Thermador KHS48QS, PA48JBS Installation

Backsplash & Keep Hot
Shelf Installation Guide

Installation methods will vary upon need. Before you begin read these instructions carefully. Observe all local codes and ordinances.

2. The height of the hood will determine the height of
WARNING:
To reduce the risk of fire or injury to persons, check to make sure all packaging has been removed from accessory devices before use.

Backsplash Installation

(PA [30,36, 48] JBS)

The backsplash must be installed prior to installing an overhead hood given that the hood shell covers
the top mounting screws of the backsplash.
the top edge of the backsplash. The backsplash should be mounted so that the bottom rear edge of
the hood overlaps the backsplash 1

3. Per each wall stud, use (2) of the provided screws to secure both the top and bottom of the backsplash (see Figure 1).

Due to variable wall stud widths and varying
backsplash widths, in some cases only one wall stud may be found at the mounting location.

4. Remove protective plastic.

1
/
” (38mm).
2
Parts Included Tools Needed
(10) 1” (25.4mm) screws
(1) Backsplash Tape measure
(1) Installation Guide Pencil
To protect against scratches, leave protective film on backsplash until after installation is complete.
If range is already installed, refer to the manufac­ture’s instructions to disconnect gas and power supplies. Move range forward to gain access to rear of unit.

1. Locate and lightly mark wall studs.

Wall studs are usually installed with a 16” or
24” (406mm or 1372mm) space on center.
Phillips screwdriver or drill
42” (1070mm)
all Studs
W
30”, 36”, 48”
(760mm, 913mm, 1218mm)
Space screws evenly
across top & bottom

Figure 1: Backsplash Installation

English 1

Installing a Backsplash with a Keep Hot Shelf

2. The height of the hood will determine the height of the top edge of the backsplash. The backsplash should be mounted so that the bottom rear edge of
the Keep Hot Shelf overlaps the backsplash 11/2” (38mm).

3. At the locations indicated in Figure 3, mount the lower shelf brackets included with the Keep Hot Shelf through the Backsplash and into the wall studs.

Due to variable wall stud widths and varying backsplash widths, in some cases, only one wall stud may be found at the mounting location.

4. Remove backsplash protective covering.

5. Start with the Keep Hot Shelf Installation.

Figure 2: Backsplash with a Keep Hot Shelf

A hood can be installed first if the Backsplash is to be installed with a Keep Hot Shelf given that the Keep Hot Shelf covers the top mounting screws of
the Backsplash (Figure 2).
To protect against scratches, leave protective film on the backsplash until after installation is com­plete.
If range is already installed, refer to the manufac­ture’s instructions to disconnect gas and power supplies. Move range forward to gain access to rear of unit.

1. Locate wall studs.

Wall studs are usually installed with a 16” (406mm) or 24” (1372mm) space on center.
Lower Shelf Brackets
Included With Keep Hot Shelf

Figure 3: Backsplash with a Keep Hot Shelf

English 2
Keep Hot Shelf
(KHS [30,36,42,48] QS)
5/8”
(16mm)
Items Included
7
13
/
8
(352mm)
Edge will slide
30”, 36”, 42”, 48”
(762, 914, 1067, 1219mm)
op Rack
T
beneath hood
Folds Up
Clip (x2)
10
1
/
” (257mm)
8
Bottom Rack
Clip (x4)
Keep Hot
Rack (x2)
1
13
/2”
(343mm)
Tools Needed
(12) 1” (25.4mm) (4) 1/2” (12.7mm) screws
(4) U-Nuts
(2) Top shelf brackets
(4) Lower shelf brackets
(2) Keep hot racks
(1) Keep hot shelf backsplash
(1) Installation guide & template
Tape measure Phillips screwdriver or drill Painter’s Tape Sharp knife or scissors Pencil
English 3
1. Tape the templates included with the Keep Hot Shelf to the wall accordingly:
Tape the sheet titled Left Hand Template to bottom and left end of hood. Align the bottom line of hood with the top line of the template.
Tape the sheet titled Right Hand Template to bottom and right end of hood. Align the bottom line of hood with the top line of the template.
Tape the sheet titled Installation Instruction so that the arrow at the top of the template aligns with hood centerline. Align the bottom line of the hood with the top line of the template.
Left to right sides of the template must be equal to length of shelf.
2. Mount the (2) top shelf brackets and the (3) lower shelf brackets at the locations outlined on the templates. Secure with the (10) 1” (25.4mm) screws provided.
3. Cut template out from around the brackets and remove from the wall. Do not discard template before the Keep Hot Shelf is completely installed.
4. Insert the (3) U-Nuts onto the (3) lower shelf brackets.
5. Install the wall plate by setting the corner notches (back of wall plate) atop the (2) top shelf brackets. Slide the shelf upwards until the bottom engages with the (3) lower brackets (Figure 4).
Upper shelf bracket (x2)
Lower shelf bracket (x4)
Notches (x2)

Figure 4: 48” Back of Wall Plate

6. Check if the top is properly secured by pulling the top section of the shelf from the wall.
7. Secure to bottom of shelf with the (4) 1/2” (12.7mm) screws provided.

For 48” Keep Hot Shelf

Follow steps 1-6 except use (4) lower brackets which must be spaced equally 15” (381mm) center-to-center
English 4
Loading...
+ 8 hidden pages