Toro 25435, 25435E, 25436E, 25436 Installation Instructions

48inHeavy-DutyCrumber
G02351 1
1
2
60inHeavy-DutyCrumber
RT600Trencher
ModelNo.25435
ModelNo.25436
Installation
LooseParts
FormNo.3377-962RevA
InstallationInstructions
Description
Crumberbar Crumberblade Hex-headbolt(M12x110mm) Locknut(M12) Carriagebolt(1/2x4inch) Washer(1/2inch) Locknut(1/2inch)
Note:Youshouldhaveeither2peopleorliftingequipment toperformthisprocedure.
1.Parkthemachineonarm,levelsurface.
2.Movetheboomtothehorizontalposition.
3.Turnofftheengineandremovethekey.
4.Ifthespacebetweenthemountingplatesistoonarrow toinsertthecrumberbarbetweenthem,loosenthe 3boltsandthe3locknutsthatsecurethecrumber mountingbracketstotheboomenoughsothatyoucan insertthecrumberbarbetweenthem(
Figure1).
Qty.
Use
1 1 4 4 2 2 2
Installthecrumber.
1.Crumbermountingbracket (2)
Figure1
2.Locknuts
5.Looselyinstallthe4hex-headbolts(M12x110mm) andthe4locknuts(M12)fromthekitontotheplates, andinsertthecrumberbarbetweentheplatesandthe
©2013—TheToro®Company 8111LyndaleAvenueSouth Bloomington,MN55420
Registeratwww.T oro.com.
boltsasshownin
OriginalInstructions(EN)
Figure2.
PrintedintheUSA
AllRightsReserved
*3377-962*A
Note:Torquetheboltsandlocknutsto124to154
G023379
1
2
3
4
G023428
1
3
5
4
6
2
2
N-m(91to113ft-lb).
Figure2
1.Locknut—M12(4)
2.Crumberbar4.Hex-headbolt(4)
3.Mountingplates
6.Ifyouloosenedthe3boltsandthe3locknutsthat securethecrumbermountingbracketstothemachine, torquethemto217to271N-m(160to200ft-lb).
7.Installthecrumberbladeontothecrumberbarwith2 carriagebolts(1/2x4inch),aplate,2washers(1/2 inch),and2locknuts(1/2inch)asshowninFigure3.
Note:T orquetheboltsandlocknutsto91to113 N-m(67to83ft-lb).
Theboomandchainarenotshown.
Figure3
1.Locknuts(1/2inch)4.Crumberbar
2.Washer(1/2inch)5.Carriagebolts(1/2x4
3.Plate
6.Crumberblade
inch)
2
Loading...