CONTENTS:Bushing Tap Housing, Compression Lug, Socket Contact, Wrenches, Lubricant (Do Not Substitute),
Well Contact, Installation Tool, Installation/Operating Instructions.
The 167LRT is designed to terminate UD cable having concentric neutral and semi--con shielding. The bushing provides an
operating interface for connecting of an Elastimold 15kV class (8.3kV phase--to--ground and 14.4kV phase--to--phase)
200ampereloadbreak elbow or accessory device. When other types of UD cable are to be terminated an appropriate Elastimold
cable shield or grounding device must be used.
DANGER
All apparatus must be de--energized during installation
or removal of part(s) except for test point caps and
indicators that can be installed and operated energized.
After installation loadbreak products can be operated
energized per operating instructions. All deadbreak
connectors must be de--energized before operating.
All apparatus must be installed and operated in
accordance with individual user, local, and national
work rules. These instructions do not attempt to provide
for every possible contingency.
Do not touch or move energized products.
“Loadbreak connectors must be operated with a full
insulated “hotstick” type live--line tool.” Consult the
company’s safe work practices for the required
live--line tool length.
FOR MORE INFORMATION ON PARTS, INSTALLATION RATINGS AND COMPATIBILITY, CALL THE NEAREST ELASTIMOLD OFFICE.
Excess distortion of the assembled product may result
in its failure.
Inspect parts for damage, rating and compatibility with
mating parts.
This product should be installed only by competent
personnel trained in good safety practices involving
high voltage electrical equipment. These instructions
are not intended as a substitute for adequate training or
experience in such safety practices.
Failure to follow these instructions will result in damage
to the product and serious or fatal injury.
If this product is supplied with a protective shipping
cover(s), remove this shipping cover(s) and replace with
the appropriate HV insulated cap(s) or connector(s)
before submerging or energizing the circuit.
IMPORTANT
1. Check contents of package to ensure they are complete
and undamaged.
2. Check all components to ensure proper fit with cable
and/or mating products.
Well
Contact
Compression Lug
3. Read entire installation instructions before starting.
4. Have all required tools at hand and maintain cleanliness
throughout the procedure.
2. Cut excess cable squarely at center line of bushing.
Center
Lines
2--- 1/8”
Excess
Cable
20” min. Beyond
End of Cable
Pad Mount Transformer
6--- 7/8”
STEP 2 CABLE PREPARATION
(Use cable cut back template for dimensional guide.)
CABLE CUT BACK TEMPLATE
1. Unwrap and bind concentric neutral wires
8--1/2” back from end of cable.
2. Remove shield and insulation from the cable
end. Cut squarely taking care not to nick the
conductor.
3. Wire brush bare aluminum conductors and
immediately install compression lug. Rotate to
spread inhibitor. Position compression lug sothe
8--- 1/2”
CONTACT THREADED HOLE ALIGNS WITH
THE BUSHING BORE. (Refer to crimp chart
packagedwithcompressionlugfor
recommended crimp tool information.) Start
crimp at the crimp line mark. Rotate 180_ each
successive crimp. Carefully wipe excessive
inhibitor from the outside of the lug and cable.
4. Remove semi--con shield as shown. Bevel
insulation end 1/8” max.
5. Thoroughly clean insulation to remove all
traces of conductive residue.
Bind
8---1/2”
2---1/8”
Align Lug Hole
to Bushing Well
Start Crimp Here
Semi---con
Shield
6---7/8”
1/8” Max.
Bevel
Gap
Insulation
Straight, Smooth & Squared
Do not cut or nick insulation.
Page 3
IS---0354
January 2010
Page 3 of 6
STEP 3BUSHING WELL CONTACT ASSEMBLY
Thread well contact on--to bushing well stud by hand, taking
care not to cross--thread. Tighten with wrench until wrench
bends.
Wrench
Well
Contact
Wrench Hole
STEP 4BUSHING TAP ASSEMBLY
1.Remove protective cap from bushing tap.
2.Remove socket contact stored inside of bushing tap housing.
3.Lubricate the cable insulation and inside the bushing housing with the lubricant supplied. DO NOT SUBSTITUTE. Other
lubricants may be harmful to this product or its mating product(s). Keep insulation clean of dirt and grime. Do not use
excess grease and do not introduce any grease into the gap between the lug and the insulation.
4.Slide the bushing tap onto the cable with a back and forth twisting motion. Wipe off all excess grease.
5.Align bushing with compression lug hole. Assemble socket contact into bushing tap. Socket contact stud must pass
through lug hole.
