Datasheet 78M6612 Datasheet (TERIDIAN Semiconductor)

Simplifying System In tegrationTM
78M6612 AC-PMON Evaluation Board
User Manual
February 1, 2010
Rev. 1.1
UM_6612_013
78M6612 AC-PMON Evaluat ion B oar d User M anual UM_6612_013
© 20 10 Teridian Semic onductor Corporation. All r igh ts r eserved . Teridian Semiconductor Corporation is a registered trademark of Teridian Semiconductor Corporation. Simplifying System Integration is a trademark of Teridi an Semiconductor C or poration . Microsoft, Windows, Vista, an d Excel are registered trademark s of Microsoft Corporati on. CA51 is a tr adem ar k of Keil, An A RM
®
Company. Signum Systems is a trademark of Signum Systems Corp. Lab VIEW, NI and NI-VISA are trademarks of N ational Inst r uments. All other trademar ks are the pr operty of their res pect ive owners.
Terid i an Semiconduc tor Corporation makes no warranty for the use of its p r oduct s, other than expressly contained in the Comp any’s warranty d etailed in the Terid ian S emiconductor Corporation st andar d Terms and C onditions. The company ass umes no responsib i lity for any errors whi ch may appear in this document, reserves th e r i ght to change devic es or sp ecifications detailed herein at any time withou t notice and does n ot make any commitm ent to upd ate the information contained herein. Accordingl y, the reader is cautioned to verify that t his document is current by comparing it to the latest vers ion on http://www.teridian.com or by checking wit h your s ales repr esentati ve.
Terid i an Semiconduc tor Corp., 6440 Oak Canyon, Suite 100, Ir vine, CA 92618
TEL (714) 508-8800, FAX (714) 508-8877, http://www.teridian.com
2 Rev. 1.1
UM_6612_013 78M6612 AC-PMO N E valuation Board User M anual
Table of Contents
1 Introduction ................................................................................................................................... 5
1.1 Pack age Con tents ................................................................................................................ 5
1.2 System Requirements ........................................................................................................... 5
1.3 Safety and ESD Not es .......................................................................................................... 6
1.4 Firmware Demo Code Int r oduct i on ........................................................................................ 6
1.5 Testing the AC-PMON Evaluat ion B oar d Pri or to Shippin g .................................................... 6
2 Installation ..................................................................................................................................... 7
2.1 USB Driver Installation .......................................................................................................... 7
2.2 Confirm CO M Port Mapp ing .................................................................................................. 8
2.3 Basic Connection Setup ........................................................................................................ 9
2.4 Verify Serial Connect i on to the PC ...................................................................................... 11
2.5 NI RunTime Installation ....................................................................................................... 13
2.6 Install LabWin dows™ X P Pro Upd ate ................................................................................. 16
3 Operating the Dashboard GUI ..................................................................................................... 19
3.1 Port Selection ..................................................................................................................... 19
3.2 Creating a Measurement Data Log Fi le ............................................................................... 20
3.3 Selecting the Power Disp l ay Parameter .............................................................................. 20
3.4 Selecting the Displ ay Scales ............................................................................................... 21
3.5 Resetting the Mi n and Max I ndi cators to Their Current Val ues ............................................. 21
3.6 Begin Tracking Minimum and Maximum Conditions ............................................................ 22
3.7 Selecting Outlet1 ................................................................................................................ 22
3.8 Selecting Wide Band or Narrow Band Measurement ........................................................... 23
3.9 Selecting the Sample Interval .............................................................................................. 23
3.10 Alarm Stat us ....................................................................................................................... 23
3.11 Neutral Voltage Alarm ......................................................................................................... 24
3.12 Line Frequency ................................................................................................................... 24
3.13 Acc um ulated Energy Usag e and Expen se Tracking ............................................................ 25
3.14 Displaying Narrowband and Wideband Values Simu lt aneously ........................................... 25
3.15 Using the Parameter Gr aph ................................................................................................ 26
3.16 Setting Alarm Status Thresholds ......................................................................................... 26
3.17 Relay Configuration Con trols .............................................................................................. 27
3.18 Log File Import to Excel® ..................................................................................................... 28
4 Schematics, Bill of Materials and PCB Layouts ......................................................................... 31
4.1 78M6612 AC-PMON Evaluat ion B oar d Sch emati cs ............................................................. 31
4.2 78M6612 AC-PMON Evaluat ion B oar d Bill of Materials ....................................................... 33
4.3 78M6612 AC-PMON Evaluat ion B oar d PCB Layouts .......................................................... 34
4.4 USB Daughter Board Schemati cs ....................................................................................... 35
4.5 USB Daughter Board Bill of Materials .................................................................................. 35
5 Ordering Information ................................................................................................................... 36
6 Included Documentation ............................................................................................................. 36
7 Contact Information ..................................................................................................................... 36
Revision H istory .................................................................................................................................. 36
Rev. 1.1 3
78M6612 AC-PMON Evaluat ion B oar d User M anual UM_6612_013
Figures
Figure 1: AC-PMON Connecti ons ............................................................................................................ 9
Figure 2: AC-PMON Application Diagram Figure 3: 78M6612 Evaluation Board Electrical Schemati c (1 of 2) Figure 4: 78M6612 Evaluation Board Electr ical Schematic (2 of 2) Figure 5: 78M6612 Evaluation Boar d PC B Top View Figure 6: 78M6612 Evaluation Board PCB Top Copp er Figure 7: U SB Daughter Board Electrical Sc hematic
Table
Table 1: COM Port Setup Parameters .................................................................................................... 11
Table 2: 78M6612 Evaluat i on Board Bi l l of Mater ials Table 3: USB Daughter Board Bi l l of Materials
................................................................................................ 9
......................................................... 31
......................................................... 32
............................................................................. 34
.......................................................................... 34
.............................................................................. 35
.............................................................................. 33
....................................................................................... 35
4 Rev. 1.1
UM_6612_013 78M6612 AC-PM ON Evaluation Board User Manual
1 Introduction
The Teridian Semi conductor C or porati on (TSC) 78M6612 AC-PMON Evaluation B oar d is an elect r ical measurement unit for performi ng m easurements from a si ngle electrical outlet. It incor porates the TSC 78M6612 single-phase, dual-outlet, power and energy meas urem ent IC. The AC-PMON Evaluation Board is connec ted to P C throug h a USB cable su ch as one provided in the demo kit package. The Evaluation Board demonst r ates the capabilit y of the 78M6612 energy meter con troller ch ip for measurement accuracy and overall s ystem use.
The board is pre-program med with demo firmware (fil e name 6612_OMU_S2_URT_V1_13.hex) in the flas h memory of the 78M6612 IC that allows evaluation of the capability of the IC.
Included with the AC-PMON is a Windows Interface (GUI) for simplified acces s to the following measurement data and controls :
Power, curren t, voltage and power fac tor in dicator dials
Adjustab l e displ ay scales
Minimum and peak parameter trac king
Select able strip chart disp lay format
Narrow-band versus Wide-band measurement
Select able sampl e size aver agin g
Accumulated energy usage and expense tracking
Line frequency
Alarm indicators
Programmable Alarm thresholds
D ata log to file
Alternatively, the user can directly query the device with the command set using HyperTerminal and the provided 6612_OMU_S2_URT_V1_13 Firmware Description Document.

