Termomont TKK3 max 100, TKK3 max 120, TKK3 max 150, TKK3 max 200, TKK3 max 250 Instruction Manual

...
Solid fuel hot water boiler
TKK3 max 100-300 KW
INSTRUCTIONS MANUAL
for usage and maintenance
Prhovacka bb 22310 Simanovci, Srbija
Tel/Fax. +381 22 480404 +381 63 259422
oce@termomont.rs www.termomont.rs
Contents
1 Boiler design 2
1.1 Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.2 Technical data chart according to EN 303-5 . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.3 On Product . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2 Recommendations for boiler shipment and storage 3
2.1 Delivery form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.2 What's in the box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3 Boiler installation 4
3.1 Boiler placement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.2 Chimney . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4 Boiler installation 5
4.1 Fitting the boiler to an open central heating system. . . . . . . . . . . . . . . . . . . . . . 5
4.2 Filling up the boiler and installation with water . . . . . . . . . . . . . . . . . . . . . . . . 6
5 Boiler operation 6
6 Boiler cleaning and maintenance 7
1
1 Boiler design
Parts of the boiler: 1. Combustion chamber 2. Hot water 3. Flue gases 4. Return 5. Flow 6. Upper opening for cleaning 7. Upper door for fuel feed 8. Lower door for fuel feed and ash cleaning 9. Primary air ap 10. Side openings for cleaning 11. Base 12. Insulation 13. Boiler housing 14. Draught regulator mounting place 15. Air vent connection 16. Drain tap
1.1 Dimensions
Boiler type Weight (kg) B (mm) H
(mm)L(mm)
A (mm) E (mm) F (Φ)
100 630 935 1500 1540 1330 220 2 120 760 935 1600 1665 1430 220 2 150 805 1035 1670 1675 1500 220 No65 200 1030 1205 1720 1785 1535 220 No80 250 1500 1355 1800 2075 1570 330 No80 300 1700 1600 1800 2075 1570 330 No80
1.2 Technical data chart according to EN 303-5
2
Nominal power* TKK3 max (KW) 100 120 150 200 250 300 Power range* (KW) 80-110 100-
130
130- 180
180- 240
220- 290
270-
350 Necessary draught (mbar) 0.29 0.3 0.35 0.41 0.45 0.5 Water content (l) 170 230 290 320 350 430 Output gas temperature at nominal power (C) 250 250 250 250 250 250 Temp. regulation range (solid fuel) (C) 60-90 60-90 60-90 60-90 60-90 60-90 Minimum temp. return line (solid fuel) (C) 60 60 60 60 60 60 Eciency 78% 78% 77% 75% 75% 75% Boiler class*** 2 2 2 2 2 2 Required chimney height** (m) 9-10 10-11 11-12 11-12 12-13 15-17 Required chimney inner diameter** (mm) 250 250 300 350 350 350
1.3 On Product
This boiler is aimed for manual feed of solid fuel (brown coal, rewood, brickets or biomass with declared caloric value greater than 15000 KJ/kg).
Boiler is constructed by welding steel plates (4-6 mm thickness). Manufacturing process was per- formed by strict following the guidelines of the corresponding European norms EN 303/5 and ISO
9001. Only certied materials are built in as required by EN 10025, EN 10028-2, EN 10120 and EN 10088-2.
Eciency of the boiler is higher than 75% thanks to its three pass construction.
Upper and lower door are covered by refractory insulation material based on VERMICULITE mineral - large amount of heat is kept in the boiler as a consequence.
Boiler has capacious upper door to facilitate manual feeding of the solid fuel.
Combustion control is done by draught regulator (to be ordered separately and mounted on boiler before use).
Maximum working pressure is 4 bar. Water control test is done on 6 bar.
Boiler is delivered with cleaning kit.
2 Recommendations for boiler shipment and storage
2.1 Delivery form
The boiler is wrapped with plastic sheet, the whole set is transported on wood pallet. The boiler must always stand in its vertical position. The rotation of the boiler during the shipment or installation represents a serious risk and can lead to damaging the boiler. It is forbidden to stack boilers vertically one onto other. The boiler can be stored only in closed rooms with no atmospheric inuence. The humidity in the storing room also must not exceed the critical value of 80%, so as not to create any condensate. The temperature of the storing room must be in the range of +/- 40 C.
2.2 What's in the box
The following parts are supplied together with the boiler:
Cleaning kit
Warranty note
3
3 Boiler installation
3.1 Boiler placement
The boiler room should have air-conditioning. Equation for the are aof opening for fresh air necessary for boiler room is given below:
A(cm2) = 6, 02 · P(KW )
where P is nominal boiler power in KW. The boiler should be mounted in the boiler room permiting access to all its parts as shown below:
3.2 Chimney
Boiler connection to the chimney is shown in the gure:
Proper dimensioning of the chimney is a very important premise for optimum boiler performance.
