TownSteel TSF-300A, TSF-300, TSF-120 Installation Instructions Manual

B A
TSF-300A/300/120 CENTER HUNG PACKAGES
INSTALLATION INSTRUCTIONS
INSERT THE SPINDLE INTO THE FLOOR HINGE.
1
4
5
2
3
PUT THE WASHER FIRST AND FIT END SQUARED & ANGLED PART OF SPINDLE INTO HOLLOW AREA AND TIGHTEN IT BY USE OF SPINDLE SCREW READY ALREADY.
TURN THE ADJUSTMENT SCREW IN A ANTICLOCKWISE AND RELEASE PIVOT PIN . INSTALL THE PIVOT INTO UPPER PART OF DOOR FRAME. AND COVER IT.
INSERT PIVOT CHANNEL INTO TOP OF DOOR, INSTALL BEARING INSERT INTO PIVOT CHANNEL. TIGHTEN UP THE ADJUSTMENT SCREW ALMOST AND CONTROL THE CENTER POINT OF PIVOT. FIX THE BEARING TO THE VERY PROPER LOCATION.
INSTALL IN THE CENTER OF THE FLOOR HINGE CEMENT BOX AND TIGHTEN THE FASTENING SCREWS.
MAKE CEMENT BOX AND PUT THE FLOOR HINGE IN THE CEMENT BOX.
THE UPPER PART OF THE CEMENT BOX SHOULD BE ON THE LEVEL WITH THE FLOOR SURFACE. THE CEMENT BOX SHOULD BE A LEVEL SURFACE. ADDITIONALLY THE CENTER OF SPINDLE HAS TO BE POSITED CORRECTLY. FULFILL GROUT AROUND CEMENT BOX.
(LH Door) (RH Door)
CAUTION
-
PUT THE WASHER FIRST.
SPINDLE SCREW
SPINDLE
WASHER
ADJUSTMENT SCREW
PIVOT
COVER PLATE
FOR SINGLE ACTION OFFSET 3 °.
FOR DOUBLE ACTION
STANDARD TYPE SPINDLE
FLOOR FINISHED
BEARING INSERT
ADJUSTMENT SCREW
POIVOT CHANNEL
TOP PIVOT
CAUTION:
1.Dimension indicated is not a real size.
2.Dimensions are in mm.
3.All reinforcement accessories for bottom arm should be prepared by user.
34
25
18
32
Min 34
7
5
25
5
100
169
126
13
70
1479
70
45 25
DOOR GAP 3
12.5
12.5
135
25
90
12
12
Holes for pivot insert x 4 ea
Use
Ø
5.1 drill for M6 X 1.0 mech. Screw.
Holes x 5 ea
Use Ø 4.3 drill for M5 x 0.8 mech. Screw.
REAR view
Door frame position
Front view
SIDE view
PLANE VIEW
R65
DOOR area.
COVER PLATE
C/L
BOTTOM ARM
CAUTION:
1,Dimension indicated is not a real size.
2,Dimensions are in mm.
3,All reinforcement accessories for bottom arm should be prepared by user.
Holes x 5 ea
Use Ø4.3 drill for M5 x 0.8 mech. Screw.
2024
70
36
DOOR GAP 3
Floor area nished
5940
52 52
52
201
Front view
Rear View
R65
C/L
FASTENING SCREWS
B A
TSF-300A/300/120 OFFSET HUNG PACKAGES
INSTALLATION INSTRUCTIONS
INSERT THE SPINDLE INTO THE FLOOR HINGE.
1
4
5
2
3
PUT THE WASHER FIRST AND FIT END SQUARED & ANGLED PART OF SPINDLE INTO HOLLOW AREA AND TIGHTEN IT BY USE OF SPINDLE SCREW READY ALREADY.
INSTALL TOP PIVOT
REMOVE CAP, PIVOT PIN AND THEN INSTALL TOP PIVOT.
INSTALL BOTTOM ARM.
INSTALL IN THE CENTER OF THE FLOOR HINGE CEMENT BOX AND TIGHTEN THE FASTENING SCREWS.
MAKE CEMENT BOX AND PUT THE FLOOR HINGE IN THE CEMENT BOX.
THE UPPER PART OF THE CEMENT BOX SHOULD BE ON THE LEVEL WITH THE FLOOR SURFACE. THE CEMENT BOX SHOULD BE A LEVEL SURFACE. ADDITIONALLY THE CENTER OF SPINDLE HAS TO BE POSITED CORRECTLY. FULFILL GROUT AROUND CEMENT BOX.
(LH Door) (RH Door)
CAUTION
-
PUT THE WASHER FIRST.
SPINDLE SCREW
SPINDLE
WASHER
FOR SINGLE ACTION OFFSET 3 °.
FOR DOUBLE ACTION
STANDARD TYPE SPINDLE
FLOOR FINISHED
CAUTION:
1,Dimension indicated is not a real size.
2,Dimensions are in mm.
3,All reinforcement accessories for bottom arm should be prepared by user.
FASTENING SCREWS
BOTTOM OF DOOR
OFFSET ART
FRAME POSITION
DOOR POSITION
PIVOT PIN
CAP
TOP PIVOT
OFFSET ARM
FRONT VIEW
FRONT VIEW
BACK VIEW
BACK VIEW
CAUTION:
1.Dimension indicated is not a real size.
2.Dimensions are in mm.
3.All reinforcement accessories for bottom arm should be prepared by user.
Loading...
+ 1 hidden pages