Tillso Rake & Roll Operating & Maintenance Instructions

Tillso Rake & Roll
Operating & Maintenance Instructions Safety Manual & Parts Identification
Tillso Limited hereby declares that the Tillso .......................................................................................
as defined by the Serial Number attached to the Product, S/No: ..........................................................
conforms with the following Directives and Regulations, and has been certified accordingly.
EC Machinery Directive 2006/42/EC.
The Supply of Machinery (Safety) Regulations 2008.
The Provision and Use of Work Equipment Regulations 1998.
Specifically related harmonised standards are: BS EN ISO 12100-1: 2003 (Safety of Machinery). BS EN ISO 12100-2: 2003 (Safety of Machinery). BS EN ISO 4254-1: 2009 (Agricultural machinery - Safety - General Requirements).
THE MANUFACTURER
Tillso Limited. Falls Farm, French Drove, THORNEY. PE6 0PQ. England.
Telephone (+44) (0)1733 270135.
CERTIFIED ON BEHALF OF TILLSO LIMITED.
..............................................................
Director.
2 Operators Manual
WARRANTY
TERMS AND CONDITIONS
In this warranty Tillso Ltd., is referred to as "the Company".
1. Subject to the provisions of this warranty the Company warrants each new machine sold by it to be sold free from any defect in material or workmanship for a period of 12 months from date of installation with the end-user.
2. Some specific items have additional warranty over and above the standard 12 months. Details of these can be obtained upon request directly from the distributor or Tillso Ltd.
3. If the machine or part thereof supplied by the Company is not in accordance with the warranty given in clause 1 the Company will at its option:
(a) make good the machine or part thereof at the Company's expense, or (b) make an allowance to the purchaser against the purchase price of the machine or part thereof, or (c) accept the return of the machine and at the buyers option either: (i) repay or allow the buyer the invoice price of the machine or part thereof, or (ii) replace the machine or part thereof as is reasonably practical.
4. This warranty shall not oblige the Company to make any payment in respect of loss of profit or other consequential loss or contingent liability of the Purchaser alleged to arise from any defect in the machine or impose any liability on the Company other than that contained in clause 3.
5. Any claim under this warranty must be notified to the Company in writing specifying the matters complained of within 14 days from the date of repair.
6. Any claim under this warranty must be made by the original purchaser of the machine and is not assignable to any third party.
7. If the purchaser hires out the machine to any third party the warranty shall apply only to matters notified to the Company in writing within 90 days of the date of delivery and clause 1 shall be read as if the period of 90 days were substituted for the period of 12 months.
8. The warranty will cease to apply if: (a) any parts not made, supplied or approved in writing by the Company are fitted to the machine or (b) any repair is carried out to the machine other than by or with the express written approval of the Company or (c) any alterations not expressly authorized by the Company in writing are made to the machine or (d) the machine is damaged by accident or (e) the machine is abused or overloaded or used for a purpose or load beyond its design capabilities, or used in conjunction with a tractor whose power output capability exceeds the stated implement power requirement by more than 40%. For the purpose of these terms and conditions, "stated implement power requirement" refers to wheeled tractors unless specifically stated. These power requirements should be reduced by 20% when used in conjunction with tracked tractors. (f) the machine is operated as part of a 'cultivation train' where more than one implement is being towed, without the express written approval of Tillso Ltd. (g) any maintenance is not carried out in accordance with the service schedules in the operator's manual. (h) the Installation and Warranty Registration Certificate is not received by Tillso Ltd., Service Dept., Falls Farm, French Drove, Thorney, Peterborough PE6 0PQ, within 7 days of installing a new machine.
