Toro 99-3745 Installation Instructions

FORM NO. 3321-592
CHOKE AND THROTTLE CABLES KIT
PART NO. 99-3745
Loose Parts
Note: Use the chart below to identify parts used for assembly.
DESCRIPTION QTY. USE
1 1
Install replacement cables
1 1
Install Cables
1. Remove existing throttle and choke cables from
tractor (Fig. 1).
INSTALLATION
INSTRUCTIONS
2
Note: Save all hardware for use when
installing new cables.
2. Observe location of boots on ends of new
throttle and choke cables. Remove boots.
3. Remove jam nut from new choke cable (Fig. 1).
4. Route throttle lever through rear of dash and
secure with screws previously removed. Press knob onto throttle lever (Fig. 1).
5. Route choke cable through front of dash and
secure with jam nut previously removed (Fig. 1).
1
1. Throttle
2. Knob
Figure 1
3. Choke
4. Jam nut
3
4
m–4024
6. Align adapter so tabs are below engine cable
bracket (Fig. 2).
7. Secure adapter to engine cable bracket with new
#10-32 x 1/2” (13 mm) screw (Fig. 2).
2
12. To adjust cables, move throttle lever to the
“FAST” position and pull the choke to the full “CHOKE” position.
13. Loosen clamp screw and push the cables up, at
the adapter, until engine controls are against their stops (Fig. 3).
14. Tighten cable clamp mounting screw securely
(Fig. 3).
1
m–4025
Figure 2
1. Adapter tab 2. Screw #10-32 x 1/2’ (13 mm)
8. Route cables the same as previous routed.
9. Install boots onto throttle and choke cables as
previously positioned.
10. Hook cable Z ends into lower holes of engine
controls as shown (Fig. 3).
11. Place cables against adapter and secure with
previously removed cable clamp, washer and screw (Fig. 3).
1
3
2
4
5
1. Throttle Z end
2. Choke Z end
3. Bottom hole
4. Adapter
2
6
7
m–4026
Figure 3
5. Cable clamp
6. Washer
7. Screw
Loading...