The purpose of the chimney is to take out the products of combustion but also to secure necessary air
4
draught in the boiler. The graph shows how to chose the necessary height for the chimney as a func- tion of chimney opening. Proper chimney insulation is very important and should be at least 50 mm thick.
Depending on the necessary draught of the boiler, the cross section and the height of the chimney are determined. Please advise technical material given by chimney producer. Minimum chimney height for TKK3 max 120 wood boiler is 9 m. Estimate for chimney height is given in the technical data chart. Round chimney made of stainless steel modules is recommended in order to keep the condensation inuence low.
4 Boiler installation
This boiler can be connected only to an open central heating system.
4.1 Fitting the boiler to an open central heating system.
The connecting scheme of an open central heating system is depicted on the gure.
Open expansion vessel is connected to the hot-water distribution pipes (FLOW and RETURN) as shown on Figure with an additional OVERFLOW pipe output plus CIRCULATION pipe (to prevent freeze during winter months).
Please note that no additional items shall be connected to the open expansion vessel especially not valves.
The size of expansion vessel is deducted from the following equation:
V = 0, 07V
water
(l)
V
water
(l)
is the water volume in the entire installation.
Open expansion vessel is to be positioned vertically above the highest heating element. Both ow an return line connecting the open expansion vessel must be insulated (40 mm thickness). if the expansion vessel is outside the heating area, the vessel itself should be insulated.
5
4.2 Filling up the boiler and installation with water
Filling is done using the drain tap valve (to be found on the return line close to boiler). The lling process is done when no air is coming out. Working pressure depends on the overall height of the system and the open expansion vessel (1 bar for each 10 m is an estimate).
After the lling process is done, it is obligatory to close the drain tap valve, close the water supply to the water-lling pipe and detach the water-lling pipe.
Pay attention to quality of water which is used to ll the heating system.
A
n expert should be entrusted with the mounting of the heating and the initial operation. This must be a person who will take over the responsibility and guarantee the correct operation of the boiler and of the complete central heating system. In the case of an incorrectly planned system with manifesting deciencies caused by the respective person's incorrect installation of the system, which can again lead to an incorrect operation of the boiler, the complete liability for the material damage and potential new costs arising in relation to it is borne exclusively by the person who was entrusted with the mounting of the central heating system, and not by the boiler manufacturer, sales representative or seller.
5 Boiler operation
First putting into operation is performed exclusively by a skilled person. Before putting in operation please make sure that:
boiler is connected on central heating installation properly
boiler is connected on electric installation properly (when using pellet or oil burner)
there is no air in the central heating installation and pressure is within range
proper working cycle for circulation pump is chosen.
Heating by solid fuel (manual operation) can be performed in two ways:
1. Heating from above put coal (or wood) over the replace pipes (grid) (no ash should be present). The draught regulator is at the maximum position. Using a tiny piece of wood or coal, light a re on the top. When the re begins to burn, draught regulator is set on desired temperature / position.
2. Heating from below put small amount of solid fuel over the replace pipes (grid) (no ash should be present) and set up a re. The draught regulator is at the maximum position. When the re begins to burn, add larger amount of fuel and set draught regulator on desired temperature / position.
Make sure that lower boiler doors are closed during boiler use.
In case of an uncontrolled increase of pressure and temperature of the water in the boiler, due to various reasons (such as power failure causing interruption of the circulation pump operation, circulation pump defect, uncontrolled entry of air into system) close all air supply to the boiler or eventually take the re out if the safety conditions allow that (there are no inammable materials in the area). In case of power failure put the draught regulator in the zero position and the ap on the boiler chimney take-up in the closed position.
It is obligatory to pay special attention that the pressure inside the installation is within range. If the pressure is below the critical value, stop the boiler operation and rell the system when the boiler is cold.
The water hardness may not exceed the recommended value. If you heat the boiler using coal, de- pending on the kind of coal and quality of combustion, boiler is to be cleaned in detail at least every 30 days. Dirtier the boiler, the eciency of the system is smaller.
6
It is not allowed to extinguish the re in the boiler articially, it is forbidden to sprinkle the water inside the heating chamber. After the heating season boiler should cleaned from ash and soot and the chamber should be treated with some protection agent against corrosion.
In case of any mechanical problem (the draught regulator is blocked, or the circulation pump is defect) stop the boiler operation rst only when the boiler is cold, reparation action can be undertaken.
6 Boiler cleaning and maintenance
It is recommended that the boiler is cleansed from ash once to two times weekly. A detailed cleansing of the boiler should be done once a month and also when the heating season ends. Regular maintenance extends the service life of the boiler. Cleaning is to be done through upper and lower door of the boiler but also using the opening on the back side (chapter 1, position 10).
7