Form No. 3324-163
Flush-face Hydraulic Coupler Kit
for Dingo Traction Units and Attachments
Part No.: 100-4744, 100-4745,
100-4746, 100-4750, and 100-4751
DESCRIPTION QTY. USE
Adapter
Flush-face coupler, female
Flush-face coupler, male
Coupler cover, male (traction unit kits only)
Coupler cover, male (traction unit kits only)
1. If you are installing a kit onto a traction unit, stop the
engine, remove the key, and move the auxiliary
hydraulics lever forward, rearward, and back to
neutral.
2. Allow the traction unit or attachment to cool
completely.
POTENTIAL HAZARD
• Quick couplers, hydraulic lines/valves, and
hydraulic fluid may be hot.
WHAT CAN HAPPEN
• Contact with hot hydraulic components or
fluid may cause burns.
HOW TO AVOID THE HAZARD
• Allow the traction unit or attachment to
cool before touching hydraulic components.
2
1
1
1
1
Install on traction unit or attachment
POTENTIAL HAZARD
• Hydraulic fluid escaping under pressure
can penetrate skin and cause injury.
WHAT CAN HAPPEN
• Fluid accidentally injected into the skin
must be surgically removed within a few
hours by a doctor familiar with this form of
injury or gangrene may result.
HOW TO AVOID THE HAZARD
• Keep body and hands away from pin hole
leaks or nozzles that eject high pressure
hydraulic fluid.
• Use cardboard or paper to find hydraulic
leaks, never use your hands.
3. Position a drip pan under the hydraulic couplers you
are replacing and have several rags ready to wipe up
any spills.
Installation
Instructions
Printed in USA
The Toro Company – 1999
All Rights Reserved
Installation Instructions
4. Thread an adapter into both the new male and female,
flush-face couplers (Fig. 1).
1
2
3
Figure 1
1. Adapter
2. Female, flush-face coupler
3. Male, flush-face coupler
5. Torque the adapter/coupler assemblies to 100 ft-lb
(135.6 N⋅m).
6. Remove the old female coupler from the hose.
7. Install the female coupler assembly onto the hose as
follows (refer to Figure 2 during this procedure):
2
1
3
m–4764
Figure 2
1. Coupler assembly
2. Hose end
3. Protective cover (traction
units only)
8. Repeat steps 6 and 7 to install the male, flush-face
coupler.
9. If you are installing a kit on a traction unit, install the
protective covers onto the couplers (Fig. 2).
10.Wipe up any spills.
For Kit Number 100-4744 and 100-4750:
• Thread the assembly onto the hose end.
• Torque the assembly to 60 ft-lb (81 N⋅m).
For Kit Number 100-4746 and 100-4751:
• Thread the assembly onto the hose end.
• Torque the assembly to 67 ft-lb (90 N⋅m).
For Kit Number 100-4745:
• Clean all old pipe thread sealant from the threads
on the hose.
• Apply pipe thread sealant to the hose threads.
Do not apply sealant to the first thread.
• Thread the assembly onto the hose end until it is
finger-tight.
• Turn the assembly onto the hose end 2 to 3
complete turns.
• Allow the sealant to cure according to the
manufacturer’s instruction before using the
attachment.
2