Toro 78497, 78496 Addendum

44 and 52 Finishing Kit
100 Series Z Master 44 Mowers 100 Series Z Master 52 Mowers
Important The following instructions are updates for
the installation instructions sent with the Finishing Kit. Replace procedure number 5 in both Step 4 on page 7
and in Step 5 on page 8.
The correct hole size to drill is 11/32 inch dia., as shown below.
Step
Form No. 3329–235
Addendum
Step
5
Installing the Right Rear Baffle
4
Installing the Left Rear Baffle
5. Drill 11/32 inch dia. holes through the pilot holes
(Fig. 12).
6
5
1 8 4
1. Left rear baffle
2. Left side of mower
3. Button head socket bolt, 5/16 x 3/4 inch
4. Flange nut, 5/16 inch
Figure 12
5. Hole to drill
6. Rear center baffle
7. Mower flange
8. Tab
2
3 7
5
m–6179
5. Drill 11/32 inch dia. holes through the pilot holes
(Fig. 14).
3
4
2
7
15
6
5
m–6177
1. Rightrear baffle
2. Right side of mower
3. Carriage Bolt, 5/16 x 5/8 inch
4. Button head socket bolt, 5/16 x 5/8 inch
5
Figure 14
5. Flange nut, 5/16 inch
6. Holes to drill
7. Mower flange
4
2002 by The Toro Company 8111 Lyndale Avenue South Bloomington, MN 55420-1196
All Rights Reserved
Printed in the USA
1
Loading...