Vertical Kayak Rack
MAKE YOUR DOCK A DESTINATION
GalvX #86904 / Galvanized #86922
Warnings
Caution should be used when operating electrical tools near
water. Failure to use caution can result in injury or death.
2
3
3
2
Tools Required:
#2 Phillips Head Screw Driver
7/16” Wrench or Socket
1
GalvX Dual Coat Finish - #86904 Parts List
# Part # Qty Description
1 86904-1A 2 Accessory Support Tube
2 86904-2 4 Kayak Bracket
3 48668-C1 8 Bracket Pad
4 10964 8 1/4" x 2.75" Pan Head Machine Screw, Zinc
5 10929 8 1/4" x 0.5" Pan Head Machine Screw, Zinc
6 10656 8 1/4" Nyloc Nut
7 10029 8 1/4" Acorn Nut, Black Nylon
8 17511 2 2" Sq. Tube Plug
9 18256 4 2" x 3' Cam Strap
Instruction Sheet #08184
Hot Dipped Galvanized Finish - #86922 Parts List
# Part # Qty Description
1 86922-1A 2 Accessory Support Tube
2 86922-2 4 Kayak Bracket
3 48668-C1 8 Bracket Pad
4 10964 8 1/4" x 2.75" Pan Head Machine Screw, Zinc
5 10929 8 1/4" x 0.5" Pan Head Machine Screw, Zinc
6 10656 8 1/4" Nyloc Nut
7 10029 8 1/4" Acorn Nut, Black Nylon
8 17511 2 2" Sq. Tube Plug
9 18256 4 2" x 3' Cam Strap
TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336
www.tiedown.com (404) 344-0000 Fax (404) 349-0401
020113,A1300
Vertical Kayak Rack
GalvX #86904 / Galvanized #86922
2
8
4
Assembly Instructions:
1. Using 2 - 1/4"x 0.5" pan head screws (5) and
2 - 1/4" acorn nuts (7) attach bracket pads (3) to
bottom of Kayak brackets (2). Repeat for remaining
kayak brackets.
2. Slide 2 - 1/4"x 2.75" pan head screws (4) through
bracket pads (3) and then through back of Kayak
brackets (1), then secure brackets to support tube
stand using 2 - 1/4" nyloc nuts (6). Repeat for
remaining kayak brackets.
3
4
5
3
4
7
2
3
4
5
6
6
Eye bolts secure the receiver
to the kayak rack base.
Once the holes are aliened
hand tighten all eye bolts.
3
1
7
1
Installation Instructions:
1. Slide base of accessory tube into receiver until
threaded holes align with holes in receiver.
2. Slide eye bolts through receiver side holes and screw
into threaded holes in accessory base. Hand tighten all
eye bolts and then use screw driver shaft to tighten
one half turn.
3 Secure kayaks to rack using 4 - 3' cam straps (9).
TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336
www.tiedown.com (404) 344-0000 Fax (404) 349-0401
020113,A1300