Thermalright Shaman User Manual

Installation Instructions:
Step 1:RAM heatsinks Installation Step 2:Multiple-thread Screw Installation
After removing stock cooler and RAM heatsinks, clean the surface of GPU and chipsets thoroughly. Then install the RAM heatsinks A/B/C accordingly.
Step 3:Applying Thermal Paste Step 5:Backplate InstallationStep 4:Heatsink Installation
Please refer to the supported VGA list in the first page, and mount the Multiple-Thread Screws into its dedicated holes.
After installing the Multiple-Thread Screws onto the heatsink, make it to go through the mounting holes on the VGA card.
Step 6:Screw Nut Installation Step 8:Installation completedStep 7:Fan Parts Installation
Turn to the back of the VGA card, and put on washers on the exposed Multiple thread screws , then make the backplate to go through the exposed thread screws.
Make the Translucent washers to go through the exposed thread screws again after applying the backplate,then secure it by tightening the 4 screw nuts.
Apply the Anti Vibration strips onto both cutting edges of the heatsink, then pull both ends of the 2 fan clips and make it to go through the mounting holes.
The Ultimate Cooling Solutions !
Attach the TY-140 Fan onto the Heatsink to finish the installation.
www.thermalright.com
Loading...