6in x 2ft Rock Chain Kit
For Dingo® Compact Utility Loaders
Model No. 108–5544
Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Form No. 3353-230 Rev -
Installation Instructions
Step
1
2
3
Note: Deter mine the left and right sides of the mac hine from the nor mal operating position.
No parts required
Left, soil tooth
Thin spacer
Bolt (3/8 x 4 inches)
Locknut (3/8 inch)
Tube
Bolt (3/8 x 1-1/4 inches)
Left, rock tooth
Right, rock tooth
Thick spacer
Bolt (3/8 x 2-3/4 inches)
Bolt (3/8 x 3 inches)
Washer (3/8 x 3/4 inch)
No parts required
Description
Step
Qty.
–
Remove the spoils auger.
1
4
8
24
37
4
Install the teeth.
6
6
4
16
4
24
–
Install the spoils auger.
4. Stop the engine and remo v e the k ey .
5. R emo v e the aug er and retain the bolt and n ut.
Use
1
Removing the Spoils Auger
No Parts Required
Procedure
1. Lo w er the loader ar ms , stop the engine , and
remo v e the k ey .
2. R emo v e the bolt and n ut securing the spoils aug er
to the trenc her ( Figure 13 ).
3. Star t the engine and raise the loader ar ms slightly
(2 to 3 inc hes).
© 2005—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
Register at www.Toro.com. Original Instructions (EN)
Printed in the USA.
All Rights Reserved
Step
2
Installing the Teeth
Parts needed for this step:
1
Left, soil tooth
4
Thin spacer
8
Bolt (3/8 x 4 inches)
24
Locknut (3/8 inch)
37
Tube
4
Bolt (3/8 x 1-1/4 inches)
6
Left, rock tooth
6
Right, rock tooth
4
Thick spacer
16
Bolt (3/8 x 2-3/4 inches)
4
Bolt (3/8 x 3 inches)
24
Washer (3/8 x 3/4 inch)
3. Star t the engine , raise the trenc her slightly off the
g round using the loader ar ms , and slo wly r un the
c hain forw ard to mo v e the other 12 links to the top .
4. Stop the engine and remo v e the k ey .
5. R emo v e the remaining teeth and other hardw are
from the c hain.
6. On an empty c hain link in the front of the trenc her ,
install a left, roc k tooth on the right side of the
c hain as illustrated in Figure 1 .
Important: Ensur e that the teeth point
f orw ard, a w ay fr om the tr encher body .
Procedure
T he c hain on y our trenc her comes from the factor y
with teeth designed to dig soil. T his kit contains the
par ts y ou need to con v er t the c hain into a 6 inc h cutting
width c hain for use on hard or roc k y g round. T he
c hain has 24 links , and eac h link can ha v e dig ging teeth
fastened to it and is refer red to as a tooth position. At
eac h tooth position, the teeth are fastened in v arious
configurations with spacers and tubes to v ar y the width
of cut. T he tooth configurations are ar rang ed along the
c hain to maximize dig ging efficiency .
T here are tw o types of teeth, soil and roc k teeth.
Cupped teeth are designed to cut through and remo v e
soil . R oc k teeth cut roc k and other hard g round. T he
teeth are cupped or angled differently de pending on
the side of the c hain to whic h they are fastened (left or
right). T he teeth are fastened to the c hain links with
bolts , n uts , tubes , and spacers of v ar ying sizes .
1. Lo w er the loader ar ms .
Note: Y ou do not need to tur n the engine on to
lo w er the ar ms .
2. R emo v e the teeth and other hardw are from the 12
links on the top span of the c hain.
Figure 1
1. Chain link 4. Left, rock tooth
2. Locknut (3/8 inch) 5. Washer (3/8 x 3/4 inch)
3. Tube
6. Bolt (3/8 x 2-3/4 inches)
7. On the next c hain link (behind the first tooth y ou
installed, to w ard the body of the trenc her), install
a right, roc k tooth on the left side of the c hain as
illustrated in Figure 2 .
Important: W hen r emo ving teeth, k eep the
components of each tooth set to gether so that
y ou can assemble them later . Some of the
teeth y ou r emo v e will be r equir ed later in this
pr ocedur e.
Figure 2
1. Chain link 4. Right, rock tooth
2. Locknut (3/8 inch) 5. Washer (3/8 x 3/4 inch)
3. Tube
2
6. Bolt (3/8 x 2-3/4 inches)
8. On the next c hain link bac k, install a left, soil tooth
on the right side of the c hain as illustrated in Figure
3 .
10. On the next c hain link bac k, install a left, roc k
tooth on the left side of the c hain as illustrated in
Figure 5 .
Figure 3
1. Chain link 4. Left, soil tooth
2. Locknut (3/8 inch) 5. Bolt (3/8 x 2-1/2 inches)
3. Tube
6. Bolt (3/8 x 7/8 inch)
9. On the next c hain link bac k, install a right, soil
tooth on the left side of the c hain as illustrated in
Figure 4 .
Figure 4
1. Chain link 4. Left, soil tooth
2. Locknut (3/8 inch) 5. Bolt (3/8 x 2-1/2 inches)
3. Tube
6. Bolt (3/8 x 7/8 inch)
Figure 5
1. Chain link 4. Left, rock tooth
2. Locknut (3/8 inch) 5. Washer (3/8 x 3/4 inch)
3. Tube
6. Bolt (3/8 x 2-3/4 inches)
11. On the next c hain link bac k, install a right, roc k
tooth on the right side of the c hain as illustrated
in Figure 6 .
Figure 6
1. Chain link 4. Right, rock tooth
2. Locknut (3/8 inch) 5. Washer (3/8 x 3/4 inch)
3. Tube
6. Bolt (3/8 x 2-3/4 inches)
3