Hose Kit
DFS Vac Collection System for 500 Series Z Master
Model No. 107-1633
Installation Instructions
Use this kit to replace the rigid tubes of your bagging system with a flexible hose.
Loose Parts
Note: Use the chart below to identify parts for assembly.
Description Qty. Use
Form No. 3350-485
Handled tube
Hose clamp
Hose
Installing the Hose Kit
1. Disengage the PTO and set the parking brake.
2. Stop the engine, remove the key, and wait for all
moving parts to stop before leaving the operating
position.
3. Remove and store the long middle tube, clamp, and
upper tube that came with your bagger (Fig. 1).
3
1
1
1
1
Installing the hose kit
Installing the hose kit
Installing the hose kit
2
3
1
4
6
5
2
M–7117
Figure 2
1. Hose
2. To bagger
3. Clamp
4. Handled tube
5. Boot
6. Latch
Figure 1
1. Long middle tube
2. Upper tube
2003 by The Toro Company
8111 Lyndale Avenue South
Bloomington, MN 55420-1196
3. Clamp
M–6910
Original Instructions (EN)
4. Fully open the clamp and slide it onto the handled tube
(Fig. 2).
5. Slide the hose over the end of the handled tube,
ensuring that it is over the ridges on the tube and
extends onto the tube far enough so that it touches the
handle (Fig. 2).
6. Tighten the clamp around the hose and handled tube
connection (Fig. 2).
7. Slide the handled tube onto the boot and latch them
together (Fig. 2).
8. Install the end of the hose into the bagger (Fig. 2).
Contact us at www.Toro.com
All Rights Reserved
Printed in the USA