![](/html/45/4547/4547925a7f18fc5dd77fab9af5e2f254badf0b053eb21672eec4cbf3edc1e4f5/bg1.png)
Topsoaring New Technology Co.,LTD. Super TopSky 2.0 installation Manual
1
Super TopSky 2.0 DLG
Installation Manual
Super
Super Super
Super Top
TopTop
TopSky 2.0
Sky 2.0Sky 2.0
Sky 2.0
Topsoaring New Technology Co.,LTD
www.topsoaring.com
![](/html/45/4547/4547925a7f18fc5dd77fab9af5e2f254badf0b053eb21672eec4cbf3edc1e4f5/bg2.png)
Topsoaring New Technology Co.,LTD. Super TopSky 2.0 installation Manual
2
1. Locate servo position, we
don't recommend installing the
servos under the carbon front,
that'll result in weakling the wing,
you can find a carbon thread tow
was embedded as spar
2. Place servo for marking, here
you can see we use D60 for
ailerons
3. Draw the outline of the servo
4. Remove the cover of servo
![](/html/45/4547/4547925a7f18fc5dd77fab9af5e2f254badf0b053eb21672eec4cbf3edc1e4f5/bg3.png)
Topsoaring New Technology Co.,LTD. Super TopSky 2.0 installation Manual
3
5. Remove foam to accept
servos
6. Drill slot for servo wire
7. use 4mm brass tube as a
drilling tool, file the top as the
picture shown
8. Trim the servos and cover it
using masking tape, remove the
connectors
![](/html/45/4547/4547925a7f18fc5dd77fab9af5e2f254badf0b053eb21672eec4cbf3edc1e4f5/bg4.png)
Topsoaring New Technology Co.,LTD. Super TopSky 2.0 installation Manual
4
9. Servos dry fit and mark the
exit of the wire
10. Mark the place of the screws
connecting the wing and
fuselage, and mark the foam in
30mm wide.
11. Remove the form with mark
to form a space for epoxy and
micro balloon
12. Mix 30min epoxy with micro
balloon and fill all the space with
sufficient blending, use a knife to
drill the root foam.
![](/html/45/4547/4547925a7f18fc5dd77fab9af5e2f254badf0b053eb21672eec4cbf3edc1e4f5/bg5.png)
Topsoaring New Technology Co.,LTD. Super TopSky 2.0 installation Manual
5
13. Apply 30min epoxy on the
root of the wing, use a pice of
tape on the bottom side to
connect 2 panels together
14. Connect 2 panels and place
the wing tips on 2 chairs, the
weight help 2 panels join
together
15. Carefully make 2 panels in
correct position, we recommend
using 6.5 degree dihedral, it's
about 168mm high measure
from one tip while laying other
panel on the desk.
16. Sweep away all extra epoxy
![](/html/45/4547/4547925a7f18fc5dd77fab9af5e2f254badf0b053eb21672eec4cbf3edc1e4f5/bg6.png)
Topsoaring New Technology Co.,LTD. Super TopSky 2.0 installation Manual
6
17. Lay enough time for curing
18. Drill hole for wire going
through
19. Lightly sand the joining area
20. Cut out a 35mm wide FG
tape, lightly spray with 3M77 and
stick to the sanded area