Eye Anchor Kit Instructions
Do-it-Yourself protection for most outdoor structures or possessions.
Includes: 15" Anchors,
Wire Clamps
& 50 ft Cable
Part #59070
1. Install ground anchors as close to the building as possible at all four corners.
A. Install anchors using a straight rod to turn (screw) anchor into the ground.
B. A starter hole, up to 1/3 of the anchor length can be used to start anchor into the ground. Once the anchor
eye is level with the ground, backfill the soil and pack area around the anchor eye.
C. Anchor eye should be just above soil level.
2. Cable can be secured to the building using the following methods.
A. Attach one end of the cable to an anchor using the wire rope clips. Cable goes thru the anchor eye and is
clamped together using the wire clip. Place the cable over the roof to the opposite anchor, loop cable thru
anchor eye. Cut cable to have enough to attach to the anchor. Pull cable tight, attach wire rope clips (2),
tighten nuts. Repeat for other side.
B. Attach cable to the side wall studs. Additional hardware required, bolts, washers nuts and wire rope clips.
All available at your local hardware supply.
NOTE:
These instructions are for suggested attachment to small shed not located in high wind areas. For more
detailed anchor requirements, see the wind zone charts for your area. You may need additional anchors,
cable, wire clamps or other forms of anchor attachments to the shed to meet local or state requirements.
Twelve (12) Month Limited Warranty
All tie down anchors, when installed in accordance with the manufacturers recommendations
and when used within the suggested capacities are guaranteed for 12 months from date of
purchase against defects in material or workmanship.
If returned prepaid to the factory. TIE DOWN ENGINEERING will replace without charge the
defective part. Labor delays or damage are not covered by this warranty and while this warranty
gives you specific legal rights, you may also have other rights with vary from state to state.
Instruction #08090
TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336
www.tiedown.com (404) 344-0000 Fax (404) 349-0401
092713,f893
Calculation Chart Instructions
Example:
Wind Zone II chart shows 12’ x 18’ building:
1. Looking in 12’ column - Use lowest value in the 12’ column for the
number of anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Looking in 18’ column - find the corresponding width of 12’ to
obtain the number of anchors for the 18’ side . . . . . . . . . . . . . . . . . . 5
(if building width exceeds the widths shown in the Building Width
column, use the lowest number of anchors in the corresponding
Building Width column)
*NOTE: Anchors at the corners shall be counted only once in
the quantity required for each side or face of building.
3. Total Anchors needed per 12’ x 18’ shed in Wind Zone II. . . . . . . . . . . . .12