Toptech TT-MAC-1429, TT-MAC-2020, TT-MAC-1729, TT-MAC-2129, TT-MAC-2429 Installation Manual

...
by
INSTALLATION MANUAL
A trained, experienced technician must install this product.
Carefully read these instructions. You could damage this product or cause a hazardous condition if you fail to follow these instructions.
This manual covers the following models:
• TT-MAC-1625
• TT-MAC-2020
• TT-MAC-2025
• TT-MAC-1429
• TT-MAC-1729
High performance media air cleaner. Air cleaner cabinet is fully insulated.
• TT-MAC-2129
• TT-MAC-2429
• TT-MAC-1722
• TT-MAC-2122
• TT-MAC-2522
Table of Contents: Page
Features and Specications 2
Installation 3
IMPORTANT
!
Carefully read these instructions. You could damage this product or cause a hazardous condition if you fail to follow these instructions.
Need Help?
For assistance with this product please visit http://www.toptechparts.com or call customer care at 1-866-239-4440 during normal business hours.
Installation (continued) 4
Pressure Drop Data 5
Final Check and Contact Info 6
213906-00 Rev. 3A 6/14
1
Features
FEATURES AND SPECIFICATIONS
Easy to maintain, high efciency media
designed to capture small, medium, and large airborne particles.
Applicable to forced warm air furnaces, heat pumps, electric heat, and cooling systems up to 5 tons (2000 CFM).
Designed to easily support weight of a residential air handler, furnace, and a residential evaporator coil.
Specications
Unit Dimensions:
#TT-MAC-1625: 27.75"D x 14.25"H x 6"W
(Repl. Media: #TT-FM-1625 / #TT-FM15-1625)
#TT-MAC-2020: 22.125"D x 21"H x 6"W
(Repl. Media: #TT-FM-2020 / #TT-FM15-2020)
#TT-MAC-2025: 27.125"D x 21"H x 6"W
(Repl. Media: #TT-FM-20625 / #TT-FM15-2025)
No electricity is consumed.
Quick and easy lter media replacement.
Fully insulated cabinet
Positive seal gasket material included.
Two-stage lter seal on cabinet door.
Minimal air leakage design.
Filter Media:
MERV 11 and MERV 15 options. Our pleated design has greater media capacity
than non-pleated lters.
Temperature Rating:
-40° to 140° F (-40° to +60° C).
#TT-MAC-1429: 27.75"D x 14.25"W x 6"H
(Repl. Media: #TT-FM-1425 / #TT-FM15-1425)
#TT-MAC-1729: 29"D x 17.25"W x 6"H
(Repl. Media: #TT-FM-1625 / #TT-FM15-1625)
#TT-MAC-2129: 29"D x 21.25"W x 6"H
(Repl. Media: #TT-FM-2025 / #TT-FM15-2025)
#TT-MAC-2429: 29"D x 24.25"W x 6"H
(Repl. Media: #TT-FM-2424 / #TT-FM15-2424)
#TT-MAC-1722: 22.125"D x 17"W x 6"H
(Repl. Media: #TT-FM-1620 / #TT-FM15-1620)
#TT-MAC-2122: 22.125"D x 21"W x 6"H
(Repl. Media: #TT-FM-2020 / #TT-FM15-2020)
#TT-MAC-2522: 22.125"D x 26"W x 6"H
(Repl. Media: #TT-FM-2025 / #TT-FM15-2025)
Replacement Media Dimensions:
MERV 11
#TT-FM-1620: 16"D x 20"H x 4"W #TT-FM-1625: 16"D x 25"H x 4"W #TT-FM-2020: 20"D x 20"H x 4"W #TT-FM-2025: 20"D x 25"H x 4"W #TT-FM-1425: 14"D x 25"H x 4"W #TT-FM-2424: 24"D x 24"H x 4"W
MERV 15
#TT-FM15-1620: 16"D x 20"H x 4"W #TT-FM15-1625: 16"D x 25"H x 4"W #TT-FM15-2020: 20"D x 20"H x 4"W #TT-FM15-2025: 20"D x 25"H x 4"W #TT-FM15-1425: 14"D x 25"H x 4"W #TT-FM15-2424: 24"D x 24"H x 4"W
213906-00 Rev. 3A 6/14
2
INSTALLATION
Application
The TechPure media air cleaner cabinet is designed
to capture a signicant amount of airborne particles.
The cabinets are sold with MERV 11 or MERV 15
lter media. TechPure media lter cabinets can be
installed in all forced warm air furnaces and cooling systems up to 5 tons (2000 CFM).
Mounting Positions
The TechPure media air cleaner cabinet can be mounted in any position.
Installation
1. Plan the installation:
The TechPure media air cleaner cabinet is designed to support the weight of a residential furnace and residential evaporator coil. This media air cleaner can be mounted in any position in the return air duct. Typically, the media air cleaner is mounted next to the furnace blower compartment.
The media air cleaner cabinet is designed to be installed in the return air duct. Do not mount the media air cleaner cabinet in the supply duct.
Install the media air cleaner cabinet in a manner
that spreads airow evenly across the lter media.
Gradual transitions are required if the duct is a different size than the media air cleaner cabinet. To prevent turbulence, the maximum amount of expansion on each side of the transition is 20 degrees.
TechPure MAC Tip
Choose a mounting location that is upstream of the furnace and/ or evaporator coil. This will keep the furnace and/or evaporator coil clean.
Secure angled bracket front to back with 8x1/2 self-tapping screws.
Secure flat bracket to bottom or back with 8x1/2 self-tapping screws.
