJI 0 C:ONN
ECTIO
A
14-HI~
I
<~14
E-
O
Outline
Drawing
--~~~~~-o~~~~~~-
for 4TXCB003CC3HCB, 4TXCB004CC3HCB, 4TXCC005CC3HCB,
4TXCC006CC3HCB, 4TXCC007CC3HCB, 4TXCC008CC3HCC
(All dimensions are
r,
01
al
,.
in
inches)
ll.Xl
{i[[)
SECONOi\R~
IH
UIN
31
4
MPT
FOR HORIZO
MUL
POSITI
ON
LL.kjG
EI)
Prnu.n 1>R1t1w
.31-(
I
~
PT
FOO HORIZONTAL
POSITI
ON
R
IMA
RY
liRr\IN
Jf
4'N
PT
FOR VERT
IO.L
POSITION
LLiS
G[[)
m
mm
11rn
3!
4' N
PT
FOR
VERT
ICr\L
POSITION
~
2-1
12
---
~
r
'"
......
1
+3/li-
1-
9/16
.-------------
I0-11· -
OP
EN
ING
IN
WRr\PPE~
21·
l/2
•.
1
-
:I
!
l.tXlEl
W8Cffl'
LBSJ
llEfRIBWfT
IBlHT
"A"
OVERAU.
WIDlH
(J'E1ft3
WllTM
TOP~
GAS
CCN'EllON
Ull.ll
CCN.ECTlCJl
lilATCIBl
IN>
ADAP'!Bl
lllAt.I
PAN
H
MAY
BE
·A·
CClfll!DL
\IN.I
·c·
1r
FlllNACE
RECl.HIJI
OR
'11"
·e·
fil
fil
WDTII
4
!XCliOOJCl:JICB
45
12-51
11-112 I
o-1
12
I 5-3
14
518 BRAZE
8
41XCB004CCJl«:B
7-111
1
49
26
-116 11-1/1 16
- 112 15-
314
3/ 4 BRAZE
4
TXCCOOl!CC3ICB
48
TX
V I NON
-BLEED
I
12-5 16
11 21 20 20
19-1
14
5/8 BRAZE
318
BRAZE
PLAST
IC
•r=oosc=c•
4TXCC007CG3f'f:8
16-11
51
21
8
19-114
3/
4 BRA
I
I
I
..
TXCC009CCKC
65
30-11/ I6
ZE
From Dwg. D343414Rev3B
II
-
-
CD
..
~
c
a.
CD
Page 8
~~
j2i
..
~
[ii!
~r·
~i
If
9;~
f i
-....$l_
.a·r
~
6'
~
:I'
~
~
~
CD
iii
i
1~
t~
~
Ill~
~i
-
ao
-
~
ii
a:~·
a a
§'
i~
~
.,,.
:>
::c
.,,.
.,,.
0
-
J.
ii
~
~
Q.
l
2-
it
~-
a
I
...
""
i
9-
CD
c:
!!
..
ii
z
a
c
c
3
Ci!
CT
0
!!l
a.
CD
~
z
c
3
CT
!!l
-
ao ao
-
:>
>
::c
::c
.,,.
.,,.
.,,.
.,,.
0 0
--
m m
OLX:T
FLANGE
~----..-"--~----------'---'
SC
H
~AliER
VAL
GAS CONNECTION
LIQU
ID
CONNECT I ON·
1-111
14-1
2-112
12
5-HI~
16
I
·J/4
l·Ql
A
+------------22
VE
l•
+-------------Z4-l/Z--------------
Outline
Drawing
-Jn
-------------<
for 4TXCD009CC3HCC
(All dimensions are in inches)
Ille
-PLUGG[[)
SECONDi\.RY
DRAIN
J/4'MPT
FO~
Hl)R I ZONTAL
P
OSITION
PLUGG[[)
PR
l~ARl
DUIN
J/4" N
PT
FO~
HC>R I ZONTAL
POSITION
WMAR!
DIAIM
J/4"NPT
FO~
VEnlCr\l
P
OSITION
·PLUGG[!)
moND!RYDiAIN
3/4'
NPT
FO~
VEUICU
POSITION
MOOE!.
WEIGHT
ll.BSJ
REFRIGERANT
HEICHT
GAS LIQUID MA
TCl'El
(I«>
DRAIN
-MAYBE"A"OR"B"
CONTROL
T
•r-LJ
CCHECTICW
CCH.ECTKlN
FURNACE
ADAPTER
RECl.llEDJ
PAN
WIDTH
and
4TXCD010CC3HCC
,,......_
2-1/2
0 0 0 0 0
I
21-7/IG
4TXCDOOEICC3H::C 4TXCCOllCCJICC
68
TXV
INON-BLEEDI
30- 11/I6
BRAZE
314 318
BRAZE
24-1
/2
PLA
STIC
____
OPENING
IN
WRAPPE~
"'"
From
Dwg.
D343415Rev03B
___,,
17
I
18