Toro 106-5450 Installation Instructions

62 Discharge Chute Retrofit Kit
200 Series Z Master Mowers
Loose Parts
Description Qty. Use
Form No. 3328–100
Installation Instructions
Discharge bracket Bolt, 3/8 x 3/4 in. Bolt, 5/16 x 3/4 in. Flange nut, 5/16 in. Flange nut, 3/8 in.
Grass deflector Spacer Spring Bolt, 5/16 x 7–1/2 in. Locknut, 5/16 in.
Warning
An uncovered discharge opening could allow the lawn mower to throw objects in the operator’s or bystander’s direction and result in serious injury. Also, contact with the blade could occur.
Never operate the lawn mower unless you install a cover plate, a mulch plate, or a grass chute and catcher.
Removing the Existing Grass Deflector
1. Remove the existing grass deflector and defector
mounts (Fig. 1). Discard the grass deflector and mounts.
1 3 6 6 3
1 1 1 1 1
Installing the discharge bracket
Installing the grass deflector
1. Bolt
2. Deflector mount
3. Spring
4. Cone Locknut
4
3
2
7
1
5
Figure 1
5. Pivot Bracket
6. Carriage Bolt
7. Locknut
6
m–2549
2002 by The Toro Company 8111 Lyndale Avenue South Bloomington, MN 55420-1196
2. Thoroughly clean the mower discharge opening. All
debris must be removed to ensure discharge bracket will fit properly against the mower.
3. Repair all bent or damaged areas of mower and replace
any missing parts.
All Rights Reserved
Printed in the USA
1
Removing Part of the Grass Deflector Bracket
Note: This section is only for mowers with grass deflector bracket welded to the mower (Fig. 2).
1. Remove a 1/4 inch of the grass deflector bracket as
shown in Figure 2. This will avoid any interference with the grass deflector.
1
3
2
3
2
1
1
m–6135
Figure 3
1. Flush to mower edge
2. Mower
3. Discharge bracket
3. Install the discharge bracket to the mower with 3 bolts
(3/8 x 3/4 inch) and 3 flange nuts (3/8 inch) using the existing holes (Fig. 4).
Important Make sure the bolt heads are installed on the
inside of the cutting chamber. See Figure 4.
2
2
m–6167
Figure 2
1. Mower
2. Grass deflector bracket
3. Remove a 1/4 inch
Installing the Discharge Bracket
Note: There are 3 existing holes in the mower for installing the discharge bracket.
1. Place the discharge bracket on top of the discharge
tunnel (Fig. 3).
2. Align the discharge bracket flush with the outside of the
discharge tunnel and with the holes in the mower (Fig. 3).
Note: Make sure the discharge bracket is flush with the outside of the discharge opening.
4
5
1
5
3 1
m–6143
Figure 4
1. Bolt, 3/8 x 3/4 inch
2. Flange nut, 3/8 inch
3. Mower
4. Discharge bracket
5. Existing hole
4. Using the discharge bracket as a template, drill six holes
(11/32 inch dia.) into the sides and top of the mower (Figures 5 and 6).
2
5. Install the discharge bracket to the mower with 6 bolts
(5/16 x 3/4 inch) and 6 flange nuts (5/16 inch) using the existing holes (Figures 5 and 6).
Important Make sure the bolt heads are installed on the
inside of the cutting chamber. See figures 5 and 6.
2
2
4
2
512
3
Installing the Grass Deflector
Warning
An uncovered discharge opening could allow the lawn mower to throw objects in the operator’s or bystander’s direction and result in serious injury. Also, contact with the blade could occur.
Never operate the lawn mower unless you install a cover plate, a mulch plate, or a grass chute and catcher.
1. Place spacer and spring onto grass deflector. Place the
straight end of spring behind the deck edge (Fig. 7).
5
5
1
1. Bolt, 5/16 x 3/4 inch
2. Flange nut, 5/16 inch
3. Mower
1
1. Bolt, 5/16 x 3/4 inch
2. Flange nut, 5/16 inch
3. Mower
5
Figure 5
Figure 6
1
4. Discharge bracket
5. Hole to drill
4
2
2
2
5
4. Discharge bracket
5. Hole to drill
3
1
m–6133
m–6145
Note: Make sure the straight end of spring is installed behind deck edge before installing the bolt as shown in figure 7.
2. Install bolt (5/16 x 7–1/2 inch) and nut (5/16 inch).
Place hook end of spring around grass deflector (Fig. 7).
Important The grass deflector must be able to lower
down into position. Lift the deflector up to test that it lowers into the full down position.
8
6
4
2
3
1
5
Figure 7
1. Bolt
2. Spacer
3. Locknut
4. Spring
5. Spring installed
6. Grass Deflector
7. Place behind deck edge before installing bolt
8. Hook end of spring
7
m–5037
3
Loading...
+ 5 hidden pages