Tektronix 4200-SCS Quick Start Guide

Customer Self-paced E-learning Sequence for
Keithley Model 4200-SCS Semiconductor Characterization System
Overview:
This document gives the recommended sequence for customer self-paced e-learning and tooling setup that Keithley has found to be effective and efficient for training new users of the Keithley Model 4200-SCS Semiconductor Characterization System. Total time required: Approximately 2 hours.
Prerequisites
1. It assumes the reader knows the measurement basics of using source-measure units.
2. It assumes the reader has general knowledge of best practices for standard testing of semiconductor devices such as a MOSFET.
3. It assumes the customer has access to a properly set up Keithley 4200-SCS running Windows XP. Information on doing that can be found in the Model 4200-SCS Startup Guide, Packing List PA-716 which is available on the internet at
http://www.keithley.com/data?asset=5251 .
4. Review the system overview and introduction at
http://www.keithley.com/data?asset=50733 .
5. This document has references to specific sections of the 94-page 4200-SCS Semiconductor Characterization System Quick Start Guide 4200-903-01 Rev. C / May 2006. The customer needs to have a copy of that document, which is available on the internet at http://www.keithley.com/data?asset=50695 .
This document is organized into these 4 sections:
Test Setup
Test Execution
Data Analysis
Verification of results / troubleshooting
Common Usage Errors
Test Setup
1. How do I connect make basic connections from my 2-terminal or 3-terminal DUT to the 4200 SMU(s) with/without Pre-Amp? Refer to page 1-14 of the 4200-SCS Quick Start
Guide.
2. How do I enable output voltages above the 20V default, up to 200V? Refer to page 1-13 (Interlock Cable connection) of the 4200-SCS Quick Start Guide.
Last updated: 10-Jan-2008 p. 1 of 3
3. How do I create a new project? Refer to page 2-6 to 2-10 of the 4200-SCS Quick Start Guide.
4. How do I create multiple sites for the project? Refer to page 2-30 of the 4200-SCS Quick Start Guide.
5. How do I configure the Stress/Measure cycle using the 4200-SCS? Refer to page 2-33 to 2-38 of the 4200-SCS Quick Start Guide.
6. How do I configure a Forcing Function window for the device terminal(s)? Refer to page 2-16 of the 4200-SCS Quick Start Guide.
7. How do I configure an ITM (Interactive Test Module)? Refer to page 2-11 to 2-12 of the 4200-SCS Quick Start Guide.
8. How do I create a user module / user library? Refer to page 2-24 to 28 of the 4200-SCS Quick Start Guide.
9. How do I connect external instruments to the 4200? Refer to page 1-13 of the 4200-SCS Quick Start Guide.
10. How do I configure the 4200-SCS after adding external instruments? Refer to page 1- 19, 1-20 of the 4200-SCS Quick Start Guide.
11. What are the differences between an ITM (Interactive Test Module) and an UTM (User
Test Module)? Refer to page 2-5 of the 4200-SCS Quick Start Guide.
Test Execution
12. How do I execute an entire project? Refer to page 2-30, 2-31 of the 4200-SCS Quick Start Guide.
13. How do I execute a test in the project? Refer to page 2-28, 2-29 of the 4200-SCS Quick Start Guide.
14. How do I append test data(s) without clearing the previous test data? Refer to page 2- 30 of the 4200-SCS Quick Start Guide.
Data Analysis
15. How do I view the test results? Refer to page 3-3, 3-4 of the 4200-SCS Quick Start Guide.
Last updated: 10-Jan-2008 p. 2 of 3
Loading...
+ 1 hidden pages