3 Operators Manual
Contents
Machine Identification .................................................................................................................... 2
Introduction .................................................................................................................................... 5
Foreword ........................................................................................................................................ 5
Warranty Guidelines........................................................................................................................ 5
1. Safety Data .............................................................................................................................. 6
1.1 Safety Symbols........................................................................................................................ 6
1.2 Use for the Intended Purpose ................................................................................................. 8
1.3 Operational Safety .................................................................................................................. 8
1.3.1 No liability for Consequential Damage ................................................................................ 8
1.4 Road Traffic Safety ................................................................................................................. 9
1.5 Accident Prevention ................................................................................................................ 9
1.5.1 Hitching-up the Machine...................................................................................................... 9
1.5.2 Changing Equipment .......................................................................................................... 9
1.5.3 During Operation ................................................................................................................. 9
1.5.4 Machine Owners responsibilities............................................................................................ 9
1.6 Servicing and Maintenance .................................................................................................. .10
1.7 Operating Areas ................................................................................................................... .10
1.8 Authorised Operators............................................................................................................. 10
1.9 Protective Equipment............................................................................................................. 10
2. Transportation & installation..................................................................................................... 11
2.1 Delivery................................................................................................................................... 11
2.2 Transportation......................................................................................................................... 11
2.3 Installation............................................................................................................................... 11
3. Technical Data............................................................................................................................11
4. Adjustment & Operation............................................................................................................ 12
4.1 Preparing for Operation.......................................................................................................... 12
4.2 Preparing for Work.................................................................................................................. 12
4.3 Field Setting..............................................................................................................................13
4.4 Work to Transport................................................................................................................... 14
4.5 Parking.................................................................................................................................... 15
4.6 Aqueel Roller........................................................................................................................... 15
4.7 Work Settings.......................................................................................................................... 16
4.8 Work Instructions......................................................................................................................18
4.9 Parking Long Term...................................................................................................................18
4.10 Checks....................................................................................................................................19
5. Servicing & Maintenance....................................................................................................... .. 19
5.1 Servicing.............................................................................................................................. .. 19
5.2 Cleaning............................................................................................................................... .. 19
5.3 DDLight Roll......................................................................................................................... .. 19
5.4 Aqueel Roll.......................................................................................................................... ... 19
5.5 Frame Pitch Circuit - Purging.................................................................................................. 20
5.6 Operator Support.................................................................................................................... 20
5.7 Maintenance Intervals............................................................................................................ 20
5.8 Maintenance Overview........................................................................................................... 21
5.9 Lubricating the Machine......................................................................................................... 21
5.10 Handling of Lubricants.......................................................................................................... 21
5.11 Waste Oil Disposal ............................................................................................................ 22
5.12 Lubricants and Hydraulic Oil..................................................................................................22
6. PARTS LIST............................................................................................................................. 23
4 Operators Manual
Introduction Foreword
Make sure you have read and follow the Operating Instructions carefully before using the machine or component. By doing so, you will avoid accidents, reduce repair costs and downtime and increase its reliability and service life. Pay particular attention to the safety instructions!
TILLSO will not accept any responsibility for any damage or malfunctions resulting from failure to comply with the Operating Instructions.
These Operating Instructions will assist you in getting to know your machine and in using it correctly for its intended purposes. First, you are given general instructions in handling the machine. This is followed by sections on servicing, maintenance and the action to be taken should a malfunction occur.
These operating instructions are to be read and followed by all persons working on or with the machine, e.g.:
• Operation (including preparation, remedying of faults in the operating sequence and servicing).
• Maintenance (maintenance and inspection)
• Transportation. Together with these Operating Instructions,
you will receive a Spare Parts List and a Registration Form. Field service technicians will instruct you in the operation and servicing of your machine. Following this, the Machine Registration form is to be returned to TILLSO. This confirms your formal acceptance of the machine. The warranty period begins on the date of delivery or installation, whichever is the latter.
these Operating Instructions for the purpose of improving the Product.
Warranty Guidelines
1. The period of liability for material defects (warranty) relating to our products is 12
We reserve the right to alter illustrations as well as technical data and weights contained in
months. In the case of written deviations from the statutory provisions, these agreements shall apply.
They shall become effective upon installation of the machine with the end customer. All wear parts are excluded from the warranty.
2. Warranty claims must be submitted to the TILLSO Customer Service Department in Thorney via your dealer. It is only possible to process claims which have been correctly completed and submitted no later than 14 days after the date of repair.
3. In the case of deliveries made under the warranty which are subject to the return of the old parts, the old parts must be returned to TILLSO within 28 days after the damage occurred.
4. In the case of deliveries made under the warranty which are not subject to the return of the old parts, these parts must be kept for the purpose of further decisions for a period of 3 months after receipt of the warranty claim.
5. Warranty repairs to be carried out by outside companies, or repairs which are expected to take more than 10 working hours, must be agreed upon in advance with the Customer Service Department.
5 Operators Manual
1. Safety Data The following warnings and safety instructions apply to all sections of these Operating Instructions.
1.1 Safety Symbols On the machine:
Read and observe the Operating Instructions before starting up the machine!
Watch out for escaping pressurised fluids! Follow the instructions in the Operating Instructions!
Never reach into areas where there is a danger of being crushed by moving parts!
Parts may fly off during operation. Keep a safe distance away from the machine!
Keep clear of the working range of foldable machine components!
No passengers are allowed on the machine!
Never reach into any revolving or moving parts!
6 Operators Manual
Refer to Operating Instructions before attempting maintenance!
Operating Instructions: The Operating Instructions distinguish
between three different types of warning and safety instructions. The following graphic symbols are used:
It is important that all the safety instructions contained in these Operating Instructions and all the warning signs on the machine are read carefully.
Ensure that the warning signs are legible. Replace any signs that are missing or damaged.
These instructions must be followed in order to prevent accidents. Inform other users of
Important!
Risk of injury!
Risk of fatal or serious injury!
the warnings and safety instructions. Do not carry out any operations which may
affect safe use of the machine or component.
7 Operators Manual
Loading...
+ 15 hidden pages