T-3 INSTRUCTIONS
Prior to installation check parts list!
Standard T-3 Includes: Cover, Terminal Board, (5) Binding Post sets, Locking Nut,
Anti-Spin Gasket, Connection Chart label and instructions
Step 1. Most connecting hardware comes installed. To add extra binding posts, the
set screw side is designed to be on the side of the cutout in the terminal
bottom. Install connecting hardware, binding post or other accessories into
the holes in the T-3 test station terminal.
Step 2. Install Tinker & Rasor’s exclusive “anti-spin” gasket. Remove protective
paper from one side of gasket and place sticky side inside the terminal and
press firmly. Remove the remaining protective paper cover from the gasket.
Step 3. Place large black nut over 3-1/2” OD test station riser.
Step 4. Thread the cables through bottom of the T-3 terminal. Cables may be
inserted on the set screw side of the binding post, or on the “Nut” side of the
terminal, per your preference.
Step 5. Position the T-3 terminal to the desired alignment over the riser and press
down firmly. The “anti-spin” gasket will seal the terminal to the riser.
Tighten terminal to riser pipe with the large black nut while holding the
terminal.
Step 6. Attach cables as required.
For Questions or comments contact:
Tinker & Rasor
(833) 332-1010
Info@tinker-rasor.com
www.teststations.com
T-3 INSTRUCTIONS
Prior to installation check parts list!
Standard T-3 Includes: Cover, Terminal Board, (5) Binding Post sets, Locking Nut,
Anti-Spin Gasket, Connection Chart label and instructions
Step 1. Most connecting hardware comes installed. To add extra binding posts, the
set screw side is designed to be on the side of the cutout in the terminal
bottom. Install connecting hardware, binding post or other accessories into
the holes in the T-3 test station terminal.
Step 2. Install Tinker & Rasor’s exclusive “anti-spin” gasket. Remove protective
paper from one side of gasket and place sticky side inside the terminal and
press firmly. Remove the remaining protective paper cover from the gasket.
Step 3. Place large black nut over 3-1/2” OD test station riser.
Step 4. Thread the cables through bottom of the T-3 terminal. Cables may be
inserted on the set screw side of the binding post, or on the “Nut” side of the
terminal, per your preference.
Step 5. Position the T-3 terminal to the desired alignment over the riser and press
down firmly. The “anti-spin” gasket will seal the terminal to the riser.
Tighten terminal to riser pipe with the large black nut while holding the
terminal.
Step 6. Attach cables as required.
For Questions or comments contact:
Tinker & Rasor
(833) 332-1010
Info@tinker-rasor.com
www.teststations.com
QMF-570 107-269