Toro 108-5539 Installation Instructions

8in x 3ft Soil Chain Kit
For Dingo® Compact Utility Loaders
Model No. 108–5539
Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Form No. 3353-224 Rev -
Installation Instructions
1
2
3
Note: Deter mine the left and right sides of the mac hine from the nor mal operating position.
No parts required
Left soil tooth Right soil tooth 8 inch spacer Bolt (3/8 x 2-1/2 inches) Locknut (3/8 inch)
No parts required
Description
Step
1
Removing the Spoils Auger
No Parts Required
Qty.
Remove the spoils auger.
1 1 3
Install the teeth.
10
5
Install the spoils auger.
Step
2
Installing the Teeth
Parts needed for this step:
Use
Procedure
1. Lo w er the loader ar ms , stop the engine , and remo v e the k ey .
2. R emo v e the bolt and n ut securing the spoils aug er to the trenc her ( Figure 17 ).
3. Star t the engine and raise the loader ar ms slightly (2 to 3 inc hes).
4. Stop the engine and remo v e the k ey .
5. R emo v e the aug er and retain the bolt and n ut.
© 2005—The Toro® Company 8111 Lyndale Avenue South Bloomington, MN 55420
Register at www.Toro.com. Original Instructions (EN)
1
Left soil tooth
1
Right soil tooth
3
8 inch spacer
10
Bolt (3/8 x 2-1/2 inches)
5
Locknut (3/8 inch)
Procedure
T he c hain on y our trenc her comes from the factor y with teeth designed to dig a 6 inc h trenc h in soil. T his kit contains the par ts y ou need to con v er t the c hain into an 8 inc h cutting width c hain. T he c hain has 32 links , and eac h link can ha v e dig ging teeth fastened to it and is refer red to as a tooth position. F or the 8 inc h soil c hain,
Printed in the USA. All Rights Reserved
the a teeth are fastened onto ev er y other link, for a total of 16 teeth. At eac h tooth position, the teeth are fastened in v arious configurations with spacers and tubes to v ar y the width of cut. T he tooth configurations are ar rang ed along the c hain to maximize dig ging efficiency .
T he teeth are cupped differently de pending on the side of the c hain to whic h they are fastened (left or right). T he teeth are fastened to the c hain links with bolts , n uts , tubes , and spacers of v ar ying sizes .
1. Lo w er the loader ar ms .
Note: Y ou do not need to tur n the engine on to lo w er the ar ms .
Important: Ensur e that the teeth point f orw ard, a w ay fr om the tr encher body .
2. R emo v e all of the teeth and other hardw are from the top span of the c hain.
Important: W hen r emo ving teeth, k eep the components of each tooth set to gether so that y ou can assemble them later . Some of the teeth y ou r emo v e will be r equir ed later in this pr ocedur e.
3. Star t the engine , raise the trenc her slightly off the g round using the loader ar ms , and slo wly r un the c hain forw ard to mo v e the other 16 links to the top .
4. Lo w er the loader ar ms , stop the engine , and remo v e the k ey .
5. R emo v e the remaining teeth and other hardw are from the c hain.
6. On an empty c hain link in the front of the trenc her , install a right soil tooth on the left side of the c hain as illustrated in Figure 1 .
Figure 1
1. Chain link
2. Right soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
4. Bolt (3/8 x 7/8 inch)
7. T w o c hain links behind the first tooth y ou installed, to w ard the body of the trenc her , install a right soil tooth on the right side of the c hain as illustrated in Figure 2 .
Figure 2
1. Chain link
2. Right soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
2
4. Bolt (3/8 x 7/8 inch)
8. T w o c hain links bac k, install a left soil tooth on the left side of the c hain as illustrated in Figure 3 .
10. T w o c hain links bac k, install right and left soil teeth on both sides of the c hain as illustrated in Figure 5 .
Figure 3
1. Chain link
2. Left soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
4. Bolt (3/8 x 7/8 inch)
9. T w o c hain links bac k, install right and left soil teeth on both sides of the c hain as illustrated in Figure 4 .
Figure 4
1. Chain link
2. Left soil tooth 6. Tube
3. Right soil tooth
4. Bolt (3/8 x 4 inches)
5. Bolt (3/8 x 1-1/4 inches)
7. Locknut (3/8 inch)
8. Spacer
Figure 5
1. Chain link
2. Left soil tooth 5. 8 inch spacer
3. Right soil tooth
4. Bolt (3/8 x 2-1/2 inches)
6. Locknut (3/8 inch)
11. T w o c hain links bac k, install a left soil tooth on the right side of the c hain as illustrated in Figure 6 .
Figure 6
1. Chain link
2. Left soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
4. Bolt (3/8 x 7/8 inch)
3
Loading...
+ 5 hidden pages