
Form No. 3323-285
Cement Mixer Bowl
For use with the Siteworks Systems Auger Drive Head
Model 22442
IMPORTANT:
safety section in your traction unit operator’s manual,
and follow all pr
Safety
1. Tipping
exceed
Befor
ecautions listed ther
Decals
1
hazard—do not
the maximum
e using this pr
#
100–4664
Figure 1
load
2. Maximum
oduct, read the
e.
2
load
Specifications:
Note:
Specifications and design are subject to change
without notice.
Overall
Overall length
Weight
width
25.15 inches (64 cm)
18.25 inches (46 cm)
75 lbs (34 Kg)
Installation
Instructions
Stability
To
determine the degree of slope you can traverse with the
cement bowl installed on a traction unit, find the stability
rating for the hill position you want to travel in the
appropriate table on the following page, then find the
degree of slope for the same rating and hill position in the
Stability Data section of the traction unit operator
manual.
IMPORTANT
operator’
on the platform while using the cement bowl, or the
traction unit will become unstable.
Ratings
’s
: If your traction unit has a r
s platform, the counterweight must be used
ear
WARNING
POTENTIAL HAZARD
•
Exceeding the maximum r
can cause the traction unit to tip.
WHA
T CAN HAPPEN
•
If the traction unit tips, you or bystanders could
be crushed.
HOW T
•
O AVOID THE HAZARD
Do not drive the traction unit on a slope steeper
than the maximum r
determined in the following tables and the
traction unit operator’s manual.
ecommended slope
ecommended slope, as
Maximum dry concrete
load
The T
8111 Lyndale Ave. South
Bloomington, MN 55420–1196
oro Company
– 1999
200 lbs (90.7 Kg)
All Rights Reserved
Printed in the USA

Installation Instructions
Stability with a Loaded Bowl
Orientation
Front Uphill
Stability Rating
B
Rear Uphill
2.
Manually rotate the auger drive head up, until you can
install two bolts into the holes on both sides of the
cradle arms, securing the drive head. Secure each bolt
with a nut (Fig. 2).
3
1
2
m–3944
D
Side Uphill
C
Stability with an Unloaded Bowl
Orientation
Front Uphill
Stability Rating
C
Rear Uphill
C
Side Uphill
Figure
1. Drive
2.
3. Start
4.
1. Drive
5. Stop
6.
head
Cradle arm
the engine.
Maneuver the drive shaft into the collar on the back of
the bowl (Fig. 3).
1
2
Figure
head
the engine.
Secure the bowl to the drive head with the bolt and nut
supplied with the auger drive head (Fig. 4).
1
2
3.
Bolts and nuts
3
2.
Cement bowl
m–4316
Installing
the Bowl onto the
Auger Drive Head
1. Raise
the loader arms so the drive head clears the
ground and stop the engine
2
B
2
Figure
1. Bolt 2. Nut
4
m–4317

Installation Instructions
Mixing
POTENTIAL
•
When full of concr
and could unbalance the traction unit.
WHA
•
The traction unit could tip, seriously injuring
you or bystanders.
HOW T
•
Never use the cement bowl on the Dingo
without first installing the Sitework Systems
Counterweight, available fr
dealer.
Always keep the bowl close to the gr
•
1.
Lower the loader arms as far as possible while tilting
the bowl upward as far as possible.
2.
Add up to 200 lbs (90.7 Kg) of dry concrete mixture.
3.
Move the throttle lever to the fast position (rabbit).
4.
If your traction unit has a speed selector and flow
divider
and the flow divider control to the 10 to 11 o’clock
position (20 to 30 RPM).
and Pouring Concrete
HAZARD
ete, the bowl is very heavy
T CAN HAPPEN
O AVOID THE HAZARD
om your T
, move the speed selector lever to fast (Rabbit),
oro
ound.
Removing
the Bowl from the
Auger Drive Head
1. Set
the bowl down in its storage location.
2.
Stop the engine.
3.
Remove the bolt and nut securing the drive head to the
bowl.
Start the engine and back the traction unit away from
4.
the bowl.
Storage
1.
Before long term storage, wash the bowl with mild
deter
gent and water to remove dirt and grime.
2.
Store the bowl in a clean, dry garage or storage area.
Cover it to protect it and keep it clean.
5.
Push the auxiliary hydraulics lever away from the
operator grip to mix the concrete and add the
appropriate amount of water
When the cement is suf
6.
auxiliary hydraulics lever to neutral and drive slowly
to the work site.
7. T
ilt the bowl forward and pull the auxiliary hydraulics
lever to the operator grip and hold it to dump the
concrete.
When finished using the bowl, wash it out before the
8.
concrete sets.
.
ficiently mixed, move the
3