Page 1
Page 2

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Move carton to a clean location with 3
or more feet of room around the unit.
1
GOKARTMASTERS.COM
Remove outer cardboard from crate.
2
Remove metal crating and unpack all
parts.
4
GOKARTMASTERS.COM
Place parts out on the floor and take
inventory making sure of proper quan-
5
tities. At this time, if missing or damaged
parts, call or email us.
GOKARTMASTERS.COM
Remove all bolts from metal crate with
9/16” wrenches or socket.
3
GOKARTMASTERS.COM
Remove bolts and nuts at lower front Aarms
6
Page 3

GOKARTMASTERS.COM
Remove axle straps and discard.
7
GOKARTMASTERS.COM
Locate white box with battery.
8
Lay out all hardware on a clean work
10
bench. Take inventory per hardware
list.
GOKARTMASTERS.COM
Locate one of the long cage bars.
11
GOKARTMASTERS.COM
See Battery Fill Procedure Instruction
Sheet. Fill battery according to Instruc-
9
tion Sheet . Let sit.
GOKARTMASTERS.COM
Place bar on front pin above head-
12
light.
Page 4

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Place rear of bar onto pin at rear be-
13
14
hind seat.
GOKARTMASTERS.COM
Locate 2 long bolts, 4 nuts & 8
chrome cup washers.
It may be necessary to align the hole
16
17
NOTE: DO NOT TIGHTEN AT THIS TIME.
in the bar with a screwdriver.
GOKARTMASTERS.COM
Install a second cup washer and the
nut.
GOKARTMASTERS.COM
Install with washer into front of bar
15
from the outside.
GOKARTMASTERS.COM
Install bolt, washers and nut at rear of
18
bar.
Page 5

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Repeat steps 16-19 for the other top
19
bar.
GOKARTMASTERS.COM
Locate the passenger side bar.
20
Place the side bar onto the passen-
22
23
ger’s side of the go-kart.
GOKARTMASTERS.COM
Turn the plastic cap with a pair of pliers to align the side bar to the top
bar.
GOKARTMASTERS.COM
Locate 4 large bolts, 6 cup washers
21
and 2 nuts.
GOKARTMASTERS.COM
It is necessary to tap the plastic cap
24
or rubber mallet or a block of wood with a
standard hammer.
all the way onto the bar. Use a plastic
Page 6

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Install the top bolt & washer first.
25
26
Start the threads but do not tighten.
GOKARTMASTERS.COM
Now, install the bottom bolt and
washer from the front.
Repeat steps 20-27 for the driver’s
28
29
side bar.
GOKARTMASTERS.COM
Locate the top bar weldment assembly.
GOKARTMASTERS.COM
Install the second washer and nut on
27
NOTE: DO NOT TIGHTEN THE HARDWARE.
the bottom bolt.
GOKARTMASTERS.COM
Locate 4 large bolts and 4 chrome
30
cupped washers.
Page 7

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Install the top bar assembly.
31
GOKARTMASTERS.COM
Start each of the 4 bolts with cupped
32
NOTE: DO NOT TIGHTEN HARDWARE .
washer into the threads of the top bar.
Locate 2 long bolts and 2 chrome
34
35
cupped washers.
GOKARTMASTERS.COM
Install the short bar behind the seats.
Start the bolts with washers into the
threads.
GOKARTMASTERS.COM
Locate the short rear bar.
33
GOKARTMASTERS.COM
Tighten ALL of the bar bolts previ-
36
ously installed with a 10mm & 12mm
wrenches.
Page 8

GOKARTMASTERS.COM
Locate the fuel tank.
37
is already installed on the engine. Check tank
mounting hardware to insure tight. Proceed
to Step 46.
38
NOTE: On some models, the fuel tank
GOKARTMASTERS.COM
Locate 4 long bolts and nuts and fuel
hose clamp.
Install the 4 bolts and nuts into the
40
41
tank.
GOKARTMASTERS.COM GOKARTMASTERS.COM
Tighten with a 10mm & 12mm
wrenches.
GOKARTMASTERS.COM
Place the fuel tank onto the rear rack
39
with decal to the rear.
GOKARTMASTERS.COM
Locate the end of the fuel hose on top
42
of the engine.
Page 9

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Place the fuel hose clamp onto the
43
filter that’s already attached to the fuel tank.
44
1/4” from the end of the hose.
hose and push the hose onto the fuel
GOKARTMASTERS.COM
Using pliers, place the fuel hose
clamp on the filter approximately
Now, it’s time to install the rear
46
bar from the passenger’s side shock mounts.
NOTE: SAVE THE BOLTS & NUTS.
shocks. Remove the metal shipping
GOKARTMASTERS.COM
Discard this bar.
47
.
GOKARTMASTERS.COM
Turn fuel valve to ‘ON’ position.
45
GOKARTMASTERS.COM
Locate one (1) shock.
48
Page 10