1.1 Package Contents

based Graphical User
The 78M6612 AC-PMON Evaluation Board Demo Kit includes:
78M6612 AC-PMON Evaluation Board
U SB Daughter Board
USB Cable Assembly USB A-B 28/ 24 1.8M (Tyco/Amp 14 8 75 88-3)
CD with O M U Software and D ocumentation

1.2 System Requirements

The 78M6612 AC-PMON Evaluation Board requires use of a PC with the following features:
PC (1 GHz, 1 GB) with Microsoft® Windows XP or Win2000, equipped with USB port.
Minimum 1024 x 768 video di splay resolution.
Rev. 1.1 5
78M6612 AC-PMON Evaluat ion B oar d User M anual UM_6612_013

1.3 Safety an d ESD No tes

EXERCISE CAUTION WHEN LIVE AC VOLTAGES ARE PRESENT!
Standard ESD precautions must be taken when handling electronic equipment. The AC-PMON contains ESD protected interfaces.
Do not connect test equipment, ICE emulators or external development boards directly to the OMU-RF hardware. Damage to the OMU1-S-RF and external equipment will occur due to the 78M6612’s “ hig h side ” reference topo logy. The 78M6612’s V3P3 (i.e. “high side”) is connected directly to Neutral (Earth Ground) creating a ground reference disparity with any properly grounded external equipment.

1.4 Firmware Demo Code Introduction

The Firmware Demo C ode provides the followin g features:
Basic energy measur ement data such as Watts , Volts , current, VAR , VA, ph ase ang le, power factor,
accumulated energy, frequency, date/tim e, and various alarm statu ses.
Control of alarm th r esholds, calibr ation coeffici ents , temperature compensation, etc. There ar e two m eans t o fac ilitate performanc e evaluation between the user at the PC hos t and th e
firmw ar e code in the board:
The Graphical U ser Interface (GUI). This document d escribes the i nstallation and us e of the
Windows based GUI.
Th e Command Line Interface (CLI) via HyperTerminal or comparabl e terminal emulator on a di fferent
operat ing system. For i nform ation about the CLI, see the 6612_OMU_S 2_URT_V1_13 Firmwa r e Description Document.
The AC-PMON is shipped with D emo Code Revision 1. 13 or lat er loaded in the 78M6612 chip and included on the CD. The code revis i on can be verified by entering the c om mand >i via th e command line interface. Firmware for th e Demo Unit can be updated using ei ther the Teridian TFP1 or an in-circuit emulator such as the Signum Systems™ ADM-51 (
http://www.signum.com/Signum.htm).
The board components and firmware settings are desig ned to operate with the following nominal AC electr i cal ranges:
Voltage Current Line Frequency
110-240 VAC 10 mA – 20A 46-64 Hz

1.5 Testing the AC-PM O N Evalu ati on B oar d Prior to Shipping

Befor e every AC-PMON Evaluat ion B oar d is shipped, the following procedures have been performed at the factor y:
Full Calibration – Precis e energ y source equipment is used to calibrate the c urren t and voltag e. The
tem perature is al so calibrated at the same time.
A ccuracy Test – This “bench” level test ensures the energy accuracy is within +/-0.5%.
6 Rev. 1.1
Loading...