TechPure Install Tip
When installing the TechPure
media air cleaner with a humidier,
choose a mounting location that will not allow the water mist to
come in contact with the lter
media.
Turning vanes are required if the duct turns sharply just before attaching to the media air cleaner cabinet. For example, turning vanes would be required if there is an abrupt 90 degree elbow in the duct
directly next to the media air lter cabinet.
Install the media air cleaner cabinet in an area that allows for at least 27" of clearance in front of the
cabinet door for easy replacement of the lter media.
213906-00 Rev. 3A 6/14
3
Installation (continued)
2. Fasten the media cabinet to the furnace
Carefully create or use opening in the furnace or air
handler to match the lter media cabinet opening.
Place enclosed gasket material on the side of the air cleaner that joins up with furnace or air handler. You can attach the media cleaner cabinet directly to the
furnace or air handler, or t a starting collar in the
furnace opening. Drill holes and secure the cabinet to the furnace with sheet metal screws. (Rivets or slip joints are also suitable.)
3. Fasten media cabinet to the return duct
Secure the cabinet in place by using locking pliers. Drill holes and secure the cabinet to the furnace with sheet metal screws. (Rivets or slip joints are also suitable.)
INSTALLATION
Secure flat bracket front to back with 8x1/2 self­tapping screws.
4. Seal joints to prevent leaks Ensure all joints are sealed.
Energy Star Home Certication
If installing the media air cleaner into an application that is going to have the ducts leakage tested for compliance with 2011 Energy Star Home
Certication, Energy Efcient Mortgage (EEM),
or Energy Improvement Mortgage (EMI) rating requirements, then cut the provided roll of gasket
material to length and apply to the inner door anges
that meet up with the front access panel of the media air cleaner to reduce the air leakage between the door and the air cleaner.
More information about the Energy Star Home
Certication, EEM, and EMI requirements can be
found at http://www.texenergyaudit.org/facts.htm
Apply gasket material to inner door flanges that meet up with the front access panel of the media air cleaner.
Secure flat bracket front to back with 8x1/2 self­tapping screws.
Installing the Filter media
The arrow on the lter media must point in the direction of the air ow. If the media cabinet is
installed in the return air side of the duct work, the arrow will typically point toward the blower compartment.
213906-00 Rev. 3A 6/14
4
Pressure Drop
PRESSURE DROP DATA
Flow Rate
(CFM
0 0 0.00 0.000 0% 0.00 0.181
427 123 0.70 0.028 25% 21.50 0.221
854 246 1.65 0.065 50% 73.30 0.386
1281 369 2.80 0.110 75% 106.30 0.591
1708 492 4.60 0.181 100% 132.70 0.795
2135 615 6.95 0.274 125% 152.70 1.000
DP ("H2O) 0.181in. 0.221in. 0.386in. 0.591in. 0.795in. 1.000in. *CME
Size Range
(mm)
0.3-0.4 15.7 15.1 21.2 26.3 34.2 38.5 15.1
0.4-0.55 19.9 19.5 25.9 36.3 42.9 51.2 19.5
0.55-0.7 28.0 30.6 39.8 52.3 57.6 65.8 28.6
0.7-1.0 42.0 45.3 52.6 65.9 71.2 79.3 43.0
1.0-1.3 53.4 57.8 63.7 74.8 81.4 86.6 53.4
1.3-1.6 61.5 65.9 72.0 81.5 85.9 91.3 61.5
1.6-2.2 69.1 74.8 80.3 86.9 90.9 95.0 69.1
2.2-3.0 77.0 82.9 88.2 93.2 95.0 97.2 77.0
3.0-4.0 81.7 88.0 92.2 95.7 96.8 98.2 81.7
4.0-5.5 85.1 90.8 95.1 97.0 97.8 99.0 85.1
5.5-7.0 86.5 92.6 96.5 98.0 98.3 99.5 86.5
7.0-10.0 87.2 93.5 97.2 98.6 99.0 99.8 87.2
Velocity
(FPM)
dP
(mm H2O)
Pressure Drop
(“H2O)
Fractional Efciency (%)
% of Rated
Airow
Dust Fed Pressure Drop
*Test data performed on a 20x25x4 MERV 11 lter / 1708 CFM / 492 FPM, by LMS technologies
213906-00 Rev. 3A 6/14
5
FINAL CHECKS AND CONTACT INFO
Replacement Schedule
It is very important for optimal heating and cooling system efciency to replace the lter media
as recommended by your heating and cooling technician. The climate in which you live and the particulate count in your indoor environment will be considered when your heating and cooling technician personalizes a replacement schedule for your particular application. In many
climates, it is best to replace the lter at least before the heating season and before the cooling season. The lter should always be replaced at least once a year in all circumstances.
Final Checks
Check installation:
1. TechPure air cleaner cabinet is installed securely on the return side of the system.
2. The arrow on the lter media points in the direction of the air ow.
3. If used, turning vanes and transitions are installed properly.
4. All joints in ductwork and between TechPure air cleaner and furnace/air handler are properly sealed to prevent leaks.
5. Blower compartment is cleaned and the original lter has been removed.
6. Use enclosed cleaning cloth to wipe down access door.
Contact Info
TopTech
2000 Parks Oaks Ave
Orlando, FL 32808
Phone: 866-239-4440
Web: http://www.TopTechParts.com
Hours of operation: Mon-Fri (8am-5pm EST)
Disclaimer:
*This product is manufactured by a third party for Carrier Enterprises, LLC. under the TechPure brand.
213906-00 Rev. 3A 6/14
6
Loading...