Toro 30142 Installation Instructions

FORM NO. 3319–985
36” Recycler Kit
for Mid-Size Mowers
MODEL NO. 30142
Loose Parts
Note: Use the chart below to identify parts for assembly.
DESCRIPTION QTY. USE
Baffle Bolt 5/16–18 x 5/8” (16 mm) Flange nut 5/16–18
Blocker plate Bolt 3/8–16 x 1” (25 mm) Flange nut 3/8–16 Bolt 1/4–20 x 3/4” (19 mm) Flange nut 1/4–20
1 1 6
1 1 1 2 2
Install Recycler baffle
Install blocker plate
INSTALLATION
INSTRUCTIONS
Cover plate Bolt 3/8–16 x 3/4” (19 mm) Flange nut 3/8-16
Kicker Bolt 5/16–18 x 5/8” (16 mm) Flange nut 5/16-18
Recycler blade 2 Replace standard blades on mower
Preparing the Mower
1 4 4
2 4 4
Cover discharge opening
Install kickers
3. Tilt the mower up and support with jack stands
to ease installation of kit.
1. Remove belt cover from top of mower.
2. Thoroughly clean underside of the mower. All
debris must be removed to ensure that baffles and kickers will fit properly against the cutting chamber.
4. Flip up discharge chute and remove the
discharge baffle near discharge opening (Fig. 1). Note: Replace hardware in top of mower
when baffle is removed for safety and to save for use when using mower to side discharge.
The Toro Company – 1998
Printed in USA
All Rights Reserved
Installation Instructions
2
POTENTIAL HAZARD
Open holes in the mower expose you and
others to thrown debris.
WHAT CAN HAPPEN
Debris thrown out of holes in the mower
can cause injury.
HOW TO AVOID THE HAZARD
Never operate the mower without hardware
mounted in all holes in the mower.
Install hardware in all open holes when the
Recycler kit is removed.
1
Figure 1
1. Discharge baffle
m–3923
3
2
1. Baffle
2. flange nut 5/16-18
Figure 2
3. Bolt 5/16–18 x 5/8” (16 mm)
m–3924
3. Place the blocker plate inside cutting chamber
between the front and baffle. Secure blocker to the front of mower with 3/8–16 x 1” bolt and a 3/8–16 flange nut, replacing existing caster mounting hardware, and to the front of the baffle with (2) 1/4–20 x 5/8” (16 mm) bolt and (2) 1/4–20 flange nuts (Fig. 2).
3
1
2
4
1
Installing the Baffle
1. Remove the (5) 5/16–18 x 5/8” (16 mm) carriage
bolt and 3/8” locknuts from the holes where the baffles will be installed (Fig. 2).
Note: Save hardware for use when using
mower to side discharge.
2. Place the baffle inside cutting chamber with
studs through the top. Secure studs to top of mower with (5) 5/16-18 flange nuts and to the back baffle with a 5/16-18 x 5/8” (16 mm) bolt and 5/16-18 flange nut (Fig. 2).
2
2
5
1. Blocker plate
2. Bolt 3/8–16 x 5/8” (16 mm)
3. Flange nut 3/8–16
m–3925
Figure 3
4. Bolt 1/4–20 x 5/8” (16 mm)
5. flange nut 1/4–20
Loading...
+ 2 hidden pages