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Place the top shock eye into the
49
bolt and washer that was removed in Step 46.
50
the rear swing arm.
bracket with the spring up. Reinstall
GOKARTMASTERS.COM
Lift up on the rear rack and align bottom shock eyelet with the bracket on
Tighten top and bottom shock bolts
52
53
with wrenches.
GOKARTMASTERS.COM
Repeat Steps 48-52 for the driver’s
side rear shock.
GOKARTMASTERS.COM
Install bottom shock bolt and nut.
51
GOKARTMASTERS.COM
At this time, lift the rear of the go-kart
54
kart on a jackstand. Be safe. Use caution.
with the help of an assistant. Place the
Page 11

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Place the battery pad into battery tray
55
located behind the passenger’s seat.
GOKARTMASTERS.COM
Install the battery in the cart with the ter-
56
cable (red) to the ‘+” on the battery. Next, install
the negative cable (black or green) to the ’-’ on
the battery. NOTE: Use pliers to hold the nut while
using a Phillips head screwdriver to tighten the
screw.
minals to the rear. First, install the positive
Place rubber battery strap over bat-
58
tray first. Then, pull the strap over the battery
and place it on the rear hook of the battery
tray. If necessary, use pliers.
tery hook to the front of the battery
GOKARTMASTERS.COM
Locate the set bolt on the sprocket
59
hub and tighten securely.
GOKARTMASTERS.COM
Place gray plastic cover over bat-
57
tery.
GOKARTMASTERS.COM
Locate the rear passenger’s side
60
wheels. The tread on top of the tire will point
towards the front of the go-kart & the air valve
stem will be facing towards the outside.
wheel. This is one of the larger
Page 12

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Place the wheel onto the rear axle.
61
GOKARTMASTERS.COM
Place the largest washer and castle
62
nut onto the axle.
Install the cotter pin into the axle nut.
64
the end of the axle. Clip off other end with
cutters.
65
Bend one end of the cotter pin over
GOKARTMASTERS.COM
Install rubber hubcap over axle nut.
GOKARTMASTERS.COM
Tighten the castle nut securely and
63
align the holes in the axle with the
nut.
NOTE: Repeat Steps 60-65 for the driver’s
side rear wheel.
GOKARTMASTERS.COM
Lift front of go-kart and support with
66
jack stands.
Page 13

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Locate passenger’s side top spindle
67
NOTE: Save cotter pin.
68
NOTE: Save cotter pin.
nut and remove cotter pin.
GOKARTMASTERS.COM
Locate passenger’s side bottom spin-
dle nut and remove cotter pin.
Make sure the hole in the spindle
70
71
driver’s side spindle.
lines up with the castle nut.
GOKARTMASTERS.COM
Reinstall cotter pins. Bend and cut off
excess. Repeat Steps 67-71 on the
GOKARTMASTERS.COM
Tighten both nuts securely with a
69
17mm wrench.
GOKARTMASTERS.COM
Locate outer steering joints and tight-
72
socket on the nut and a 12mm wrench on the
top.
en the nut securely using a 12mm
Page 14

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Locate the front passenger’s side
73
side front axle. The tread on top should point
forward with the air valve stem to the outside.
74
wheel and place it on the passenger’s
GOKARTMASTERS.COM
Locate 2 castle nuts, 2 washers and 2
cotter pins.
Check tire pressure in all 4 tires. Set
76
sure gauge to check the tire pressure.
77
NOTE: Lowering this bolt will restrict the top
speed of the go-kart.
to 10 PSI. You will need a low pres-
GOKARTMASTERS.COM
Locate the throttle stop and tighten
the jam nut securely.
GOKARTMASTERS.COM
Install cotter pin and bend. Cut off
75
on the driver’s side.
excess cotter pin. Repeat Steps 72-75
GOKARTMASTERS.COM
Locate the steering box clamps and
78
curely with 8mm & 10mm wrenches.
NOTE: Plastic connector should be next to the
metal clamp.
tighten all four (4) bolts and nuts se-
Page 15

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Locate the three (3) small bolts and
79
nuts.
GOKARTMASTERS.COM
Locate the steering wheel.
80
Tighten bolts securely with two (2)
82
83
10mm wrenches.
GOKARTMASTERS.COM
Install the plastic steering wheel cap
by snapping it into place.
GOKARTMASTERS.COM
Install the steering wheel with the center
81
NOTE: If the steering wheel does not line up correctly with the front wheels, continue mounting the
steering wheel as close as possible.
spoke facing down & the front wheels
straight forward.
GOKARTMASTERS.COM
If the steering wheel is not straight
84
straight, locate the plastic gearcase on the
steering box.
when the front wheels are pointing
Page 16

