Toro 23809E, 23809, 23830, 23830E Installation Instructions

FormNo.3384-154RevB
TallorShortRodBox
4045DirectionalDrill
ModelNo.23809
ModelNo.23809E
ModelNo.23830
ModelNo.23830E
InstallationInstructions
WARNING
CALIFORNIA
ThisproductcontainsachemicalorchemicalsknowntotheStateofCaliforniato
causecancer,birthdefects,orreproductiveharm.
RemovingthePipeBox
1.Parkthemachineonalevelsurface,placethethrust frameinthehorizontalposition,andturntheengine off.
2.Raisetheelevators.
3.Installthelower,innerpinsonthepipebox(Figure1).
Figure1
1.Upperpin3.Lower,innerpin
2.Lower,outerpin
InstallingthePipeBox
1.Parkthemachineonalevelsurface,placethethrust frameinthehorizontalposition,andturntheengine off.
2.Removetheupperpinsfromthepipebox(Figure1).
3.Verifythatthelower,innerpinsareinstalled.
4.Carefullyinstallthepipesintothepipebox.
5.Installtheupperpins(Figure1)intothepipebox,and securethemwith4klikpins.
6.Withahoistcapableoflifting2,260kg(5,000lb),align thepipeboxwiththefrontandrearlocatingpinson thethrustfame(Figure2).
4.Verifythattheupperpins(Figure1)areinstalled.
5.Removethelower,outerpins(Figure1)andremove thepipeboxwithahoistcapableoflifting2,260kg (5,000lb).
Note:Thelower,innerpinsmustbeinstalledwhen removingthepipeboxotherwisethepipewillfallout ofthebottomofthepipebox.
©2015—TheToro®Company 8111LyndaleAvenueSouth Bloomington,MN55420
Registeratwww.T oro.com.
Figure2
1.Frontandrearlocatingpins
7.Securethepipeboxtothemachinewiththe2lower, outerpinsand2klikpins(Figure1).
OriginalInstructions(EN)
PrintedintheUSA.
AllRightsReserved
*3384-154*B
Loading...