Installation Instructions.
The two--, three--, and four--point well junctions are designed for universal mounting on both flat and curved surfaces. The
mounting angle of the junction is adjustable from 0_ thru 90_ above or below the horizontal in 15_ increments.
These junctions provide universal interconnected bushing wells for Elastimold bushings thru 25kV class (15.2kV phase--to-ground).
DANGER
All apparatus must be de--energized during installation
or removal of part(s).
All apparatus must be installed and operated in
accordance with individual user, local, and national
work rules. These instructions do not attempt to
provide for every possible contingency.
Do not touch or move energized products.
This product should be installed only by competent
personnel trained in good safety practices involving
high voltage electrical equipment. These instructions
are not intended asa substitute foradequate training or
experience in such safety practices.
Failure to follow these instructions will result in
damage to the product and serious or fatal injury.
Excess distortion of the assembled product may result
in its failure.
Inspect parts for damage, rating and compatibility with
mating parts.
FOR MORE INFORMATION ON PARTS, INSTALLATION RATINGS AND COMPATIBILITY, CALL THE NEAREST ELASTIMOLD OFFICE.
If this product is supplied with a protective shipping
cover(s), remove this shipping cover(s) and replace
with the appropriate HV insulated cap(s) or
connector(s) before submerging or energizing the
circuit.
IMPORTANT
1. Check contents of package to ensure they are complete
and undamaged.
2. Check all components to ensure proper fit with cable
and/or mating products.
3. Read entire installation instructions before starting.
4. Have all required tools at hand and maintain cleanliness
throughout the procedure.
IS---0491
IS---K1601WJ2,J3,J4
March 2010
Printed in the U.S.A.
8155 T&B Boulevard, Memphis, Tennessee 38125
(800) 888-- 0211 Fax: (800) 888-- 0690

IS---0491
March 2010
Page 2 of 3
STEP 1
Loosely attach universal mounting brackets to the junction base bracket and place assembly against thewall. Adjust brackets
for proper alignment and mark their location on the wall.
Round Surface Flat Surface
STEP 2
Detach universal mounting brackets from junction base
bracket. Mount brackets on wall according to marks made in
Step 1.
IMPORTANT: One or both of the mounting brackets can
be inverted to change the distance required between bolt
centers. The mounting bracket slot length provides the
following dimensional ranges between bolt centers.
Universal Mounting
Bracket
Part No.
J2
J3
J4
13 !/2 to 16 &/8
34,3cm to 42,9cm
17 !/2 to 20 &/8
45,5cm to 53,0cm
21 !/2 to 24 &/8
54,6cm to 63,2cm
Base
Bracket
Mounting Dimensions (Inches)Junction
A B C
9 !/2 to13 !/8
24,1cm to 33.3cm
13 !/2 to 17 !/8
34,3cm to 43.5cm
17 !/2 to 21 !/8
44,5cm to 53.7cm
5 !/4 to 9 !/4
13,3cm to 23,5cm
9 !/4 to 13 !/4
23,5cm to 33,7cm
13 !/4 to 17 !/4
33,7cm to 43,8cm
A
B
C
Bolt Slots (Bolts supplied
by user to fit 17/32”
(13mm) Diameter Holes.)

IS---0491
March 2010
Page 3 of 3
STEP 3A
With universal mounting brackets secure, fasten base bracket (with junction attached) to mounting brackets, making sure
parking stands are in upright position.
Up
Vault Wall
4 5/8”
(11.8cm)
Grounding Lug
STEP 3B
Adjust mounting angle to desired position.
Base Bracket
Mounting Angle
Horizontal
Universal Mounting
Bracket
STEP 4
1. Remove the protective caps from the bushing wells.
2. Inspect the bushing wells to ensure they are dry and
free from all contaminants. Lubricate the well interface
area with supplied lubricant or Elastimold approved
lubricants. DO NOT SUBSTITUTE. Other lubricants
may be harmful to the product and its mating products.
3. Install the bushings into the wells following the
installation instruction included with the bushings.
Clearance Required for use with
271FT/274FT (Each Side)
STEP 3C
Tighten all bolts securely to assure no movement during
operation.
STEP 3D
Ground base bracket. A grounding lug is provided for this
purpose. It accommodates wire sizes of No. 10 Solid to No.
1 Stranded.
Lubricate
Bushing
(Not Included)
OPERATING INSTRUCTIONS
Remove protective shipping caps and clean the operating interfaces. Apply silicone lubricant (DO NOT SUBSTITUTE) before
assembly with an ELASTIMOLD product. Refer to operating instructions included with the product you are using.
WARNING: IF ALL OPERATING INTERFACES ARE NOT UTILIZED, AN ELASTIMOLD INSULATED CAP OR
INSULATED PLUG MUST BE INSTALLED ON THE UNUSED INTERFACE OR INTERFACES BEFORE ENERGIZATION.
DO NOT USE the protective shipping covers for this function as they are not insulated and are only intended to keep the
operating interface surfaces clean during handling and installation.
8155 T&B Boulevard, Memphis, Tennessee 38125
(800) 888-- 0211 Fax: (800) 888-- 0690