Thomas & Betts FSK-4 Installation Manual

Page 1
Danger of Electric Shock! Installation of this product must be performed
by trained installers in accordance with all applicable local, state and
national electrical codes, installation standards and safety rules.
INSTALLATION INSTRUCTIONS
for "Flood Seal"® Submersible Splice Cover FSS 20 & FSS 20L
WARNING
• For use on all insulated low voltage cable from 2/0 stranded to # 14
stranded conductor.
• One sleeve spans the entire range of cable sizes.
Indenitely maintains its watertight integrity and full insulating value in
all direct buried, underground network, and overhead splice joints.
• Taping is eliminated. Labor and material costs of splice preparation
are signicantly reduced.
# 14 to #8 cut here (SL)
14 8
8 4
4 1/0
#8 to #4 cut here *(.24-.38)
#4 to 1/0 cut here *(.38-.54)
*Decimal Range
CAP
Select the correct cut-off ring for cable being used.
14 8
8 4
4 1/0
Limited Warranty Applies. Refer to: www.tnb.com/ecpwarranty for full warranty terms.
© 2012 Thomas & Betts. All Rights Reserved.
1
Cut off rocket sleeve and cap at tip of arrow, leaving correct cable
size showing on opened
rocket and cap.
2
Bevel or pencil insulation 1/4” for ease of installation.
3
Apply silicon grease. Slide cut rocket and cap over prepared cable.
Thomas & Betts Corporation
Memphis, Tennessee
www.tnb.com
4
8
Install connector.
4
1
4
8
4
0
/
1
5
Apply silicone to open edge of rocket. Slide
1/4”
two halves together centering Flood Seal Housing over the connection.
®
0015099 A
148_R2
INSTALLATION INSTRUCTIONS
for "Flood Seal"® Submersible Splice Cover FSS 20 & FSS 20L
• For use on all insulated low voltage cable from 2/0 stranded to # 14
stranded conductor.
• One sleeve spans the entire range of cable sizes.
Indenitely maintains its watertight integrity and full insulating value in
all direct buried, underground network, and overhead splice joints.
• Taping is eliminated. Labor and material costs of splice preparation
are signicantly reduced.
# 14 to #8 cut here (SL)
14 8
8 4
4 1/0
#8 to #4 cut here *(.24-.38)
#4 to 1/0 cut here *(.38-.54)
*Decimal Range
CAP
Select the correct cut-off ring for cable being used.
14 8
8 4
4 1/0
Danger of Electric Shock! Installation of this product must be performed
1
Cut off rocket sleeve and cap at tip of arrow, leaving correct cable
size showing on opened
rocket and cap.
2
Bevel or pencil insulation 1/4” for ease of installation.
3
Apply silicon grease. Slide cut rocket and cap over prepared cable.
WARNING
by trained installers in accordance with all applicable local, state and
national electrical codes, installation standards and safety rules.
4
8
Install connector.
4
1
4
8
4
0
/
1
5
Apply silicone to open edge of rocket. Slide
1/4”
two halves together centering Flood Seal Housing over the connection.
®
Limited Warranty Applies. Refer to: www.tnb.com/ecpwarranty for full warranty terms.
© 2012 Thomas & Betts. All Rights Reserved.
Thomas & Betts Corporation
Memphis, Tennessee
www.tnb.com
0015099 A
148_R2
Loading...