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Remove plastic cap from the bot-
85
driver.
86
way the steering wheel needs to be turned to
align correctly.
tom of the plastic case with a screw-
GOKARTMASTERS.COM
Make sure the front wheels are
straight ahead and determine which
Pull steering wheel and shaft out of
88
steering wheel gently.
89
the gear. You may need to bump the
GOKARTMASTERS.COM
Hold the gear in place with your
finger.
GOKARTMASTERS.COM
Remove steering shaft nut with
87
17mm socket.
GOKARTMASTERS.COM
Turn the steering wheel straight and
90
gear.
push the shaft back down into the
Page 17

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Reinstall the nut securely. Reinstall
91
into place.
92
ahead.
the plastic cap by simply pushing it
GOKARTMASTERS.COM
Now, it’s time to align the steering.
Turn the steering wheel to straight
The front wheel should be in a
94
parallel.
NOTE: The front of the go-kart is wider than
the rear.
95
straight line with the rear wheel or
GOKARTMASTERS.COM
The measuring tape in the pictures
is for sight reference ONLY!
GOKARTMASTERS.COM
Stand approximately 10 feet in front
93
passenger wheel in relationship to the rear
passenger wheel.
of the go-kart and look at the front
GOKARTMASTERS.COM
Adjust the passenger tie rod ac-
96
cordingly to align the wheel.
Page 18

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Hold the rod with a 10mm wrench
97
(standard thread).
98
and loosen the outer jam nut
GOKARTMASTERS.COM
No w, lo osen the i nner nut
(backwards thread).
Hold the rod with a wrench and
100
GOKARTMASTERS.COM
101
tighten the jam nuts securely.
Repeat Steps 92-100 for the driver’s side.
GOKARTMASTERS.COM
Now, adjust the wheel in or out by
99
turning the rod.
GOKARTMASTERS.COM
For final front end alignment pro-
102
turn toward each other approximately 1/4” to
1/2”.
cedure, the front wheels should
Page 19

GOKARTMASTERS.COM
GOKARTMASTERS.COM
Measure across the front wheels
103
rear of the tires and adjust accordingly according to the procedures in Steps 92-100.
104
the go-kart.
that the front of the tires and at the
GOKARTMASTERS.COM
Locate the foam padding and
place it on the top outside bars of
Tighten inner air filter nut secure-
106
and nut.
GOKARTMASTERS.COM
107
NOTE: This is ONLY on the Mini XRX-R
ly with fingers. Reinstall cover
Locate the shift cam. Tighten both
cables with a 12mm wrench.
GOKARTMASTERS.COM
Remove air filter nut and cover.
105
GOKARTMASTERS.COM
Cut and remove all strings on can-
108
opy top and pad covers and dispose.
Page 20

GOKARTMASTERS.COM
GOKARTMASTERS.COM
You’re almost done! Just a few
109
you will be ready to ride your new go-kart.
pre-drive items to inspect, and
GOKARTMASTERS.COM
Locate oil dipstick on front of en-
110
With the go-kart sitting on level ground, the
oil level should be to the top of the threads. If
not, fill with 10W30 oil.
gine behind the driver’s seat.
It is highly recommended to use
112
such as Seafoam or Stabil. Follow manufacturer's instructions on the bottle.
a fuel additive or fuel stabilizer
GOKARTMASTERS.COM
If there is no passenger in the go-
113
keep it from dragging the ground or from
being run over by the rear tire.
kart, keep the seat belt buckled to
GOKARTMASTERS.COM
Fill fuel tank 3/4 full with premi-
111
NOTE: Follow all gasoline handling precautions and fuel can.
um high octane fuel.
GOKARTMASTERS.COM
Make sure the fuel valve is on.
114
Page 21

GOKARTMASTERS.COM
GOKARTMASTERS.COM
There should ALWAYS be some-
115
before starting the go-kart.
GOKARTMASTERS.COM
116
one seated in the driver’s seat
ALWAYS engage the parking
brake before starting the go-kart.
Pull the choke control out firmly
118
GOKARTMASTERS.COM
119
and hold.
Push the red Start Button.
GOKARTMASTERS.COM
Insert ignition key and turn to the
117
‘ON’ position.
GOKARTMASTERS.COM
It may be necessary to run the
120
(halfway pulled out) for 30 seconds to 1 minute to warm up the engine.
engine on choke or partial choke
Page 22

GOKARTMASTERS.COM
Turn the key to ’OFF’ or push the
121
go-kart engine off.
stop button and hold to turn the