Bagging Enhancement Kit
Z400 Series Z Master Mowers
Part No. 108–4091
Installation Instructions
Loose Parts
Note: Use the chart below to identify parts for assembly.
DESCRIPTION QTY. USE
Form No. 3353–234
Right side rubber baffle
Left side rubber baffle
Metal baffle stiffener
Carriage bolt, 5/16 x 1 inch
Locknut, 5/16 inch
Preparing the Mower Deck
1. Position the mower on a flat surface.
2. Disengage the PTO, move the motion control levers to
the neutral locked position and set the parking brake.
3. Stop the engine, remove the key, and wait for all
moving parts to stop before leaving the operating
position.
4. Raise the mower to the transport position.
5. Lift the front of the machine and support the machine
using jack stands.
6. Thoroughly clean the mower deck. All debris must be
removed to ensure the baffle will fit properly against the
mower deck.
1
1
2
8
8
Installing the baffles
7. Repair all bent and damaged areas of the mower deck
and replace any missing parts.
Warning
Mechanical or hydraulic jacks may fail to support
the machine and cause a serious injury.
• Use jack stands when supporting the machine.
• Do not use hydraulic jacks.
2004 by The Toro Company
8111 Lyndale Avenue South
Bloomington, MN 55420-1196
Original Instructions (EN)
Contact us at www.Toro.com
All Rights Reserved
Printed in the USA
Installing the Baffles
Note: Install bolts as shown in Figure 1.
1. Install the left side rubber baffle and one of the baffle
stiffeners with 4 bolts (5/16 x 1 inch) and 4 locknuts
(5/16 inch) (Fig. 1).
1
3
4
5
4
2. Install the right side rubber baffle and one of the baffle
stiffeners with 4 bolts (5/16 x 1 inch) and 4 locknuts
(5/16 inch) (Fig. 1).
3. Rotate the cutting blades and make sure they do not hit
the baffles.
6
6
1. Mower deck
2. Left side rubber baffle
5
3. Right side rubber baffle
4. Baffle stiffener
2
m–7913
Figure 1
5. Carriage bolt, 5/16 x 1 inch 6. Lock Nut, 5/16 inch
2