Toro 110-0351 Installation Instructions

Form No. 3353–606 Rev B
DFS Bagger Adapter Kit
Part No. 110–0351
Installation Instructions
Note: Use the existing hardware that came with the bagger to install the bagger mounting bracket in Step 3.
Setup
Note: Determine the left and right sides of the machine from the normal operating position.
Loose Parts
Note: Use the chart below to verify all parts have been shipped.
Step
1
2
Description Qty. Use
Side bracket—right
Side bracket—left
Bolt, 3/8 x 1–1/2 inch
Flange Nut, 3/8 inch
Stiffener bracket
Curved washer
No parts needed Tightening all mounting bolts
Step
1
Parts needed for this step:
1 Bagger mounting bracket
1
1
8
8
2
8
2 Stiffener bracket
8 Bolts, 3/8 x 3/4 inch
8 Curved washer
If you have a liquid cooled machine, go to page 3 for Installing the Bagger Mounting Bracket onto a Liquid Cooled Machine.
If you have an air cooled machine, use the following instructions for Installing the Bagger Mounting Bracket onto an Air Cooled Machine.
Installing bagger mounting brackets onto the machine
1 Side bracket—right
1 Side bracket—left
4 Long frame spacer—only two are needed for air
cooled machines
2 Short frame spacer
12 Bolt, 3/8 x 1–1/2 inch
4 Bolt, 3/8 x 1–1/4 inch
26 Flange Nut, 3/8 inch
W 2005 by The Toro Company 8111 Lyndale Avenue South Bloomington, MN 55420-1196
Original Instructions (Language abbreviation)
Installing the Bagger Mounting Bracket onto an Air Cooled Machine
Important Do not tighten any bolts until both side
brackets and bagger mounting bracket are fit loose on the machine.
Refer to Tightening the Mounting Bolts, on page 4, for the correct procedure to tighten the bolts.
Contact us at www.Toro.com
All Rights Reserved
Printed in the USA
Installing the Bagger Mounting Bracket to the Side Brackets (Air Cooled)
Installing the Side Brackets to an Air Cooled Machine
Important When installing the bagger bracket for an
air cooled machine, use only 2 long frame spacers; 1 per each side (Fig. 1).
1. Install the side brackets to the bagger mounting bracket (Fig. 1).
2. In the top two holes, install 2 bolts (3/8 x 1–1/2 inch), 2 flange nuts (3/8 inch) one long frame spacer, and one short frame spacer (Fig. 1).
Note: Make sure the long frame spacers are installed as shown in figure 1.
3. In the bottom hole, install a bolt (3/8 x 1–1/4 inch) and a flange nut (3/8 inch) (Fig. 1).
4. Install a bracket stiffener to the side bracket and bagger mounting bracket. Use 4 bolts (3/8 x 3/4 inch) and 4 flange nuts (3/8 inch) (Fig. 1).
5. Repeat the previous steps for the opposite side (Fig. 1).
5
6
4
3
3
4
3
10
7
Important Do not tighten any bolts until both side
brackets and bagger mounting bracket are fit loose on the machine.
Important Install one side at a time.
1. Remove the bolts, nuts and washers holding the rollbar to one side of the machine. Discard the bolts, nuts and washers (Fig. 2).
2. Install the bagger side plate and the roll bar section to the side of the machine using 4 bolts (3/8 x 1–1/2 inch), 4 curved washer (3/8 inch) and 4 flange nuts (3/8 inch) (Fig. 2).
3. Repeat the previous step on the opposite side of the machine.
Note: Make sure the curved washers are installed as shown in Figure 2.
4
1
5
1
9
8
1. Bagger mounting bracket
2. Bolt, 3/8 x 1–1/4 inch
3. Flange nut, 3/8 inch
4. Bracket stiffener
5. Left side bracket
2
Figure 1
6. Bolt, 3/8 x 3/4 inch
7. Long frame spacer
8. Bolt, 3/8 x 1–1/2 inch
9. Short frame spacer
10. Right side bracket
6
m–8040
2
3
2
3
m–8044
Figure 2
1. Side bracket
2. Curved washer, 3/8 inch
3. Bolt, 3/8 x 1–1/2 inch
4. Flange nut, 3/8 inch
5. ROPS
Installing the Bagger Mounting Bracket onto an Air Cooled Machine
Important When installing the bagger onto an air
cooled machine, use the air cooled spacer (Fig. 3).
1. Install the bagger mounting bracket to the rear frame of the machine (Fig. 3).
2