Lug Hole
Protective Cap
Socket contact
Twist
Lubricate
Page 4
IS---0354
January 2010
Page 4 of 6
STEP 5LUBRICATION AND MOUNTING
1.Inspect the apparatus bushing well to ensure it is dry and free from all contaminants. Lubricate the bushing well interface
area of the bushing tap with the supplied lubricant or ELASTIMOLD approved lubricants.
2.Place the lubricated portion of the bushing tap in the apparatus bushing well. Insert the installation tool in the bore of the
bushing tap until fully seated. Insert the wrench through the wrench hole of the tool and turn in a clockwise direction until the
wrench bends signifying the proper assembly torquehas been reached. Removewrench and installation tool from bushing tap.
Lubricate
Clean Tool
Before Insertion
Installation Tool
Wrench
Page 5
IS---0354
January 2010
Page 5 of 6
STEP 6CONCENTRIC NEUTRAL CONNECTION
1.Insert one end of a No. 14 AWG (2.5mm) copper wire or equivalent through the groundingeye on the bushingtap. Twist tight
taking care not to damage eye.
2.Twist neutral wires and connect to ground using appropriate connector.
Grounding Eye
STEP 7
Thoroughly wipe the bushing tap interface clean of any contaminants and apply a light, uniform coat of supplied lubricant,
working thoroughly into surface. CAUTION: EXCESS LUBRICANT may prevent a loadbreak elbow from being fully seated in
the “locked on” position. Install the mating products to the bushing tap following the instructions supplied with the mating
products. If the bushing tap is not to be immediately mated with an elbowconnector, insulatedcap or grounding elbowconnector,
replace the shipping cap. Do not energize or submerge the apparatus with the shipping cap on the bushing tap. This is a
protective cap only which is not insulatedor water tight and only intended to keep the bushing tap surfaces clean during handling
and installation.
Clean Bushing Connector Interface
and Lubricate Thoroughly
Insulated Cap
or Elbow
Page 6
IS---0354
January 2010
Page 6 of 6
OPERATING INSTRUCTIONS
Before Loadmake or Loadbreak Operation:
Loadbreak connectors must be operated with a full insulated “hotstick” type live--line tool. Consult the company’s safe work
practices for the required live--line tool length.
Remove Fluid Injection or Voltage Test Cap and install Insulated Cap following instructions packaged with these parts.
Area must be clear of obstructions or contaminants that would interfere with the operation of the connector. This position should
allow you to establish firm footing and enable you to grasp the hotstick tool securely, maintaining positive control over the
movement of the loadbreak connector before, during and directly after the operating sequence. Because of the control, speed
and force required to engage or disengage the elbow, certain operating positions are more advantageous than others. If there is
some question as to proper operating position, it is recommended that the connectors be operated de--energized. Do not
connect two different phases of a multiple--phase system. Before closing a single--phase loop, make certain both ends of the
loop are the same phase.
LOADMAKE OPERATION
Check appropriate accessory device operating instructions to be sure that the device is rated for energized operation.
1.Area must be clear of obstructions or contaminants that would interfere with the operation of the connector.
2.In preparing bushing for elbow connector, remove insulated cap by attaching hotstick tool to theinsulated cap pulling eye,
and following the instructions for this accessory, remove from bushing.
3.Securely fasten a hotstick to the loadbreak connector pulling eye.
4.After establishing firm footing and positive control of theelbow connector, withdraw the elbow from the accessory device on
the apparatus parking stand with a fast, straight, firm motion being careful not to place the elbow connector neara groundplane.
5.Place the elbow connector receptacle area over the bushing plug, inserting the elbow male contact (arc follower portion)
into the bushing until the first slightresistance is felt. Resistanceis felt when the arc follower portion of the male contact first
meets the female contact of the bushing (at this point the contacts are approximately 2” apart).
DO NOT HOLD IN THIS POSITION BUT IMMEDIATELY PUSH THE ELBOW HOME WITH A FAST, FIRM, STRAIGHT
MOTION, which will engage the internal lock on the elbow and bushing interface.
Apply sufficient force to engage the internal lock on the elbow connector and bushing interface.
Fault Close
1.It is not recommended that operations be made on known faults.
2.If a fault is experienced, both the elbow connector and the bushing must be replaced.
LOADBREAK OPERATION
1.Place desired accessory device on apparatus parking stand.
Refer to appropriate operating instructions for accessory device to be used. Be certain it is rated for energized operation.
2.Firmly tighten a hotstick to the loadbreak connector pulling eye.
3.Without exerting any pulling force, slightly rotate the connector in order to break surface friction prior to disconnection.
4.Withdraw the connector from the bushing with a fast, firm, straight motion, being careful not to place the connector near a
ground plane.
5.Place connector on appropriate accessory device, following the operating instructions for that accessory.